US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, 2003 - Incandela 1 CMS Si Tracker: Breakout Session Dept.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
Schedule & Plans Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
FNAL Production Experience
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
US Module Production Status
UCSB Testing Status Anthony Affolder
Results from module testing
UCSB Testing Status Anthony Affolder
On behalf of the US TOB testing group
US Testing Mailing List
Module production in Italy
Hybrid & Module Electrical Testing
US Hybrid/Module/Rod Testing Model
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
Current Necessary for CMN Problem
US Module Testing Progress Report
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept. of Energy/National Science Foundation Review of the U.S. ATLAS/CMS Detector Projects May 20, 2003 J. Incandela: L2 Manager University of California Santa Barbara

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 2 Executive summary Many significant achievements this past year  Technical concerns have been alleviated and parts are flowing Regina Demina follows this closely for the US and will present a detailed summary next. We have taken a number of steps to help this effort: Hybrids work at UCSB & Sensor QA at Rochester  Both US production lines are complete & well-exercised ! Results are excellent: More details below.  US Module testing is the template for the tracker project Tony Affolder has been a great new addition to the testing effort and has brought much CDF experience. He will present the status of this work. Remaining problems/concerns: None are severe.  Hybrids are ok now. Production this summer will be a test of capacity.  Test equipment and software We are ok for ramp up now but need to complete our full suite in order to do complete testing and large volume testing  Manpower FNAL: was a big concern – recent efforts have begun to pay off UCSB: Fine for now and has a good pool of students to draw on  Technical issues Recently have seen some damage in transport – under investigation now

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 3 Fermilab (FNAL) L. Spiegel, S. Tkaczyk +2+2 technicians Kansas State University (KSU) T.Bolton, R.Demina, W.Kahl, S.Korjenevski, R.Sidwell, N.Stanton University of California, Riverside (UCR) Gail Hanson, Gabriella Pasztor, Patrick Gartung University of California, Santa Barbara (UCSB) A. Affolder, S. Burke, C.Campagnari, A. Gupta, D. Hale, J.Incandela, S. Kyre, S. Levy, C. Mills, S.Stromberg, R. Taylor, D. White +3 technicians +2 undergraduates University of Illinois, Chicago (UIC) E. Chabalina, C. Gerber University of Kansas (KU) P. Baringer, A. Bean, L. Christofek, D. Coppage University of Rochester (UR) R. Eusebi, E. Halkiadakis, A. Hocker, P. Tipton Manpower growth Recent additions (over past year or so) are indicated in blue

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 4 Overview FNAL and UCSB will have equal capabilities and capacities  FNAL production line Gantry operational – made ~20 operational TOB modules. 2 of 4 DAQ and 2 of 4 ARCS  UCSB Production line Gantry operational –made ~10 operational TOB modules 1 of 3 DAQ and 3 of 5 ARCS  UCR module diagnostics and repair 0 of 1 DAQ and 0 of 1 ARC TOB Module Summary Table

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 5 New Tasks and Rods Hybrids  Final assembly at CERN a bottleneck. US Helping in two ways: G. Pasztor (UCR) at CERN We’ll now do the final wirebonding and thermal cycle tests at UCSB  Wirebonded and Tested: UCSB Quick Test then Wirebond pa’s Thermal cycle with continuous ARC test and pitch adapter pulsing Adds 3.3 M bond wires !  Ship half to FNAL Module production: FNAL & UCSB  Fast test with ARC/LED Simple repairs  Overnight temp cycling with readout in “Vienna box”  Full characterization with ARC/LED Rods  Have infrastructure being prepared and space available.  Have identified personnel UCSB: Dean White with Sean Stromberg and others FNAL: Rochester physicists and FNAL techs.  CERN tooling is en route Will likely need modification after we gain some experience.

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 6 Mod 1Mod 2 Mod 3 Without 2D With 2D FNAL Gantry Random Errors Original 5  m spec not always met so far. New 10  m spec is not a problem To improve with new tools…

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 7 UCSB Silicon Strip Offsets

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 8 Silicon Relative Angle

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 9 Silicon Angle on Frame

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 10 Silicon-Frame Positioning (example)

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 11 Hybrid Angle

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 12 Wirebonding FNAL ok now with new bonder…  Saved ~120k$ UCSB has 2x as many bonds  Wise to find a used K&S 8060 Smaller work table than 8090: Adequate for hybrids but not ideal for modules Much more common than 8090 and frequently seen on used market for < 100k$

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 13 Status of equipment Quick test hybrids on ARCGantry makes modules. Modules test on ARC Assemble rods from modules Rod burn-in Rods shipped to CERN Thermal cycled module Wire bond Final pinhole test on ARC Wire bond Thermal cycle hybrids

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 14 Fragile components Transportation a serious business Careful visual inspection of components necessary Recent experience has been awful  6 US modules made at both locations in 4 shipments by 3 transportation methods were received by CERN with similar severe damage!  Change to more flexible glue ? – under investigation – not expected to be a long-term problem but likely to be a long-term worry.

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 15 Tracker: Transition to M&O Abrupt shift to M&O in FY06 reflects the fact that we anticipated and included adequate resources for pre-ops in original project file. See my talk later for basis of resource estimates.

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 16 Tracker Milestones (v33) V33: TOB complete in April ‘05. We currently schedule our completion by April 2005  This is about 3 months looser than CERN schedule  High probability of completion by Sep. 30, 2005 – additional 6 mo.contingency

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 17 Tracker Project Resources Roughly on track but peak will likely shift a bit UCSB currently pat FNAL in the process of gaining a few people as needed

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 18 Tracker FY03 Planning 2 Rochester technicians involved in FNAL production lines Mostly production labor No contingency used (yet)

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 19 Summary We feel that actual mechanical fabrication infrastructure – both equipment and manpower- is in very good shape in the US  Database still needs to be finalized but is not critical  Some new problems with glues expected to be resolved quickly The main issues now for the US groups are:  Testing: test equipment and software This is probably the area of greatest activity this past year US playing very big role in establishing protocols Currently limits are overall throughput  Components schedules Vast improvement and resolution of many issues over past year We have nearly continuous information flow All the right steps have been taken in Europe and US Remains now to see how the big orders work out. Agenda for remaining talks  Have therefore scheduled talks in this breakout session that only cover these two main points regarding production  Also include a talk on M&O