PennDOT Research Program Got Research? Repair Methods for Prestressed Girder Bridges.

Slides:



Advertisements
Similar presentations
Recommended Guide for Next Generation of Transportation Design-Build Procurement and Contracting in the State of Georgia Russell McMurry, P.E. Chief Engineer.
Advertisements

W E L C O M E.
Actions and Retrofit of Post Earthquake-Damaged Bridges
GTI’s Composite Materials (CM) Program
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Idaho Load Rating Program
Research & Innovation Implementation Program Building on Success for PennDOT.
STIC’in It… Integrating the Pennsylvania STIC into the PennDOT Research Division State Transportation Innovation Council.
VDOT LRFD Software Andy Zickler VDOT Structure and Bridge Division Central Office September 8, 2006.
Building & Using an Effective Leadership Team Kathi Cooper Aida Molina Bette Harrison Sandy Lam.
Concrete and Concrete Pavements Research Group. Meet the research team… 3 PhD Students 4 MS Students 1 Undergrad.
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
1 Chapter 4 The Software Team Requisite’s 6 team skills for effective requirements management.
Differentiated Accountability Strategies and Support Dr. Maria P. de Armas Assistant Superintendent Curriculum and Instruction (K-12 Core) Curriculum.
CNA Report. I. Executive Summary Keep short Simplify findings Include qualitative judgments about implications.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
Capability Maturity Model (CMM) Done By :Delayel Alhajeree.
GUIDELINES AN INTRODUCTION TO: Evaluation TECHNICAL
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction Partners in Support of Student Achievement: California Department.
Minia Univresity Council for Education Affairs Meeting - July Higher Education Enhancement Project Fund (HEEPF) Improving Transportation Engineering.
1 Introduction to Quality Improvement Concepts. 2 Objectives  Name several of the quality improvement tools that are used in quality improvement initiatives.
Value Engineering at FHWA
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Selecting Application.
1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
LRFR vs. LFR Virtis Opis User Group Meeting, August 2, 2011
FHWA Reorganization Update Program Performance Management Standing Committee on Performance Management Meeting Detroit, MI October 14, 2011 Peter Stephanos.
PA Non-composite Adjacent Box Beam Bridges PennDOT June 2006 A presentation adapted from the AASHTO T-18 Bridge Inspection Technical Committee Meeting.
PennDOT’s Study of NCHRP Research Results Implementation TRB State Representatives & AASHTO National RAC Meetings July 27, Michael Bonini Transportation.
Webinar on Load Rating of Gusset Plates in Steel Truss Bridges by the LFR Method September 24, :00 p.m. to 3:30 p.m. Sponsored by FHWA in Cooperation.
Lunda Quality Management Plan Contractor-Engineer Conference Presentation January 22, 2009.
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
© Copyright 2005 In association with A division of Bytes Technology Group South Africa (Pty) Limited Client logo Partnership Models for Sustainable e-Government.
Managing a Research Program from Various Funding Sources Sandra Larson, P.E. Research and Technology (R & T) Bureau Director Iowa Department of Transportation.
Indiana High Value Research Tommy Nantung INDOT Research and Development.
Essential Resources for the Infection Preventionist Ruth Carrico PhD RN FSHEA CIC Associate Professor Division of Infectious Diseases University of Louisville.
Bridge Girder Alternatives for Extremely Aggressive Environments Project Manager: Will Potter, P.E. - FDOT Research Team: Jeff R. Brown, PhD, Assoc. Professor.
RATE OF DETERIORATION OF BRIDGESAND PAVEMENTS AS AFFECTED BYTRUCKS RATE OF DETERIORATION OF BRIDGES AND PAVEMENTS AS AFFECTED BY TRUCKS Terry Swygert South.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Overview of the “Recommended LRFD Seismic Design Specifications for Highway Bridges” Ian M. Friedland, P.E. Bridge Technology Engineer Federal Highway.
1 Response to Intervention Lou Danielson, Ph.D. Director, Research to Practice Division Office of Special Education Programs June 21, 2006.
1 Response to Intervention Lou Danielson, Ph.D. Director, Research to Practice Division Office of Special Education Programs June 21, 2006.
Comprehensive School- Improvement Assessment (CSA) Iowa Association of School Boards IASB.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
U.S. Department of Transportation Federal Highway Administration 1 Adaptation to Global Climate Change Effects: FHWA Activities AASHTO Subcommittee on.
Robert Pollack October 26, FHWA Safety Data Initiatives.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
RECORD EVALUATION OF A BRIDGE UNDER THE NAPA EARTHQUAKE RECORD EVALUATION OF A BRIDGE UNDER THE NAPA EARTHQUAKE Omar Alcazar Pastrana [Dr. Carlos E. Ventura]
RESEARCH PROGRAMS GETTING OFF ON THE RIGHT FOOT AND STAYING THERE Sue Sillick Montana Department of Transportation July 28, 2010 Methods to Ensure the.
CI1697-R: Bridge Modeling Approaches Dave Simeone – Senior Product Manager, AutoCAD Civil 3D Edmundo Herrera – Autodesk Technical Specialist, Transportation.
Chapter Summary Provides guidance on load values and loading methodology applicable to tension membrane structures –external loading has bigger impact.
Literacy Design Collaborative (LDC) – A Teacher Tool for Implementing the CCSS AGENDA October 4 th and 5 th 2012 Outcomes: Self- reflections on how the.
Regional Sediment Management Policy and Implementation Workshop April, 2009.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
Technical Report Writing Dr. Shelley Thomas. Overview Selecting effective report topics Using worksheets to plan projects Developing and proposing project.
Wake County Comprehensive Parks & Recreation Master Plan.
US Army Corps of Engineers BUILDING STRONG ® FIMS Annual Comprehensive Training Bridge File Content and Management May 2016.
Investigation of the Effects of End Region Deterioration in Precast, Prestressed Concrete Bridge Girders Royce Floyd, Cameron Murray, Darion Mayhorn DONALD.
PennDOT’s Use of Nondestructive Testing Solutions
Repair of Steel Beam/Girder Ends with Ultra High Strength Concrete
Hua Liu, Zeqian Li (Student) Lin Yin (Visiting Faculty Advisor)
Blatnik Bridge Management Study
ABCD What’s New In Bridges
Virtis Opis User Group Meeting, August 6, 2013
Safety by Design & Engineering – Florida Footbridge
Historical Life Cycle Costs of Steel & Concrete Girder Bridges

Infrastructure Team Leader California Division Office
Presentation transcript:

PennDOT Research Program Got Research? Repair Methods for Prestressed Girder Bridges

PennDOT Research Program Repair Methods for Prestressed Girder Bridges Research Organization: University of Pittsburgh PI: Kent A. Harries, Ph.D., FACI, P.E. Technical Advisor: Lou Ruzzi, P.E., District Bridge Engineer Cost: $ 91,628.00

PennDOT Research Program Repair Methods for Prestressed Girder Bridges What’s the Problem:  Prestressed concrete bridges are exhibiting signs of deterioration and distress  Although there are many research/case studies addressing repair of prestressed girder bridges, there is little comprehensive guidance available to bridge engineers

PennDOT Research Program Repair Methods for Prestressed Girder Bridges

PennDOT Research Program Repair Methods for Prestressed Girder Bridges How Will the Research Help Solve the Problem:  The key deliverable of the research project was to conduct a state of the art review of both assessment and repair techniques suitable for damaged prestressed concrete bridge systems

PennDOT Research Program Repair Methods for Prestressed Girder Bridges

PennDOT Research Program Repair Methods for Prestressed Girder Bridges Implementation & Next Steps:  After review by the Technical Advisor, FHWA and the PennDOT Bridge Quality Assurance Division, PennDOT has formed an internal team to develop a Best Practices Guide focused on structural and load bearing repair techniques