Preparing For Regionals. 1: Make sure that all mentors and students have safety glasses with them.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Preparing For Regionals. 1: Make sure that all mentors and students have safety glasses with them.
Alpha Control System TheRobettes.com.
Battery Buggy Rules – Div B Chris Ganley Materials Adapted from Presentation prepared by Mike Johnson 1.
AC-SSC-1 Installation and operation manual
Presented by Team 3350 (T-BOTS).  Students should lead their teams in the building, design, and all other aspects of the robot.  Knowledge of the Kit.
 Slides by Raul Olivera from FRC 111 – WildStang › Presentation from the FIRST Championships in 2008 › ON_Pneumatic_Power_Olivera.ppt.
Introduction To Frc electronics
HYDRAULICS & PNEUMATICS
Pneumatic Components & Systems Team 1640 Clem McKown – mentor November 2008.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
FIRST Pneumatics Team 1425 Wilsonville Robotics. Agenda Components Components Basic System Design Basic System Design Applications Applications Tricks.
BATTERY BUGGY Mike Johnson. LAY PERSON’S EVENT DESCRIPTION: Teams will construct a battery-powered vehicle that: moves as fast as humanly possible, and…
Robot Construction For Competition Sustainability Tommy Earley Palmetto Regional FIRST Kickoff Event January 5, 2013.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Wiring the new control system MVRT 2010 – 2011 Season.
The Robot Mech Team by: Nick Thomsen, Faraz Khan, Mark Wei and Vish Gopalakrishnan.
FIRST Robotics Kit of Parts - KOP
Bread Boarding and Operating The IFI Robotic Control System.
Welcome to Electrical Design and Wiring for F.I.R.S.T Championship 2006 Welcome to Electrical Design and Wiring for F.I.R.S.T Championship 2006.
Presented by Jon Pannell
Part 1: Introduction FRC Introduction  FRC 2907 since 2008  Each area of the robot has a team assigned  The Electronics team is headed this year.
Overview of New System Beta Team from Wilsonville 1425 Wilsonville Robotics – Code Xero 2550 Oregon City Robotics.
Vex 1.0 © 2006 Carnegie Mellon Robotics Academy Inc. Test Bed Assembly.
Controlling Hazardous Energy
2015 FRC Control System = MOL = DUK Power Distribution Board Volts -12 Volts (4) 40 amp Circuits (4) (6) 20/30 amp Circuits (6)
Electrical Workshop Session One 9/22/2014. FIRST Power Distribution Diagram.
Team 358 Hauppauge High School Electrical Workshop October FIRST® For Inspiration and Recognition of Science and Technology.
2013 MN Splash. 10 Quick and Easy Ways to Fail Inspection (… and how to avoid them) Presented by: Mark Moulton Lead Robot Inspectors – Lake Superior,
1. A guide to wiring your robot. Jerry Skene Past mentor – Chantilly Robotics
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Electrical Components.  This supplies all the power to the robot. It is a single 12 V battery. They are sealed to prevent battery acid from leaking.
Test Tools Motor and Pneumatic Subsystems Aimi Abe-Lafond Sarah Kirke Natalia Sydorenko.
RM2C Understanding Connections on the Robot Control Board (RCB).
Electro-Pneumatics Module 1
Basic Information Description: Prior to the competition teams must design, build, document and test one robotic device to move scoreable items. How many.
Lockout/Tagout for Affected Employees Understand the Basics.
Lighting and Wiring Services
Mentors Workshop Control System Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Electrical Rules and Components
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1923 Virtual Robot Part 4 By Nihar Sidhu.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
CONTROL OF HAZARDOUS ENERGY. Types of Energy To Be Controlled  Kinetic – Energy of motion  Potential – Energy of position  Electrical – From generated.
Cass Lake Bena Robotics.  Drivetrains  Electrical System  Operator Interface.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Understanding The 2008 FRC Robot Controller Chris Gregory FRC1089 – Team Mercury
Warlocks 8/5/05 TMU Pneumatics on Robots u Simplified model Compressed Air Tank Geek Safety Glasses 60 lbs Pneumatic Cylinder Whoa! That’s a lot of force.
Electrical subsystem Manual vs Automation.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
TEAM 5950 CODE NAME “LITTLE BOY”. DRIVE BASE- ANDYMARK AM-14U3 Multiple configurations- we chose the 32” X 36” slim design Price $599 included in KOP.
Electrical Layout and Construction Techniques for FRC
Cass Lake Bena Robotics Team 3134 & Team  Drivetrains  Electrical System  Operator Interface.
Mechanical Components and Programming Ken Youssefi Introduction to Engineering – E10 1.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
FRC Pneumatics Nate Laverdure FRC Team 122. What is this presentation? Goals: Teach you the words transducer, damper, and venturi Attempt to: – Show that.
FIRST ROBOTICS COMPETETION Introduction to Electrical & Control System Power and Signal Distribution/Interconnection Sensors, Motors, Speed Controllers,
The FRC Control System Brought to you by the electrical subteam of FRC Team 2177, the Robettes.
FRC Robot Electronics.
Team 5950 Code name “Ozotron 300”.
ROBOT ARM 2017 Rules Rachel Mason.
Trainings 10/28 Woooooo!!.
Control of Hazardous Energy
Participant Name FRC Team #
GENERAL VEHICLE RULES 2018/2019.
LOCKOUT/TAGOUT By: Kory Hildebrand.
Level 2 Electrical and Electronic 3
Fluid Power System Electrical Control
Presentation transcript:

Preparing For Regionals

1: Make sure that all mentors and students have safety glasses with them.

Preparing For Regionals 1: Make sure that all mentors and students have safety glasses with them. 2: Drop off robot and tools Wednesday if at all possible. Attach Bag & Tag form to robot bag.

Preparing For Regionals 1: Make sure that all mentors and students have safety glasses with them. 2: Drop off robot and tools Wednesday if at all possible. 3: Keep the number of student in the pits to the minimum on Thursday morning.

Preparing For Regionals 1: Make sure that all mentors and students have safety glasses with them. 2: Drop off robot and tools Wednesday if at all possible. 3: Keep the number of student in the pits to the minimum on Thursday morning. 4: Run inspection list on your own robot before getting an inspector.

Preparing For Regionals 5: If your team is not finished with your robot, get help from other teams or Inspectors. “Geek Squad” will be available at our events.

Preparing For Regionals 5: If your team is not finished with your robot, get help from other teams or Inspectors. “Geek Squad” will be available at our events. 6: Get inspected as early as possible.

Preparing For Regionals 5: If your team is not finished with your robot, get help from other teams or Inspectors. “Geek Squad” will be available at our events. 6: Get inspected as early as possible. 7: Do not plan on leaving the event until the pits close. Some teams have been leaving without their robot completed and inspected.

Preparing For Regionals 5: If your team is not finished with your robot, get help from other teams or Inspectors. “Geek Squad” will be available at our events. 6: Get inspected as early as possible. 7: Do not plan on leaving the event until the pits close. Some teams have been leaving without their robot completed and inspected. 8: Have all paperwork ready and sign in early.

Preparing For Regionals 5: If your team is not finished with your robot, get help from other teams or Inspectors. “Geek Squad” will be available at our events. 6: Get inspected as early as possible. 7: Do not plan on leaving the event until the pits close. Some teams have been leaving without their robot completed and inspected. 8: Have all paperwork ready and sign in early. 9: Get DAP-1522 programmed early.

Questions

Inspections

Inspectors Check List Initial Inspection ____ Weight - ROBOT Weight ( ___________ pounds BUMPER Weight (Bumpers must be ___________ pounds ____ Total Finals Weight = _________pounds ____ Size – Total FRAME PERIMETER length may not exceed 112”, nor exceed a 54” diameter, vertical cylinder. ____ Standard BUMPERS - must follow all specifications  BUMPERS must provide protection of all outside corners.  All segments as defined by backing may not extend >1” beyond robot frame.  No BUMPER segment may be unsupported by ROBOT frame for a length greater than 8”.  BUMPERS may have gaps between frame and BUMPER up to ”.  All corners must be protected by BUMPERS >=8” on both sides and include pool noodles within corners.  Must use ” thick x 5” tall plywood or solid, robust wood, backing and a pair of vertically-stacked 2.5” pool noodles with no extraneous holes that may affect structural integrity. (clearance pockets and/or access holes are acceptable). Pool noodles may be any shape cross section, solid or hollow.  Must use a durable fabric cover for the noodles secured as in Fig 4-4 cross section.  Must be able to display red or blue (color similar to FIRST Logo) BUMPERS to match ALLIANCE color.  Team number displayed with 4” tall x ” stroke, on the BUMPERS, in white or outlined in white and be easily determined when walking around the perimeter of the ROBOT.  Must be securely mounted when attached and be easily removable for Inspection.  When on flat floor, BUMPERS must reside entirely in region between 2” and 10” above floor.

Mechanical ____ No Sharp Edges, or Protrusions that pose a hazard for participants, robots, arena, or field. ____ No Prohibited Materials – e.g. sound, lasers, noxious or toxic gases or inhalable particles or chemicals ____ No Unsafe Energy Storage Devices - carefully consider safety of any springs or pneumatic systems ____ No Risk of Damage to Other Robots - e.g. spearing, entangling, upending or adhering ____ No Risk of Damage to Field – e.g. metal cleats on traction devices or sharp points on frame. ____ Decorations - Cannot interfere with other ROBOTS’ electronics and sensors (particularly via color distraction) and be in spirit of “Gracious Professionalism”. ____ BoM Cost – Cost must not exceed $4000 of additional components with no single component > $400. ____ FRAME PERIMETER – Frame must be non-articulated. ____ Playing Configuration – Robot may not extend beyond a 54” diameter vertical cylinder, 84” high. ____ End Game – DISCS and ROBOT can be removed from FIELD without power ____ Belay Points – ROBOT has 2 accessible, rigid belay attachment points near ROBOT center of gravity

Electrical ____ Components – None may be modified, except for motor mounting, output shaft can be modified, motor wires may be trimmed, window motor locking pins may be removed, and certain devices may be repaired with parts identical in specification and performance to the originals. ____ Battery - A single MK ES17-12 battery or a single EnerSys NP18-12 must be securely fastened to robot. ____ Visibility – PD and breakers must be easily visible. ____ Main Breaker Accessibility – the single 120A main breaker must be readily accessible with labeling preferred. ____ Allowable PD Breakers - Only Snap-Action breakers up to 40 Amps may be installed in the PD ____ Robot Radio – the DAP-1522 Rev B wireless adapter must be powered via the KOP +5 volt power convertor connected to the dedicated +12 volt connector on the PD. Radio must be mounted so that its LEDs are visible. ____ Wire Size - obey the wiring size conventions. o All wire from battery to PD have min #6 AWG (4.11mm) wire o 40 amp breakers have min #12 AWG (2.052mm) wire o 30 amp breakers have min #14 AWG 1.628mm) wire o 20 amp breakers have min #18 AWG (1.024mm) wire ____ Wire Colors - must be color coded - red/white/brown/black w/stripe for +24, +12, +5 VDC supply wires and black/blue for supply return wires ____ 1 Wire per WAGO - only 1 wire may be inserted in each WAGO, splices and/or terminal blocks, may be used to distribute power to multiple Breakouts and Sidecars but all wires in the splice are subjected to the Wire Size rules ____ Servos – Must be a maximum power rating of 4 watts, wired to Digital Sidecar PWM outputs only. <R32

Electrical ____ Motors – Limited to motors in Table 4-1. ____ Actuators – Electrical solenoid actuators, no greater than 1 in. stroke and no greater than 10 watts continuous duty, ____ Motor/Actuator Power – As listed in Table 4-4. ____ Motor/Actuator Control – Motors/actuators must be controlled by Spike, Talon, Victor or Jaguar and driven directly by PWM signals from a Digital Sidecar or by CAN bus. ____ Custom Circuits, Sensors and Additional Electronics - may not connect to the cRIO’s serial or Ethernet 2 ports (except in compliance with R69), cannot directly control speed controllers, relays, actuators or servos. ____ Solenoid Breakout –Outputs from each Solenoid Breakout shall not cumulatively exceed 16W for the cRIO-FRC (8-slot) and 21W for the cRIO-FRC II (4-slot) ____ Spike Fuse – Spike must have 20 amp fuse installed. When used with compressor, fuse may be (recommended) replaced with 20 amp, snap action, breaker. ____ Isolated Frame – Must be electrically isolated from battery, cRIO and Axis 206 camera must be insulated from frame. (>10k Ohm between either PD battery post and chassis)

Pneumatic System W/ On Board or Off Board Compressors(n/a for robots that do not use pneumatics) ____ No Modifications - pneumatic parts may not be modified except actuator mounting pins may be removed. ____ Compressor - Only one KOP compressor (or equivalent, max 1.05 CFM flow rate) may be used (on or off robot). ____ Compressor Power - must use a Spike (recommend replacing Spike’s 20A fuse with a 20A breaker) ____ Compressor Control – A Pressure Switch must be wired directly to a Digital Sidecar to control compressor. ____ Compressor Relief Valve – set to 125 psi, attached to (or through legal fittings) to compressor outlet port. ____ Vent Plug Valve – must include an easily-accessible manual vent plug valve to release all system pressure. ____ Off-Robot Compressor (if used) – must include an additional vent valve. The on-robot control system must be used to control and power the compressor. Pressure switch, high pressure gauge and regulator can be located off-board. ____ Components – All must be COTS or KOP items, rated for 125 psi working pressure. ____ Tubing – Equiv. to KOP with a maximum ID of 0.160” with screen printed rating or supporting documentation. ____ Pressure Regulator – Set to ____ Gauges - must be present at both the high pressure side and low pressure regulator(s) outlet and be readily visible. ____ Pressure Rating - all pneumatic components must be rated for at least 125 psi working pressure except solenoid valves. If valves are rated for less than 125 psi, another relief valve must be installed on working pressure side to vent at the lower pressure. ____ Valve Control - pneumatic solenoid valves must have a max Cv of 0.32 and max 1/8” NPT ID, be controlled by either Spike or NI 9472 and only one valve per pneumatic actuator.

Power On Check (Driver Station must be tethered to the Robot) ____ Unauthorized Wireless Communication – no wireless communication to/from ROBOT or OPERATOR CONSOLE without prior FIRST written permission. No radios allowed on the OPERATOR CONSOLE or in the pit ____ Confirm Pneumatics Operation – With no pressure in system, compressor should start when robot is enabled. o Compressor should stop automatically at ~120 psi under cRIO control. o Main Pressure and Working Pressure ____ Robot Signal Light - The Robot Signal Light from the KOP must be visible from 3’ in front of the robot, and be plugged into the RSL port on Digital Sidecar connected to Slot 2. Confirm that the RSL flashes in sync with DSC. ____ Battery Voltage Monitoring – the DS must display a battery voltage as monitored by analog module in slot 1. ____ Verify Team Number Configuration – team has configured DS, cRIO, & DAP-1522 at kiosk for this event. ____ Firmware Versions - The cRIO image and DS firmware must be up-to-date. ____ Power Off – remove power from the robot, confirm all LEDs are off, actuate pneumatic vent plug valve and confirm that all pressure is vented and all gauges read 0 psi pressure. ____ OPERATOR CONSOLE – is less than 60 in x 12 in.

Bill Of Materials (BOM)

Questions

Checklists Tools – make list of all the tools you need to work on the robot.

Checklists Tools – make list of all the tools you need to work on the robot. Spare material – Spare parts and spare material to fix the robot. Extras are good if you have them because you may be able to help other teams.

Checklists Tools – make list of all the tools you need to work on the robot. Spare material – Spare parts and spare material to fix the robot. Extras are good if you have them because you may be able to help other teams. Pre match checklist – One of the most important lists that you can make. Checking all parts of the robot before EVERY match.

General Notes Inspectors are not there to prevent you from competing.

General Notes Inspectors are not there to prevent you from competing. Spare parts is not there to help you restock your inventory.

General Notes Inspectors are not there to prevent you from competing. Spare parts is not there to help you restock your inventory. There is enough announcements already. Do not make up fake requests.

General Notes Inspectors are not there to prevent you from competing. Spare parts is not there to help you restock your inventory. There is enough announcements already. Do not make up fake requests. Start packing up and get ready to leave 15 minutes before pits close.

General Notes Inspectors are not there to prevent you from competing. Spare parts is not there to help you restock your inventory. There is enough announcements already. Do not make up fake requests. Start packing up and get ready to leave 15 minutes before pits close. Respect the volunteers.

Questions

Links Inspection Checklist – adedFiles/Robotics_Programs/FRC/Game_and _Season__Info/2013/2013FRCInspectionChec klist.pdf adedFiles/Robotics_Programs/FRC/Game_and _Season__Info/2013/2013FRCInspectionChec klist.pdf

Links Inspection Checklist – edFiles/Robotics_Programs/FRC/Game_and_Seas on__Info/2013/2013FRCInspectionChecklist.pdf edFiles/Robotics_Programs/FRC/Game_and_Seas on__Info/2013/2013FRCInspectionChecklist.pdf BOM - edFiles/Robotics_Programs/FRC/Game_and_Seas on__Info/2013/2013_Inspection_BOM_Template.xlsx edFiles/Robotics_Programs/FRC/Game_and_Seas on__Info/2013/2013_Inspection_BOM_Template.xlsx

Links Non Compliance Form - manual.usfirst.org/upload/pdfs/2012/12/Rob ot_Lockup_Noncompliance_form_v3.0.pdfhttp://frc- manual.usfirst.org/upload/pdfs/2012/12/Rob ot_Lockup_Noncompliance_form_v3.0.pdf At the Event Guidelines – manual.usfirst.org/viewItem/7http://frc- manual.usfirst.org/viewItem/7

Questions