ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR
AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR (ASECNA) France GABON MADAGASCAR MALI MAURITANIA NIGER SENEGAL TOGO BENIN BURKINA-FASO CAMEROON CENTRAL AFR REP CHAD CONGO BRAZZA COTE D ’IVOIRE EQUAT. GUINEA
ORGANIZATION
16 millions sq.km ASECNA 6 FIRs /5 FIC NIAMEY NDJAMENA DAKAR BRAZZAVILLE FIR DAKAR OCEANIC Agence pour la Sécurité de la Navigation Aérienne en Afrique et à Madagascar Siège Social : 32-38 Av. Jean Jaurès DAKAR B.P. 3144 Tél. :23.10.40 - Fax :23.46.54 Bénin-Burkina-Cameroun-Centrafrique-Congo-Côted’Ivoire-France-Gabon-Guinée Equatoriale-Madagascar-Mali-Mauritanie-Niger-Sénégal-Tchad-Togo FIR ANTANANARIVO
SERVICES ATS COMMUNICATIONS (FIXE/MOBILE) FLIGHT INSPECTION FIRE FIGHTING ENGINEERING
RESSOURCES AERONAUTICAL FEES (LANDING & EN ROUTE) MEMBER STATES CONTRIBUTIONS ON THEIR NAT ’L ACTIVITIES ENTRUST TO ASECNA LOANS
COMMUNICATIONS VHF NETWORK EXTENSION FOR MORE CONTROLLED AIRSPACE SATCOM FOR AIR TRAFFIC CONTROL AERONAUTICAL TELECOM NETWORK (ATN) HF / DL - SATELLITE BACK UP
NAVIGATION GROUND BASED EQUIPMENTS IN CONTRIBUTION TO LOCAL OR WIDE AREA AUGMENTATION SYSTEMS
SURVEILLANCE SSR /NDJAMENA/BRAZZAVILLE AUTOMATIQUE DEPENDANTE SURVEILLANCE (SITA / AIR AFRIQUE / COLLINS/ANAM) AIR SITUATION DISPLAY FOR NON ADS FLIGHT ADS/SSR ADS-B SURFACE MVT GUIDANCE
ATM 1/2 AUTOMATIC FLIGHT DATA PROCESSING CONFLICT DETECTION AND CLEAR FLEXIBLE AIR ROUTES (CONTINENTAL/OCEANIC ATL-INDIAN) DARPs CPDLC D-FIS
ATM 2/2 REDUCED UPPER AIRSPACE AREA TRAFFIC FLOW MANAGEMENT HARMONIZATION OF TERMINAL AREA (TMAs) LIMITS SUB REGIONAL ATM SYSTEMS INTEGRATION
AVIONICS AFI / LOW DENSITY TRAFFIC FULL AUTONOMOUS AVIONICS ON BOARD OVERSEAS INT’L AIRLINES LACK OF EQUIPMENT ON MAJOR DOMESTIC OR REGIONAL OPERATORS B-RNAV FAIR COST CNS/ATM SYSTEMS (DL/ADS/GNSS) VDL MODE MODULAR BASIS
ASECNA’S CNS/ATM IMPLEMENTATION COST ACQUISITION/INSTALLATION/OPERATION (2000/2010) COMMUNICATION 50 millions US$ NAVIGATION 33 “ SURVEILLANCE 42 “ ATM 68 “ TRAINING 16 “ INFRASTRUCTURE 66 “ TOTAL 276 “
COST/BENEFITS ANALYSIS
FINANCING ASECNA’S CASE STUDY DEVELOPMENTS/DEMONSTRATIONS & TRIALS STOCK FUNDS OPERATIONS INFRASTRUCTURE TRADITIONAL EUROPEAN & AFRICAN FINANCIAL INSTITUTIONS
EXISTING INFRASTRUCTURE AFTN MODERNIZATION INTERCONNECTION OF COMMUNICATIONS NETWORK VHF COVERAGE /DATA LINK X 25 PROTOCOL SADIS IMPLEMENTATION
EXISTING INFRASTRUCTURE LADGPS TRIALS IN DAKAR GPS /PRIMARY/SUP. MEAN WGS 84 GNSS IMPLEMENTATION IN AFI STUDY FOR EGNOS TEST BED EGNOS/WAAS INTER OPERABILITY TESTS
EXISTING INFRASTRUCTURE ADS IN AFI WITH RKA / COLLINS /SITA ENHANCEMENT TO FANS- /1/A
EXISTING INFRASTRUCTURE ATM INTEGRATION AND HARMONIZATION / 40 YEARS
TRAINING 15 SEMINARS OF SENSIBILIZATION TRAINAIR PROGRAMM