OSC 435 Chapter’s 29-33 March 10, 2005 Robert Wharton Alina Zvonova.

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

How to Talk to Accounting about Lean* Dave Turbide, CFPIM, CMfgE, CIRM, CSCP * Version 3.
1 Capacity Management Capacity has a cost, whether it is used or not.
Flow Rate and Capacity Analysis
The Goal Chapters The Goal Characters Alex Rogo—Plant Manager Julie – His wife Bill Peach—Division Vice-President Bucky Burnside—President of.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Part II: TOC Concepts
DIALING FOR DOLLARS INTRODUCTION The situation in this particular ethical dilemma is that the sales person is drastically under the quota, although in.
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
8/27/04 Cut the Lot Size What can we do if the bottleneck has moved outside the plant?
Cost Control Measures for Food Service Operations
Activity-based Cost Management
Operations Scheduling. Scheduling in a Process-Focused Environment.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Profit and Loss Account Test This test consists of 10 questions designed to test your understanding of Profit and Loss Accounts as well as analysis of.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Traditional Cost Management Traditional Cost Management C H A P T E R 6.
Week 10 DIFD 321 Accounting & Finance. WHAT IS MARKETING? The action or business of promoting and selling products or services, including market research.
Ricardo Ernst Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 6: Theory of Constraints.
Part 6 Financing the Enterprise © 2015 McGraw-Hill Education.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
0 CHAPTER 3 Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows © 2009 Cengage Learning.
A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox
The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
To Our Presentation on Inventories.  What is FIFO  Why a company take FIFO method for their industry.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
Marketing Strategies Project #2: Marketing Plan Analysis.
Performance Measurement Financial
Budgetary Planning and Control
Activity Scheduling and Control
The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox.
The process of measuring progress toward planned performance and, if necessary, applying corrective measures to ensure that performance is on the line.
“The Goal” and Agile An attempt at mapping concepts from “The Goal” by Eliyahu Goldratt (Theory of Constraints) to the Agile Software Development Process.
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
CECE FICCI Quality Costs & Profit Chapter no.2 CECE FICCI Many people think that quality costs money and adversely effects profits. But these costs are.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
AXUG Partner Showcase – Introducing Preactor
Job-Order Costing: Cost Flows and External Reporting
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Strategic Capacity Management
MODULE 3 Manufacturing Methodologies
Principles of Business, Marketing, and Finance
Synchronous Manufacturing and Theory of Constraints
Analytical Tools for Process Analysis and Improvement
Synchronous Manufacturing
Constraint Management
Decision Making with Relevant Costs and a Strategic Emphasis
Variable Costing: A Tool for Management
Chapter 7 Capacity Planning and Management
Manufacturing Planning and Control
Fundamentals of Cost Management
Planning for Profit and Cost Control
The Goal.
Sample Key Points from The Goal
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Variable Costing: A Tool for Management
Theory of Constraints Part II: TOC Concepts
Theory of Constraint.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

OSC 435 Chapter’s March 10, 2005 Robert Wharton Alina Zvonova

Positive Changes at the Plant New contracts are emerging due to shorter lead times. Efficiencies have gone up because of the increase in throughput The reduced batch sizes have helped to keep the workers busy and control inventory. Product can now be moved to the next station much faster.

Positive Changes at the Plant Inventories are at their lowest level ever and are not filling up because the only WIP inventory on the floor is for current demand. Less idle time on the bottlenecks. More setups means the same costs for direct labor, but less inventory and less wasted idle time.

Cost Measurement Problems The current system doesn’t show the true picture. It appears that the cost per part has increased.

Cost Measurement Problems Example: 100 Unit Batch Setup Time: 120 min Process time per part: 5 min So, the direct labor is 5+(120/100)=6.2 Example: 50 Unit Batch Setup Time: 120 min Process time per part: 5 min So, the direct labor is 5+(120/50)=7.4

Cost Measurement Problems It looks like more setups increase the cost but no new people were added, so no additional cost was incurred. Cost has actually gone down with the reduced holding costs of inventory and the increased amount of product made and sold for the same cost.

Just Change the System Al and Lou decide that they will make the numbers show a more accurate reflection of what’s going on. They use the cost factor for the last two months instead of 12.

Opportunity Knocks Burnside’s order comes down, and the crew investigates the possibilities. They agree to ship 250 units a week for four weeks. This actually works better for Burnside’s order.

Performance Review Al feels confident because The increase in throughput has allowed him to promise shorter lead times. Inventory levels are down Operating expenses are down. The plant is making money. With the new cost system profit has hit 17%.

Surprise Tour Smyth tours the plant to get a tape with the robots and sees the idle machines, causing an audit. The numbers are recalculated and the result shows a profit of only 12.8%.

Burnside comes to Town Due to the quick and precise completion of the order for 1000 units in 4 weeks, Mr. Burnside comes to the plant and shakes each individual’s hand. This has won the company a huge contract with Burnside and made a lot of money for the company.

Fundamental Assumptions During his performance review Alex addresses fundamental assumptions that are wrong. In fact, the rule is balance the flow, not the capacity.A traditional view is that capacity should be balanced with demand first and then flow maintained. In fact, the rule is balance the flow, not the capacity.

False Assumptions That’s false because of dependency. For any resource that’s a bottleneck, the level of activity from which the system may profit is determined by some other constraint within the system The assumption is that the level of utilization of any worker is determined by his own potential. That’s false because of dependency. For any resource that’s a bottleneck, the level of activity from which the system may profit is determined by some other constraint within the system.

False Assumptions Activating resources and utilizing them are not synonymous.It’s assumed that utilization and activation are the same. Activating resources and utilizing them are not synonymous. No, an hour lost on the bottleneck is an hour for the entire system.An hour lost at the bottleneck is just an hour lost at that resource. No, an hour lost on the bottleneck is an hour for the entire system.

False Assumptions Actually, an hour saved at a non- bottleneck is useless.An hour saved at a non-bottleneck resource is good. Actually, an hour saved at a non- bottleneck is useless. The truth is that bottlenecks govern both throughput and inventory.Bottlenecks have little impact on inventory. The truth is that bottlenecks govern both throughput and inventory.

False Assumptions Performance should be evaluated by the bottom line. Basically, whether or not the plant is making money.Evaluating performance of operations by cost-of-product (with the half-batch system it looks like the cost-of-product measurement increased.) Performance should be evaluated by the bottom line. Basically, whether or not the plant is making money.

Performance Review Hilton refuses to change his view, so Alex goes straight to Peach. Alex gets the promotion. Alex goes to Jonah and is told that he must find the answers for himself.

Common Sense Al tries to give the credit of his accomplishments to those who helped him The couple discusses common sense and how sometimes common practice serves as a mask. Jonah worked as an external trigger to remove this mask by asking the right questions.

Lou’s Plans Lou wants to develop a cost measurement system that will correct the current one. Even though inventory is thought of as a liability, on the balance sheet it’s reported as an asset. So plant is being penalized for reducing those inventories.

Lou’s Discovery Lou discovers that they have actually been making a higher profit than they thought. The true improvement is actually well over 20% not 17%.

Bob’s Dream Bob wants to stay in the plant and develop it further. He wants to redesign procedures and promote initiative taking in re-engineering orders to increase sales. He thinks that with a new system they’ll be able to give marketing rigid lead times for each product. Lead times would be calculated based on the load of the bottlenecks.

Stacey’s Dream Stacey wants to become the plant’s new production manager to concentrate on improvements to squeeze more throughput from the current resources. She believes that improvement should not be solely concentrated on bottlenecks, but on CCRs as well. If not, the plant will run into an inter-active bottleneck situation and chaos would be inevitable.

Ralph’s Dream Ralph wants to develop a system that will have accurate, timely, and meaningful data. This new useful data will help to: –Drastically shrink time and effort needed to engineer a sale. –Manage the buffers and local improvements –Measure, in a much more beneficial way, performance of the plant and local improvements.