Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.

Slides:



Advertisements
Similar presentations
FNAL Superconducting RF Program Sergei Nagaitsev.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
SRF Industrialization American Region Laboratory Plans Bob Kephart IPAC10/GDE industrialization Kyoto, May, 2010.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
9-cell cavity coordination CM Ginsburg 8 Mar
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Cornell Updates Commissioning of T-map for ILC single cell starts.
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
Cavity Gradient R&D Status and Future Plans for TDP-2
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
New Cavity Techniques and Future Prospects
for the FNAL/ANL, JLab, and Cornell cavity teams
ELLIPTICAL SCRF CAVITIES
Effort Torwards Improving Large Scale Production for SC Cavities
SRF Industrialization American Region Laboratory Plans
Production Cavities in progress
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Highlights from EU Global Design Effort
Industrialization Activities in the Americas
Presentation transcript:

Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2 nd Annual Meeting Rutherford Appleton Laboratory, UK 3-5.April 2013

Fermilab Overview  SRF activity at FNAL/ANL is in support of Project X, ILC, or other future SRF projects  Explicitly includes industrial development, and associated R&D for improved performance and reliability, and reduced cost  Infrastructure availability and personnel development permit the development of industrial partners for SRF cavities and cryomodules  FNAL philosophy: the laboratory does not duplicate activity or compete with industrial capability  Industry can provide most materials and services more quickly at lower cost  Exceptions involve substantial infrastructure, e.g., cryogenic systems  Most of the industrialization focus has been for the ILC, so this talk will be weighted toward ILC (electron) technology  Most conclusions are broadly applicable to other SRF projects ...Proton accelerators in particular 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop2 ANL/FNAL cavity processing & assembly facility  Located at ANL; designed and built jointly  ANL group Electropolishing (EP) of 1-cell and 9-cell ILC-style cavities  FNAL group high-pressure water rinse (HPR) tool  Cavity moves vertically, wand rotates  Cleanroom class 10, 100, 1000  Ultrasonic (US) rinse tank in anteroom  Cavity vacuum system

Fermilab Outline  Cavity vendor development  Cavity processing vendor development  Cavity and cryomodule value engineering  Cryomodule assembly  Not yet industrialized in the US; XFEL example will be instructive  Existing industrialization workshops (ILC) 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop3 ANL/FNAL cavity processing & assembly facility  Located at ANL; designed and built jointly  ANL group Electropolishing (EP) of 1-cell and 9-cell ILC-style cavities  FNAL group high-pressure water rinse (HPR) tool  Cavity moves vertically, wand rotates  Cleanroom class 10, 100, 1000  Ultrasonic (US) rinse tank in anteroom  Cavity vacuum system

Fermilab Bare cavity sequence Each inspection, processing and test step is recorded in an electronic traveler 4Ginsburg - NGLS Review Feb 5-8, Apr Ginsburg (FNAL) 2nd PASI Workshop For large projects like XFEL, it may make sense to dress cavities before vertical test

Fermilab Cavity dressing sequence 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop5

Fermilab CM assembly sequence (part 1) 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop6 Receive dressed cavities at CAF- MP9 Receive peripheral parts Assemble dressed Cavities to form a String in the Cavity String Assembly Area (Clean Room) Install String Assembly to Cold Mass in the Cold Mass Assembly Area Transport the Cold Mass to CAF-ICB

Fermilab CM assembly sequence (part 2) 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop7 Install the String assembly with the cold mass into the Vacuum vessel in the Vacuum Vessel Assembly area Install the Cold Mass back to the Cold Mass Assembly Fixture in Cold Mass Assembly Area Align Cavity String to the Cold Mass Support Ship Completed Cryomodule to ILCTA- NML for testing

Fermilab ILC cavity: international effort ILC cavity fabricators –Research Instruments (Germany) –Zanon (Italy) –Advanced Energy Systems (US) –Niowave and Roark (US) –PAVAC (Canada/US) –Mitsubishi Heavy Industries (Japan) –Toshiba (Japan) –Hitachi (Japan) ILC cavity processing facilities –DESY –Jefferson Lab –KEK –Fermilab/Argonne joint facility –(Industrial processing facilities: RI, AES, Zanon) Results from past 3 years have been collected in worldwide database, as a means to further track progress and provide input to ILC machine design 8Ginsburg - NGLS Review Feb 5-8, Apr Ginsburg (FNAL) 2nd PASI Workshop

Cavity from vendors who have manufactured a cavity that has surpassed 35MV/m in vertical test: –ACCEL or ZANON or (AES SN>=5) or (MHI SN>=12) Fine-grain cavity Use the first successful (= no system problem) test Standard EP processing: no BCP, no experimental processes (Ignore test limitation) Second pass –if (Eacc(1 st successful test)<35 MV/m) then if (2 nd successful test exists) then –plot 2 nd test gradient else –plot nothing [assume 2 nd test didn’t happen yet] endif –else plot 1 st successful test gradient –endif “Up-to-second-pass” ILC Production Yield Plot - Method 5.Apr Ginsburg (FNAL) 2nd PASI Workshop

Fermilab ILC Cavity Performance Benchmark Ginsburg (FNAL) 2nd PASI Workshop International cavities from established vendors using established processes 2 nd pass yield for >35 MV/m for integrated sample is ( )% for alone is ( )% C.M. GInsburg et al., KILC12, Daegu, S. Korea 1 st pass 2 nd pass 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop10

Fermilab Gradient Summary Good progress worldwide in cavity production, processing, and test AES has been qualified as an ILC cavity vendor during this activity Progress is a partnership between industry and laboratories, results are dependent on both performing well –Scars, pits, stains, dirt and residue introduced at different steps –Early defects are not typically overcome by the standard processing steps The typical learning curve at each company requires a ‘few’ cavities –constant vigilance required afterwards to stay there Yield statistics to the ILC specification show improvement with time –Utility of XFEL test data for ILC will be limited by XFEL requirements, but huge data set Efforts to exceed ILC gradient spec will continue –Field emission prevention at all gradients remains important Laboratory processing and test facilities are coming up to speed, recent throughput at Fermilab for instance is very good 5.Apr Ginsburg (FNAL) 2nd PASI Workshop

Fermilab  Canadian company with new facility in Batavia  1-cells: 6 fine-grain cavities fabricated –Half use “smart-”bells TE1PAV001-3 First weld together half-cells, then add beamtubes –Half use dumb-bells – TE1PAV First weld each half-cell to a beamtube, then weld together “smart bell” cavities exhibited multipacting ~18-22 MV/m possibly due to unusual shape  9-cells: 10 fine-grain cavities were ordered; order later changed to 650 MHz New Vendor Development: PAVAC TE1PAV001 12Ginsburg (FNAL) 2nd PASI Workshop5.Apr. 2013

Fermilab  Six 1-cells tested extensively from 2008 some had add’l prep/tests –Useful information learned, e.g., defect on die –Primarily being used for commissioning and materials studies now  Six 9-cells received  QC shows fabrication is not yet as stable as other vendors  Performance is moderate  Tumbling R&D New Vendor Development: Niowave-Roark 13Ginsburg (FNAL) 2nd PASI Workshop5.Apr. 2013

Fermilab NR flash BCP’d the six 9-cells – insufficient data to comment AES flash BCP’d the latest batch of six 9-cell cavities – all show some pitting but performance is typically good –Does BCP cause the pitting? Process not well controlled, e.g., acid flow too fast Pitting worse on lower surface than upper –Does material cause the pitting? Pits re-emerge after tumbling R&D on sheet corners anticipated RI did bulk EP on half of the latest batch (six of twelve) –Performance more likely to improve after heavier “light” EP So far, no performance advantage, but potential advantage justifies a controlled promotion of industrial processing –AES has a new EP machine –Process was qualified on a 1-cell cavity –AES to bulk EP six cavities this year Vendor Surface Processing 14Ginsburg (FNAL) 2nd PASI Workshop5.Apr. 2013

Fermilab Industrial Surface Processing 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop15

Fermilab TB9AES013: Pits observed in all three images, but generally enhanced by EP. Pits are not restricted to just the equator weld or the heat affected zone. 1) Optical inspection of equator weld before EP 2) Photo before electropolishing. 3) Photo after electropolishing ( ~ 120 microns removed) Cavities Flash BCP’d at Vendor Ginsburg (FNAL) 2nd PASI Workshop5.Apr. 2013

Fermilab Cavities Bulk-EP at Vendor RI bulk-EP removal amount (um) *KEK grinding repair * 17Ginsburg (FNAL) 2nd PASI Workshop5.Apr. 2013

Fermilab Value Engineering: FNAL Dressed Cavity Cavity Costs 63-71% 11-12% 11-13% 6-13% Dressed Elliptical SRF Cavity Fully Burdened Cost Breakdown *Fermilab Costs Second Pass HPR Reprocess Processing is ~ 13% of the cost of a dressed cavity 18Ginsburg - NGLS Review Feb 5-8, Apr Ginsburg (FNAL) 2nd PASI Workshop

Fermilab Estimated FNAL Cost Breakdown Fully Burdened Cost Breakdown *Fermilab Costs 26%*13% =4% of the cost of a dressed cavity is material removal Processing costs dominated by touch labor 19Ginsburg - NGLS Review Feb 5-8, 2013 Value Engineering: FNAL/ANL Cavity Processing 5.Apr Ginsburg (FNAL) 2nd PASI Workshop

Fermilab Value Engineering: FNAL ILC Cryomodule ILC Type-3 Cryomodule M&S actual cost 43% 26% 15% 20Ginsburg - NGLS Review Feb 5-8, Apr Ginsburg (FNAL) 2nd PASI Workshop

Fermilab FNAL CM Assembly Throughput days 14 days 9 days 8 days 14 days 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop

Fermilab FNAL Cryomodule Assembly CAF infrastructure is fully functional for the 1.3 GHz pulsed cryomodule assembly. We have assembled two 1.3 GHz and one 3.9 GHz cryomodules at CAF. Our experience is still too limited to fully assess each step of the assembly and make optimization. New assembly tooling will be needed to assemble the 325 and 650 MHz cryomodules but the main infrastructure of the CAF looks adequate to assemble these cryomodules. Cavity dressing/qualification and assembly components preparation for cryomodule assembly will probably require some automation in order to increase the throughput for future projects. Cryomodule assembly throughput requirements will dictate hiring and training technicians. Training required for CM assembly is lengthy, especially for cleanroom work. 225.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop

Fermilab ILC Industrialization Workshops Two ILC industrialization workshops took place, with substantial industrial and lab participation –PAC10 Kyoto satellite meeting –SRF2011 Chicago satellite meeting Discussion topics: niobium material, cavity fabrication, industry regional differences, CM fabrication Webpages provide a useful resource 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop23

Fermilab 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop24

Fermilab Summary 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop25  ILC has provided a great opportunity for US SRF industrial development  Cavity vendor development  Cavity processing vendor development  Cavity and cryomodule value engineering exercises are ongoing for future projects  Existing industrialization workshops (ILC) provide a resource for understanding cost reduction targets

Fermilab Acknowledgements Many thanks to our Fermilab, national, and international collaborators for their hard work and excellent contributions to the cavity and cryomodule development presented here Material for this presentation was provided by T. Arkan, J. Kerby*, A. Rowe (FNAL). *now at Argonne National Laboratory 5.Apr. 2013Ginsburg (FNAL) 2nd PASI Workshop26