W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04). W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04)

Slides:



Advertisements
Similar presentations
Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Advertisements


Jan. 2009Jinyuan Wu & Tiehui Liu, Visualization of FTK & Tiny Triplet Finder Jinyuan Wu and Tiehui Liu Fermilab January 2010.
0 LAT Coordinate System LAT-TD (it’s in CyberDocs) Purpose: The hardware and software designs need a clear, consistent and universally accepted.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Frequency Table Example Problem 24 page 42. Put the disk from the book in and find the Excel files and scroll down to Trough. You get this.
DRAFT HCAL digital optic link and trigger mapping DRAFT.
Figure Figure 18-1 part 1 Figure 18-1 part 2.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Examining the top three rows first Row two requires a 5. It has to be located in the middle 3x3 box. Two possible locations for 5 in centre box The centre.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
ZTF Interconnecting Scheme Stephen Kaye
RAID Ref: Stallings. Introduction The rate in improvement in secondary storage performance has been considerably less than the rate for processors and.
Active Cell Name Box Title Bar Formula Bar ColumnsMenu Bar Formatting Toolbar Standard Toolbar Rows Cell Fill Handle.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
TriDAS Equipment database Equipment database is partially built (Oracle). Currently consists of 2 separate databases.  DB I – database containing.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
1 Pad #0 IN WIRE PAD NUMBER 23 CARDIAC OUT 0 1 Output Connector Pad #1Pad #3Pad #2Pad #5Pad #4 HV Side Q1-M4-R4 Cabling Gas Side Cable.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Step 1: Place x 2 term and constant into the box 2x 2 2 PROBLEM: 2x 2 + 5x + 2.
12th Workshop on Electronics for LHC and Future Experiments Valencia Sept F. Loddo I.N.F.N. Bari An RPC-Based Technical Trigger for the CMS.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
PHY221 Ch6: Friction 1.Recall main points: Static and Kinetic Friction 2.Discussion and examples.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
Storage and File structure COP 4720 Lecture 20 Lecture Notes.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
DIVISIBILITY RULES. A number is divisible by: If the number ends in 0 the number is also divisible by 2 and 3 the sum of the number's digits.
Mikolaj Cwiok, 10 June 2009 RPC Operation Day Towards LB configuration through TS: Improvements to CCU ring stability Mikolaj Cwiok – University of Warsaw.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
To Do: 1.Math Boxes Math Boxes Math Boxes Math Boxes Math Boxes Math Boxes Any Unit 1 MB or pages not Not Done.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Jan Królikowski Warsaw University
Chamber Design and Integration RE3/1 and RE4/1
Nearly the end of a long story...
Racks Coordination 16 September 2011 E. Negodin
Darin Acosta University of Florida
מדינת ישראל הוועדה לאנרגיה אטומית
Overview of T1 detector T1 is composed by 2 arms
LS1 status 28/04/2014.
TEC Services Status 30/12/2018 Nick Lumb.
PLC 5 I/O Addressing.
CHAPTER 4 COUNTER.
HV-LV-DCS Status NEWS DCS Endcap Integration
UXC55 ME Muon Endcap On Detector Layout
RPC SYSTEM LAYOUT and DIMENSIONS
2.5 Writing Equations in Slope Intercept Form
Plan The next question would be ... but how do we get the drawings from the 3D object? This will be explained over the next few pages. Take a look at.
RPC Front End Electronics
Drawings taken from: L.Bartoszek and C. Daurer
Chapter 10: Rotation The Rotational Variables
Distribution of informative SNPs with LOH (black bars) on each chromosome (rows, oriented p-arm at the bottom and q-arm at the top of each chromosome)
Digitally subtracted pulse between
QUESTION NUMBER 1.
Note Pages 11 – 13.

PCMB Address Assignments per Station/Rack/Crate
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04)

W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04)

W.Van Doninck 4/2/05 YE-1 +x top floor (9/12/04) 3*100A =12 slots for 3LBB 2*Dis12=24 ch for 6 RE1/2, 6 RE1/3 6 RE2/2, 6 RE2/3

W.Van Doninck 4/2/05 YE-1 +x middle floor (9/12/04)

W.Van Doninck 4/2/05 YE-1 +x lower floor (9/12/04) 3*100A =12 slots for 3 LBB 2*100A = 8 slots for 3 LBB RE1/1 5*Dis12=60 ch for 12 RE1/2, 12 RE1/3 12 RE2/2, 12 RE2/3

W.Van Doninck 4/2/05 YE-1 -x top floor (9/12/04) 3*100A =12 slots for 3 LBB 2*100A = 8 slots for 3 LBB RE1/1 18 RE1/1 (staged) 5*Dis12=60 ch for 12 RE1/2, 12 RE1/3 12 RE2/2, 12 RE2/3

W.Van Doninck 4/2/05 YE-1 -x middle floor (9/12/04)

W.Van Doninck 4/2/05 YE-1 -x lower floor (9/12/04) 18 RE1/1 (staged) 3*100A =12 slots for 3 LBB 2*Dis12=24 ch for 6 RE1/2, 6 RE1/3 6 RE2/2, 6 RE2/3

W.Van Doninck 4/2/05 A1 A2 B1 B2 C1 C2 RPC Chamber Connector Box Connector Box seen from top of chamber: A2 A1 B1 C2 B2 C1 strip 1 Strip row B,C - strip 1 on pins 1,2 of conn. B1 (C1), strip 17 on on pins 1,2 of conn. B2 (C2), Strip row A - strip 1 on pins 31,32 of conn. A1, strip 17 on on pins 31,32 of conn. A2 strip 1

W.Van Doninck 4/2/05 Scheme Connector1Connector2 Strip row /scheme Pin1,2Pin31,32Pin1,2Pin31,32 sch1 A RPC strip#16 Log strip#16 RPC strip#1 Log strip#1 RPC strip#32 Log strip#32 RPC strip#17 Log strip#17 B,C RPC strip#1 Log strip#1 RPC strip#16 Log strip#16 RPC strip#17 Log strip#17 RPC strip#32 Log strip#32 sch2 A RPC strip#16 Log strip#17 RPC strip#1 Log strip#32 RPC strip#32 Log strip#1 RPC strip#17 Log strip#16 B,C RPC strip#1 Log strip#32 RPC strip#16 Log strip#17 RPC strip#17 Log strip#16 RPC strip#32 Log strip#1 Remarks 1. Log strip numbering clockwise, seen along z axis, 2. RPC srip numbering as on page 9, 3. Reoredering of bits must be done on TB (PAC) to have continue and accordant to log strip numbering

W.Van Doninck 4/2/05 Sector1/36 Sector2/36 Sector36/36 Sector10/36 scheme1 scheme2 RPC strip #1 Log strip #1 Log strips (logical trigger strips) counts clockwise looking along Z axis scheme2 scheme1

W.Van Doninck 4/2/05 Sector10/36 Sector1/36 Sector2/36 Sector36/36 scheme1 RPC strip #1 Log strip #1 Log strips (logical trigger strips) counts clockwise looking along Z axis scheme1

W.Van Doninck 4/2/05 RPC’s on disks “Bird’s view” REn/3 z x YE+1 YE-1 IP YE-2 YE-3 YE+2 YE+3 Phi=85 deg.Phi=95 deg. RE1/3 RE2/3 Scheme 1 Scheme 2 Scheme 1

W.Van Doninck 4/2/05 RPC’s on disks “Bird’s view” REn/2 z x YE+1 YE-1 IP YE-2 YE-3 YE+2 YE+3 Phi=85 deg.Phi=95 deg. RE1/2 RE2/2 Scheme 1 Scheme 2 Scheme 1 Scheme 2 Scheme 1

W.Van Doninck 4/2/05 RPC’s on disks “Bird’s view” RE1/1 z x YE+1 YE-1 IP YE-2 YE-3 YE+2 YE+3 Phi=85 deg.Phi=95 deg. RE1/1

W.Van Doninck 4/2/05