Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Construction and Installation of the CLIC Experimental Area
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
Tracking Integration Challenges Y. meeting 2013/9/25.
1 GLD Surface Assembly Y. Sugimoto KEK
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Presented by, Brett Parker, BNL-SMD QD0 Prototype Status.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
2016/9/30 Yasuhiro Infra/CFS mini-ws
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Updated Design of Detector Hall
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Part II: Integrated Design of Infrastructures
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Detector hall in mountain regions
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Detector hall in mountain regions
Extract from today’s talk given to DCB
Presentation transcript:

Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1

Assembly hall for ILD Five pieces of ILD yoke (YE-, YB-, YB0, YB+, YE+) are assembled in the surface assembly hall (AH) Each yoke is assembled on the floor, and moved to a platform in AH by air-pads, and lowered to the underground detector hall after installation of some sub-detectors and magnetic field mapping Muon detectors, solenoid coil, and barrel/endcap calorimeters are installed on surface (Trackers are installed underground) 2

ILD requirement for AH Space –ILD needs assembly space for 5 yoke rings and solenoid –If we assume 25mx10m space for each of YE± and YB±, and 25x20m for YB0 and solenoid, respectively, 25mx80m space is necessary Crane –A 250 ton crane for yoke assembly and an 80 ton crane for solenoid/detector assembly and installation are needed –~4000 ton gantry crane for detector lowering Hall height –22.6m from the floor to crane rail, 6m from crane rail to ceiling, plus alpha for lights and fans on the ceiling Cryogenics –He gas pipes have to be connected from the compressor building for magnetic field mapping in AH Platform –ILD should have its own platform on surface to avoid the risk of delay of SiD construction 3

AH with a garage AH should have a garage (alcove) for ILD to put 2 pieces (YE+, YB+) aside This configuration gives several merits 4 Garage

Merits of AH with garage Shorter AH –ILD assembly area: 80m  65m Flexibility of assembly area configuration, and effective use of 2 cranes Preferable lowering order of ILD –YE-  YB-  YE+  YB+  YB0 is preferable, and can be achieved if we have a garage –YE-  YB-  YB0  YB+  YE+ might be OK if cryogenic apparatus on YB0 is small enough 5 80t crane has no task at this stage

Lowering order of ILD AH w/o garage 6 YE-YB-YB0YB+YE+

Lowering order of ILD AH w/o garage using SiD platform 7 1. Field mapping 2. YE- 3. YB- 4. YE+ 5. YB+ 6. YB0 Platform for ILD Platform for SiD

AH with a garage 8 Lowering order of ILD 1. Field mapping 2. YE- 3. YB- 4. YE+ 5. YB+ 6. YB0 YE+, YB+ step aside YB0 step back

A possible design of AH Plan view Compressor building 9 1 st phase assembly hall for ILD 50m space between 2 assembly halls is required for VS/DH construction

A possible design of AH Side view 10

Size of garage 11

A possible ILD assembly scenario Assumption –Similar timeline as Fig in TDR Vol.3.II –Surface AH shown in the previous pages –Same assembly scenario of superconducting magnet as CMS; YB0  Outer Vacuum Tank (OVT)  Coil  Inner Vacuum Tank (IVT) OVT assemblyCoil insertion IVT insertion 12

A possible ILD assembly scenario Not ILD official timeline Just a working assumption for the assembly space study

A possible ILD assembly scenario Step-1 Surface platform construction YB0 assembly Preparation for coil assembly 250t crane 80t crane 14 Swiveling platform for coil assembly Platform for ILD Garage 1 st phase assembly hall

Step-2 YE+ assembly Coil outer vacuum tank (OVT) assembly Coil assembly 15

Step-3 YE- assembly YE+ Muon detector installation Inner vacuum tank (IVT) assembly Coil assembly 16 IVT

Step-4 YE- assembly YE+ Calorimeter installation IVT, Coil assembly 17

Step-5 YE- assembly YE+ Calorimeter cabling YB0 Muon detector installation Coil assembly 18

Step-6 YB+ assembly YE+ pushed into garage, ECAL cabling YE- Muon detector installation Coil assembly 19

Step-7 YB+ assembly YE- Calorimeter installation Coil, IVT installation  test for vacuum, cooling, and low current 20

Step-8 YB+ Muon detector installation YB0 Calorimeter installation 21

Step-9 YB+ pushed into garage YE- pushed to vertical shaft side YB- assembly, Muon detector installation YB0 Calorimeter installation 22

Step-10 Close detector Field mapping (SiD is >50m away from ILD) 23

Conclusion AH with a garage has several merits for ILD If AH can have a garage, ILD can be assembled with 65m (=52.5m+12.5m) length of AH (1 st phase AH) Total length of AH could be ~180m ( m) if SiD requires same length of assembly area 24