NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.

Slides:



Advertisements
Similar presentations
Broadband Networked Drill String Unlocks Operational Performance Potential by Transmitting Downhole Measurements in Real Time Authors: Daan Veeningen,
Advertisements

Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
Petroleum Services Well Construction Project Management Drilling Consultancy Reservoir Management Field Management Field Operations Ops.
WITSML Office Aggregrator
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
The Business Value of Using Sensors Atul Arya, BP plc Presented at the 2008 IBM Almaden Institute.
Using the WITSML™ protocol for analysis in Drillworks – past case studies and current applications Drew Swanson May 11, 2006.
Update on WITSML deployment in BP - Energistics Public Meeting Houston, 28 May 2009 Dr Julian Pickering Field of the Future Business Deployment.
1. Forward Looking Statements/Additional Information and Cautionary Note Regarding Hydrocarbon Disclosure Except for the historical information contained.
Classification: Internal Status: Draft WAG Mechanisms at macroscopic/ field level Presentation at FORCE WAG Seminar Stavanger, 18 Mar 2009 Anders Gjesdal.
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
Chapter 19: Network Management Business Data Communications, 4e.
Global Real Time More Efficiency. More Possibilities and.
Petroleum Engineering
Baker Jardine Petroleum Engineering & Software Gas Lift Diagnostics A New Approach Daniel Lucas-Clements Baker Jardine.
© 2012 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
It’s About Time Sanjaya Sood May, Initials Key Industry Drivers The Emergence of Three Main Trends Introduction of new enabling technology, bringing.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
Private Cloud: Application Transformation Business Priorities Presentation.
Marginal Field Development Advances in 3D Geological Modeling: How it can help?
Schlumberger Update Nigel Deeks Real Time Technology Manager
Checkpoint Technologies Corporate Overview Faraz Syed VP of Technical Sales Office:
Copyright © 2015, Drillinginfo, Inc. All right reserved. All brand names and trademarks are the properties of their respective companies. 1 DI Transform:
Sedimentology & Stratigraphy:
Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.
Unconventional Rod Nelson Schlumberger IPAA 75 th Annual Meeting Oct 28, 2004.
1 © 2008 OSIsoft, Inc. – Company Confidential Customer Cases PI in Oil & Gas British Petroleum.
Centre for Petroleum Production Facilities CPPF SINTEF / MARINTEK / IFE / IRIS / UiS / NTNU In co-operation with the petroleum industry Copyright CPPF.
APC InfraStruxure TM Central Smart Plug-In for HP Operations Manager Manage Power, Cooling, Security, Environment, Rack Access and Physical Layer Infrastructure.
INTEQ Answers While Drilling SM John Shields Director of Software Baker Atlas/INTEQ Houston, TX.
Challenges in Urban Meteorology: A Forum for Users and Providers OFCM Workshop Summaries Lt Col Rob Rizza Assistant Federal Coordinator for USAF/USA Affairs.
Real-time Operations Center Architecture
WITSML – Realizing the Value John Shields Baker Hughes.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
Gas Lift Training Feb 5, 2002 ASME Gas Lift Workshop Mike Johnson, EMPC/Central Engineering-SSE.
PRODUCTION OPERATIONS AND MAINTENANCE
OIL AND GOVERNANCE State-owned Enterprises and the World Energy Supply GEMBA 11.
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
Planning for Capacity “Infrastructure Consolidation at ENOC”
Classification: Statoil internal Status: Draft
Update on WITSML deployment in BP - Energistics Public Meeting Dubai, 19 November 2008 Dr Julian Pickering IT Programme Manager Drilling & Completions.
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
Real time data in Statoil
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Shell Exploration & Production Copyright: Shell Exploration & Production Ltd. 6/5/2016 File Title Shell taking the next step with WITSML May 2008 Update.
Collaborative Digital Surveillance: Improving Decisions Through Visualization Technology Stephen Smart Subsurface Modeling Concepts, Inc.
1 -Classification: Internal Gullfakslandsbyen 2011 Knut.
Induced Seismicity Consortium (ISC) Quarterly Review Meeting, Q Quantifying Seismic Hazard from Subsurface Fluid Injection and Production (SFIP)
Paulus obey DAPCEP 3/29/14. A petroleum engineer is involved in nearly all of the stages of oil and gas field evaluation, development and production.
1 Expro is an oilfield service company which operates in over 50 countries with more than 5000 employees, providing equipment and services to support exploration.
Chapter 1 An Introduction to Information Systems
Building a Permanent Infrastruture including in e-field operations Real Time Operations.
Independent, integrated thinking.
FIELD SERVICE upstream solutions. statement of capability We deliver reservoir, well, and integrated field management services to the upstream oil and.
1 1 Presenter / date if required Independent, integrated thinking.
1 Future Consideration for WITSML from Total Products should migrate to the same version of WITSML Need provisions for backup in case of system failure.
WITSML IN THE REAL WORLD Facing the necessity of remote operations Jamey Webster Chief Executive Officer November 6, 2007.
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Nov. 13, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Gas-Lift Future An Extension of the Past, or a Whole New World? by Cleon.
1.Why it is important to study and understand information systems. 2.Distinguish data from information. 3.Name the components of an information system.
Introduction to Well Completions
The application of quantitative risk analysis (QRA) techniques for well construction in complex reservoirs West Vanguard Snorre cross-section.
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
INSTRUCTOR © 2017, John R. Fanchi
Recent Advances in Oil and Gas Production Engineering
Oil & Gas Integrated Operations using aspenONE
Digital Innovation in Oil & Gas
Infinium Energy Services
Presentation transcript:

NOT AN OFFICIAL UNCTAD RECORD

2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those quantities of petroleum which, by analysis of geological and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under current economic conditions, operating methods, and government regulations”

3 Elements Affecting Reserves  Reservoir characteristics  Oil prices  Cost  Contracts (PSA)  Corporate procedures, technology used.  Government regulations .

4 The time dimension  NPV (Net Present Value) = Cash(t)/(1+ rate) t  Cash={Oil/Gas x Unit Price – (CAPEX+OPEX)}  Increase NPV with early production  Increase NPV with fast recovery  Increase NPV with more oil/gas recovery  Increase NPV with reduced CAPEX and OPEX Investment time $ Production time

5 Shorten the investment time  Quick regulator and partners approvals  Quick Design and Engineering  Quick Equipment Manufacturing, delivery and installation .

6 How does real time information shorten well construction time?  Reduce well placement time –Drill the hole to target reservoir at first trial –Avoid high pressure zones which increase drilling risks –Use reservoir illumination on first wells to optimize placement of future wells.  Reduce drilling time –Real time feedback on formation, ECD, gas count, mud losses to optimize drilling practices.  Collaborative work space to speed up the decision making process –Where to core? Where to put the casing point? When to stop? –Is the right tool run? Is the tool calibration done properly? –Is the data interpreted properly?  Reducing completion time –Where to perforate? –Gravel placement / Stimulation design and execution monitoring  Crisis management –Equipment failure –Contingency

7 Real time drilling center Geosteering of horizontal drain Driver: work in a collaborative way to optimize the position of the drain Norway

8 Aberdeen UK: Improve drilling efficiency in the north sea

9 Location: Deep Water East coast, India. Remote Center: Onshore Center - Mumbai Case: Evaluate commerciality of a potential gas reservoir It involved surface readout of pressure below the downhole DST valve using the DataLatch* electrical wireline downhole recorder and transmitter system. Real-time data allowed for quicker response and better decision-making. Effective communication between engineers at the wellsite and the onshore center. Well testing in India “This was the first time that this type of data transfer for a DST was attempted in any of our wells. We all appreciate the Schlumberger effort for providing real-time data through its InterACT system to our office. The implementation of real- time data transfer was very productive, and we would like to use this process again in the future.” Customer Reservoir Department

10 right now? Investment time $ Production time

11 Optimize the Production Time  Accelerate production  Reduce down time  Identify and fix problems wells  Optimum utilization of down hole equipment to reduce failures.  Extend the completion life

12 How to Optimise the Production  Onshore “control centers” improve daily reservoir and field asset management  Capable staff focus on high-potential issues and complex problems  Continuous data from many sources is managed and integrated into reservoir and economic models  Sub-surface model refreshed with new information and knowledge  Early identification of discrepancy between real and simulated data

13 ProductionWatcher* Diagnostics – eg, PTA, Nodal Analysis

14 Real Time Reservoir Management: The Enabler  By improving reservoir imaging and characterization  By monitoring the reservoir response and the ability to control the well real time.  By using information management systems and the relevant technologies  By facilitating decision making with the use of expert software, visualization and collaborative work environments The focus is on increasing hydrocarbon recovery factors from 25% to 40% or more.. The Digital Oilfield Schlumberger Information Systems & DCS

15 Real time decision making workflow Monitoring Data Transmission Data Manipulation and Storage Decision- making Instructio ns Action

16 Decisions & Activities: Time Span seconds1 day90 day2 years10 years  Control room decisions  Event & fault response  Minimize downtime  System reconfiguration  Export obligations  Safety  Choke & sleeve settings  Lift system diagnostics and optimization  Network optimization  Planning of simultaneous operations on integrated offshore platforms  Optimize reservoir drainage, injection  Infill wells  Remedial well ops  Recompletions  Schedule interventions  Optimize investment planning  Optimize secondary recovery  Tie-in marginal fields Operator Optimization Production Optimization Field Optimization Reservoir Recovery Optimization

17 Oilfield Assets: Challenges and Potential Controlled Shutdowns Scheduled Maintenance Uncontrolled Shut downs Gathering Bottlenecks/ Process Inefficiencies Completion Inefficiencies Reservoir / Well Restrictions Field Development Inefficiencies True Economic Field Potential Actual Output Today Monitoring, Control and Surveillance Production Optimization Reservoir Optimization

18 Real time information today is a reality