The methodologies reflected in the enclosed material, including the benchmark comparisons, are confidential and proprietary information of NewLane, LLC.

Slides:



Advertisements
Similar presentations
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Advertisements

Planning: Processes and Techniques
Evaluating Decision Support Systems Projects. Who Evaluates Technical Managers  Chief Information Officer,  Corporate IT professionals,  Database administrators,
Planning and Strategic Management
CISB444 - Strategic Information Systems Planning
President, Ward Group Gaining 360 o View of Your Claims Operation April 28, 2010 Jeff Rieder Program Manager, Assessments, Guidewire Software Eugene Lee.
Performance Measurement and Strategic Information Management
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
Bulgaria “How to make a business plan”. The business plan is written document describing the nature of the business, the sales and marketing strategy,
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 11 Business/IT Strategies for Development.
CUSTOMER PERFORMANCE MANAGEMENT PROGRAM WHAT IS IT ALL ABOUT? Evalu8r is an Operational Management Tool that enables business to successfully retain,
Customer Relationship Management (CRM)
Strategic Management and the Entrepreneur
The Evergreen, Background, Methodology and IT Service Management Model
© 2005 Virtue Ventures LLC. Licensed under a Creative Commons Attribution-Share Alike 3.0 License Feasibility Analysis For Social Enterprise.
4.04 Understand marketing- research activities to show command of their nature and scope.
CSI315 Web Applications and Technology Overview of Systems Development (342)
Chapter 11 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Marketing Research, Primary Data, Secondary Data, Qualitative Research, Quantitative.
The Challenge of IT-Business Alignment
Instructore: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Requirement engineering.
Balanced Scorecard Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 27.
PAPER PRESENTATION: EMPIRICAL ASSESSMENT OF MDE IN INDUSTRY Erik Wang CAS 703.
Masterful Facilitation Model. Facilitation Cycle Designing Intervention Facilitating &Evaluating Results Initial Contact & Clarify Objectives.
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part 2.
Lecture 7: Requirements Engineering
Formulating a Simulation Project Proposal Chapter3.
Information, Analysis, and Knowledge Management in the Baldrige Criteria Examines how an organization selects, gathers, analyzes, manages, and improves.
Gathering Information Enables You To: 1. Reduce risk 2. Determine consumer attitudes 3. Monitor the environment 4. Coordinate strategy 5. Measure performance.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
All rights reserved | Phone: | Website: © 2004 Accenture All Rights Reserved.
Introduction to IT investment decision-making Pertemuan 1-2 Matakuliah: A Strategi Investasi IT Tahun: 2009.
The Marketing Plan Vishnu Parmar, IBA, University of Sindh, Jamshoro.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
Outlines Overview Defining the Vision Through Business Requirements
Masterful Facilitation Model. Facilitation Ladder Basic Facilitation Skills TOT Facilitation Facilitation as Core Competency.
Strategic alignment.
Table 1: Comparison of Management and Financial Accounting.
Siebel Migration Assessment with Microsoft Consulting Services Assess whether your Siebel implementation is the right Solution for your current and future.
Value network analysis for complex service systems: Author : Juite Wang Jung-Yu Lai Li-Chun Hsiao Professor : Soe-Tsyr Daphne Yuan Presenter : Po-Wei Chiang.
The Strategic Management Model
October 8th, 2003 Into the LAN: The Integrated LAN/WAN Services Opportunity © 2003 Frost & Sullivan. All rights reserved. This document contains highly.
March, 2004 Into the LAN: An Integrated LAN/WAN End User Study © 2004 Frost & Sullivan. All rights reserved. This document contains highly confidential.
Strategy Evaluation and Control
Proposal and Company Information Document CONTENT About Indagatio Research Our Research Offerings Why Indagatio Research Our Work Process Project Snapshot.
Sourcing Evaluation Life Cycle Go/No Go decision points Competition Alignment Discovery Con tract Modification Project Initiation Vendor Capabilities Contract.
Information Technology Planning
The Strategic Management Model
Strategic Information Systems Planning
EITS Planning & Decision Support
AS1: Business Studies (Quality Management) Quality Management
Value Analysis and Benefit/Risk Methodologies Pertemuan 25-26
Identify the Risk of Not Doing BA
The Strategic Management Model
The Strategic Management Model
Level - 3 Process Areas (CMMI-DEV)
ENT 435 Competitive Success/snaptutorial.com
ENT 435 Education for Service-- snaptutorial.com.
ENT 435 Teaching Effectively-- snaptutorial.com
ENT 435 Education for Service-- tutorialrank.com
TRANSFORMATIONAL CHANGE
Learning Objectives Understand the types of strategic decisions for which different managers are responsible Describe a comprehensive model of strategic.
Strategic alignment © Pearson Education 2012.
EC Strategy, Globalization, and SMEs
ISO 9001 Auditing Practices Group
ISO 9001 Auditing Practices Group
Avoiding the Pitfalls that can Doom the Best Sales and Marketing Strategies… Beyond the CRM Hype Greg Hatfield Senior Vice President
Chapter 7 Process Management.
ISO 9001 Auditing Practices Group
Presentation transcript:

The methodologies reflected in the enclosed material, including the benchmark comparisons, are confidential and proprietary information of NewLane, LLC. and are for the internal use of addressee only. NewLane, LLC. 290 Brigham Street Hudson, MA For more information please contact: Alex Marchicelli Tel: Cell: Time to Market Process Improvement – A Case Study November 8, 2000 ©NewLane, LLC All rights reserved.

2 Introduction This case study explores the strategies used in a real-world scenario to shorten time-to-market and achieve process improvements. Background The Third largest long distance telecommunications company in the U.S. is in the process of rolling out a new architecture and set of services designed to compete for integrated digital telephony services. Creating this new service requires integrating a set of new hardware and software components that are built into the new product architecture at varying stages of the product development life cycle. This new product is comprised of a portfolio of over 200 applications, with up to 5 releases per application. Lastly, multi-vendor management of the new hardware creates additional complexities due to the dependency on a large number of vendors.

3 ©NewLane, LLC All rights reserved. Problem Definition Is Product Testing Taking Too Long, Slowing Down the Company’s ability to Go To Market Quickly? The ability to reach the market quickly is a potential source of competitive advantage Compressing the product development and implementation cycle time is a high priority In the product development and implementation process, testing is an important component of overall cycle time The company has traditionally been cautious about putting new network services onto the market and has focused on quality of service There is a perception that the company is willing to tolerate additional risk with getting the product to market more quickly, at the potential expense to quality of the product delivered The ability to reach the market quickly is a potential source of competitive advantage Compressing the product development and implementation cycle time is a high priority In the product development and implementation process, testing is an important component of overall cycle time The company has traditionally been cautious about putting new network services onto the market and has focused on quality of service There is a perception that the company is willing to tolerate additional risk with getting the product to market more quickly, at the potential expense to quality of the product delivered

4 ©NewLane, LLC All rights reserved. Project Scope Overall Project Objective Determine how to reduce testing cycle time* while preserving the quality of service delivered to customers Specific Objectives Challenge existing assumptions about testing to break paradigms Validate from external benchmarking perspectives, if testing is taking a “long” time, and identify creative approaches to testing Identify short-term process improvements that will have a positive impact on reducing cycle time

5 ©NewLane, LLC All rights reserved. Strategies Used to Solve Problem  Assertion/Hypothesis Methodology  Conducting Assessments (Process and Productivity)  Benchmarking  Establish Performance Models using “Balanced Scorecard” approach

6 ©NewLane, LLC All rights reserved. Assertion/Hypothesis Methodology  Scientific method based on proofs, quantitative and qualitative analysis  Used for Root Cause analysis History Definition A formulation of hypotheses whereby the user goes about proving the hypotheses right or wrong.  Causal analysis  Interdependency between line function’s and hypotheses

7 ©NewLane, LLC All rights reserved. Conducting Assessments Internal External  High Impact Interviews  Questionnaire  Workshops  Phone or on-site Interviews  On-Line or Questionnaire To collect quantitative data in support of or dispute the hypotheses, and to determine corrective action.

8 ©NewLane, LLC All rights reserved. Benchmarking Purpose To collect similar type data and compare it against industry norms and/or use the baselines to compare the data against its own history Tips  Make sure questions are “correctly” formulated  Avoid “leakage” of data by conducting on-site interviews  Use appropriate rating technique

9 ©NewLane, LLC All rights reserved. Performance Models using Balanced Scorecard Approach Definition A performance measurement criteria based on “four” perspectives – Customers, Learning and Growth, Internal Processes, and Financial Why BS? It enables companies to assess and continuously measure performance, and to quickly change measurement criteria based on market dynamics.

10 ©NewLane, LLC All rights reserved. Assessment & Assertion Findings Determine where the potential lies for shortening development cycle

11 ©NewLane, LLC All rights reserved. Performance Model This will lead into a set of Interrelated Performanc e Pathways

12 ©NewLane, LLC All rights reserved. Performance Pathways

13 ©NewLane, LLC All rights reserved. This will lead into the formulation of a performance Scorecard

14 ©NewLane, LLC All rights reserved. All of which results in a reduction in cycle time.