P ROJECT O WNERS SHOULD INCREASINGLY ADOPT THE C OST P LUS MODEL OVER LSTK P OSITION : A GAINST THE M OTION Kuwait City, Kuwait - 12 th June 2011 PMI AGC.

Slides:



Advertisements
Similar presentations
WORKSHOP 3: Building a European funding & financial framework for the TEN-T The role of PPPs & the private sector Enrique Fuentes, Development.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
1st PMI AGC Energy Forum: DMS Debates :
Construction Engineering 221
Benefits of Construction Management
Construction Contracting
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
AACEI Contingency Forum Contingency Management
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Salah Jebara Al Bu Falah Abu Dhabi June 2010 Oil and Gas Forum Debate Presenter: Salah J. Al Bufalah 1.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Value for Money Edward Farquharson 12 May Agenda Development of the UK’s approach to ex ante VfM assessment Ex post VfM assessment Some observations.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
BongSung 2 Hydro Power Plant Global Power Specialty Song Bong 2 Hydro Power Plant August 25, 2010 Aon Vietnam John Nolan, Daniel Busuttil, Fareed Imadi.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
1 Anatomy of a Successful LNG Project Gastech 2008 Original Conceptual Photo of EG LNG Train 1.
Construction Engineering 221 Contracts & Contractor Procurement.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
February 2006 The Importance of Subcontract Management to Program Success.
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
1st PMI AGC Energy Forum: DMS & PMI Debates Abu Dhabi, UAE 2nd June Wael H. Al-Jasem (MBA, PMP, MSP Register Practitioner) EPCs on Bonus Incentive.
“P ROJECT O WNERS (NOC’ S ) SHOULD INCREASINGLY ADOPT LONG TERM PMC CONTRACTS OVER PMC CONTRACTS FOR INDIVIDUAL PROJECTS ” 2nd PMI-AGC Energy Forum: DMS.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
TYPES OF CONTRACTS.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
1 1st PMI AGC Energy Forum: DMS Debates NOCs in the GCC no longer need a PMC on a Project 2 nd June 2010 Essa Al-Ansari.
1 st PMI AGC ENERGY FORUM: DMS DEBATES June 2, 2010 EPCs Should be on a Bonus Incentive Scheme to Exceed Contract Expectations Dependability, Expertise,
Copyright [insert date set by system] by [CH2M HILL entity] Company Confidential 2 nd PMI AGC Energy Forum Cost plus vs. LSTK 12 June 2011.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Information Technology Professional Services (ITPS)
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Procurement Policy Summary
Project Execution in Process Industry
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Light Rail Transit Project
Procurement Management
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CM at Risk v. Design-Bid-Build
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Types of contract selection based upon following:
COST PLANNING AND ESTIMATION
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Subcontracts Owner doesn’t “recognize” subcontractors
Tips for success and traps to avoid
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Project Management Method and PMI ® PMBOK ® Roles
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Chapter 2 – Review ‘construction management’
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

P ROJECT O WNERS SHOULD INCREASINGLY ADOPT THE C OST P LUS MODEL OVER LSTK P OSITION : A GAINST THE M OTION Kuwait City, Kuwait - 12 th June 2011 PMI AGC Energy Forum: DMS Debates Dr. Mohammed Sammur - Executive VP, Larsen & Toubro Salah Jebara Al Bufalah - Head of Major Projects ZADCO & President PMI AGC UAE Felipe Revenga – Chief Operations Officer, Tecnicas Reunidas

2

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas C OST P LUS - D ISADVANTAGES Contractor and Subcontractor Controlled by Owner Delays and Errors assumed by Owner Diffuse Accountability PMC not enough empowered C ONSTRUCTION SOW  Undefined and NOT CLEAR SOW self-developed during project execution High Probability of Changes Potentially oversized Team E NGINEERING ALL Risks by Owner Uncertainties in Project Price & Schedule G ENERAL Procurement Cycle normally longer than LSTK Price negotiation advantages missed  No incentives P ROCUREMENT

4

LSTK M ODEL – A DVANTAGES O WNER ´ S B ENEFITS Competitive Bids according to Market Value Total Cost Fixed. Owners do not have pressure about Costs Contractors may contribute to find sources of financing Reliable Forecast of Total Investment Cost Risks assumed by Contractor Single Point Responsibility (Contractor) Owner focused on Schedule, Quality and HSE Schedule defined and agreed Better definition of SOW since the beginning

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas Early BE/FEED Validation and Freezing Early problems detection Design Changes minimized Engineering Team focus in Schedule and Quality of deliverables LSTK M ODEL – A DVANTAGES G ENERAL

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas LSTK M ODEL – A DVANTAGES E NGINEERING P ROCUREMENT Price deviations (E&M) and uncertainties vested in Contractor Manufacturing and Delivery (E&M) Schedule and Quality are controlled by Contractor Vendors' Management is Contractor´s responsibility G ENERAL

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas LSTK M ODEL – A DVANTAGES C ONSTRUCTION P ROCUREMENT E NGINEERING G ENERAL Owner do not have to take responsibility to Control Subcontractors. Safety performance Optimized and Maximized Construction troubleshoots by Contractor Contractor is empowered  Total Control Construction

9

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas LSTK M ODEL – R ISKS R ISKS TRANSFER TO C ONTRACTORS EPC-LSTK implies to contract a specialist in Risk Management

LSTK – T IPS TO R EDUCE & C ONTROL R ISKS Early Procurement Early and Efficient KOM with vendors Vendors Dwgs.  Early reviews and approvals at workshops Reducing Quality Deviations Construction Organization involved since Engineering Phase Early agreement of Subcontracts Continuous Critical Path Analysis and deviation actions Construction & Commissioning Driven Projects Early Eng. Works and quick mobilization to Taskforce. Design Changes controlled and Limited at early stages Enhance Quality Policies (Check Lists, procedures)

12

LSTK M ODEL M ORE A TTRACTIVE ? Realistic Schedule, with reasonable period for Bid preparation Balanced Terms and Conditions. Liabilities, LD’s, Bonds, etc Sharing some of the uncontrolled risks and rewards, Multi- Currency Bid, Commodities Indexing, Exchange Rates fluctuation, etc Incentives Programs (Quality, HSE, Schedule) Apply Value Engineering LSTK through Open Book Conversion 6 6

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas LSTK M ODEL M ORE A TTRACTIVE ? OBE + LSTK M ODEL Real Cost + an agreed Conversion factor assures a fair juice to Client and Contractor. Time enough and develop the project and to avoid unnecessary contingencies. Application of Cost Saving to mach project cost to Clients budget. Short bidding period, as cost estimate does not need to be as detailed Shorten of the overall schedule of the project as time for Extended FEED and EPC bidding is shortened dramatically. ADVANTAGES

June / 2011PMI AGC Energy Forum: DMS Debates Felipe Revenga - COO, Técnicas Reunidas LSTK M ODEL M ORE A TTRACTIVE ? OBE + LSTK M ODEL

Kuwait City, Kuwait - 12 th June 2011 THANK YOU GRACIAS شكرا THANK YOU GRACIAS Dr. Mohammed Sammur - Executive VP, Larsen & Toubro Salah Jebara Al Bufalah - Head of Major Projects ZADCO & President PMI AGC UAE Felipe Revenga - COO, Tecnicas Reunidas