GlueX Collaboration Meeting May 12-14, 2014 12GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.

Slides:



Advertisements
Similar presentations
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Level-1 Trigger Commissioning H.Dong, A.Somov Jefferson Lab Trigger Workshop, Jul 8, 2010.
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
Integrated Tests of a High Speed VXS Switch Card and 250 MSPS Flash ADC Hai Dong, Chris Cuevas, Doug Curry, Ed Jastrzembski, Fernando Barbosa, Jeff Wilson,
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
EIC Workshop 21 May 2008 Experience with high trigger R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division Topics Cebaf’s Large.
1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Trigger Database Dmitry Romanov. Run Control Super- visor Agent CODA ROC Write Configuration tag – run number Run Config DB CODA ROC Agent    Hardware.
GlueX Collaboration Oct '06 C. Cuevas 1 Topics: Projects and Progress 250Msps Flash ADC Energy Sum Module The Bigger Picture DAQ/Electronics Work Plans.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas 1.Hardware Design Status Updates  Production News  Status.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
GlueX Collaboration Meeting 12GeV Trigger Electronics October 4 - 6, 2012 R. Chris Cuevas 1.Hardware Design Status Updates  Production News  Acceptance.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Solid SIDIS DAQ Solid collaboration meeting June 2 nd /3 rd 2011 Alexandre Camsonne.
06/07/041 F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J. Barbosa
Hall D Level 1 Trigger Dave Doughty 1/10/2008 Hall D Collaboration Meeting.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
1 Trigger and DAQ for SoLID SIDIS Programs Yi Qiang Jefferson Lab for SoLID-SIDIS Collaboration Meeting 3/25/2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Trigger Interface and Distribution J. William Gu Jefferson Lab 1. What is TID 2. TID Structure and functions 3. Possible usage in the system 4. TID related.
HPS ECal Trigger Status Scott Kaneta Fast Electronics Group – Jefferson Lab June 5, 2013.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
GlueX Collaboration Meeting 12GeV Trigger Electronics 10 May 2010 R. Chris Cuevas 1.FY10 Project Goals  Update from January 2010 Collaboration Meeting.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
Ba A B B1 FADC B2 SD_FP FLEX_I/O ROC VME64x A: [ HELICITY, HELICITY_FLIP ] (NIM or ECL) Port 1 Port 2 a: [ HELICITY, HELICITY_FLIP ] (LVDS) B: [ HELICITY_TRIGGER,
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
GTP Update 3 March Cuevas. CPUPP17PP15PP13PP11PP09PP07PP05PP03PP01SWASWBPP02PP04PP06PP08PP10PP12PP14PP16PP18 64x***SSP GTPA GTPB SSP TI DP1LVPECL.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Fast Electronics Group Experimental Nuclear Physics Division
CLAS12 DAQ & Trigger Status
B. Raydo, C. Cuevas, D. Abbott, B. Moffit, J. Wilson, S. Boiarinov
Jean-Sebastien Graulich, Geneva
Counting Mode DAQ for Compton
fADC125 Status Cody Dickover
JLAB Front-end and Trigger Electronics
Fernando J. Barbosa F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J.
New Pipeline DAQ and 12GeV Trigger Systems
Example of DAQ Trigger issues for the SoLID experiment
CLAS12 Timing Calibration
Commissioning of the ALICE-PHOS trigger
Presentation transcript:

GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation & Commissioning  Summary

2 Trigger Hardware Status Trigger Supervisor ( TS ) - Complete  No open issues  ‘3 rd ’ Trigger crate installed in U1-14 to support separate FDC-CDC DAq -ROC, TS  SD  TD needed in the 3 rd crate -Fiber patch cables will be reassigned to 3 rd crate TD when needed Trigger Supervisor Input/Output (TSIO) – Complete Rear transition board tested with Densishield cable from GTP Global Trigger Processor ( GTP ) – Complete  Progress from last collaboration report includes test verification of CODA libraries before revision release. (Ben, Bryan, D. Abbott)  CODA process runs on embedded Linux OS on the GTP  Interface through Ethernet for configuration and diagnostics William Gu Ben Raydo Bryan Moffit

TI – TD Trigger Interface – Trigger Distribution - Complete  TI-Master units installed and are permanently wired to support partial readout of large detector subsystems. (BCAL, FCAL)  TD firmware and TI firmware versions are stable and supported with CODA3 libraries  New feature added to TI  TD fiber optic link. ROC ID information is transferred so the fiber link source and destination is available for verification. SubSystem Processor ( SSP ) - Complete  Firmware version 1.0 and CODA3 library complete  New feature added to SSP  CTP fiber optic link. Information is transferred so the fiber link source and destination is available for verification. Signal Distribution ( SD ) - Complete  New firmware development is progressing to use VXS lanes from SD to TI for diagnostic data transfer. Other applications have been discussed. 3 Trigger Hardware Status William Gu B. Moffit D. Abbott

Crate Trigger Processor VXS Connectors Collect serial data from 16 FADC-250 (64Gbps ) Hai Dong Jeff Wilson 2013 Production CTP New Front Panel I/O 4 Crate Trigger Processor ( CTP ) - Complete Production quantities (30) for Hall D All production boards pass (FCAT) Full Crate Acceptance Testing CTP boards delivered to Hall D group CTP boards installed in L1 crates BCAL FCAL TOF - Tagger Waiting for Tagger crates and Trigger fiber optic cable installation -PS, ST crates not populated yet Energy Sum algorithm for FCAL and BCAL has been modified to handle baseline fluctuations and noise. Channel thresholds, and baseline values are stored. BCAL cosmic trigger firmware is complete and handles channel organization from each BCAL module. ‘Sliding time window’ allows for pulses to be captured from each end of the module. MTP Parallel Optics 8 Gbps to SSP

5 Crate Trigger Processor - Firmware Hai Dong A.Somov B.Moffit Pair Spectrometer ST Start counter TOFTOF CTP(1) BCAL FCALFCAL CTP(8)CTP(1)CTP(12) Significant firmware development, simulation and testing has been completed and includes requirements for Scaler (counters) for diagnostics and histograms. PS, ST, and TOF specific trigger features are progressing nicely. CODA libraries are in progress, and testing is an ongoing activity.

 Flash ADC 250Msps ( FADC250 ) - See Fernando’s update also “Mode 6” (TDC algorithm) has been corrected from initial release. New firmware for this mode has been tested thoroughly. -Readout data includes pulse integral value and time stamp value is high resolution (LSB=62.5ps; 6-bits) -This mode will be used for production Physics operations and will be required for maximum trigger rate -Firmware iterations for Trigger applications (i.e. BCAL, Tagger, etc.) are ongoing.  See Bryan Moffit’s DAQ site that contains the latest Jlab Module Manuals with notes for relevant firmware version -Firmware change request method is working well 16 Trigger Hardware Status F. Barbosa H. Dong E. Jastrzembski Jeff Wilson

Global Trigger Testing - Update Significant installation activities have been completed since moving the Global Trigger crate and TS  TD crate to the Hall on. 17-Feb-2014! Details: -FCAL, BCAL, FDC and CDC crates have all been connected to TD (TS) crate. -All crates have been synchronized and delays set appropriately. These will need to be changed after the Tagger fiber cable is added to the system. -CTP   SSP links are established and progress continues toward running full deterministic high rate testing with ALL Trigger system modules. Use “Playback” mode with high Pseudo-random Trig2 to simulate system with nominal occupancy. Verify Trigger counters, alignment, and other critical parameters 7 Ben Raydo William Gu B. Moffit 2.954us Measured full ‘round trip’ trigger latency

Global Trigger Testing - Update 7 Trigger Group 8

Global Trigger Testing - Update 7 Trigger Group 9

Trigger Fiber Optics Trigger System Fiber Optics (Q1 – FY14 procurement)  System diagrams have updated for Hall D  Thanks to Hall D group for installation help! 10 A. Stepanyan M. Taylor Received, not installed

What’s next? Activity – Performance Testing Establish trigger distribution connections (Fiber) to all crates Main FO trunk lines and patch panels installed Install TD and TS boards in TD crate Set required delays for each TI fiber length and measure trigger signal alignment between crates in each subsytem Global Crate Establish CTP  SSP fiber link connections o Run deterministic test patterns to measure and verify L1 trigger alignment and scaler counts. o Measure and verify other Global Trigger system functions Cosmic ray commissioning is ongoing for each detector -Use BCAL to trigger FDC (and CDC?) (Is this a milestone?) -Many other commissioning tests omitted here, 11

Summary Global Trigger and Trigger Distribution crates are installed FO trunk lines are installed and tested - Tagger, PS/ST crates still need to be installed and connected to patch cables Firmware released for all boards, including new updates for FADC250 “TDC” feature Significant firmware development for BCAL cosmic ray trigger, and energy summing developments have been prioritized. (See example below)  Tagger “Hit Count” algorithm, TOF, and Pair Spectrometer applications  Scaler (counters) have been updated for diagnostics and histogram applications Essential CODA library development and library release is complete for almost every board. Check out 12GeV Trigger hardware progress: Questions? 12

All sorts of cool stuff

All Trigger Modules Delivered! 2 Front End Crate FADC250, (FADC125), (F1TDC) Crate Trigger Processor Signal Distribution Trigger Interface Trigger Control/Synchronization Trigger Supervisor Trigger Distribution L1 Trigger ‘Data’ MTP Ribbon Fiber Trigger ‘Link” Control Clock, Sync MTP Ribbon Fiber Global Trigger Crate Sub-System Processor Global Trigger Processor

Full DAq Crate Testing Plans 17 Before deploying full crates with all required modules: Will test using “Playback” mode and CODA No input cables necessary; User defined signals loaded in front-end FPGA Deterministic test for all channels and Gigabit serial lane alignment check Verify TI  SD  Payload Board Synchronization and Clock Re-Use these tools for Hall commissioning effort Test station used for FINAL firmware verification and software ‘library’ development Bryan Moffit has created a preliminary plan and list of test functions See wiki link  This full crate test station in EEL109 is an essential infrastructure element needed to test and verify the front end and trigger hardware/software before installation in the Halls. Bryan Moffit Et al.

System Description Crate Trigger Processing Flash ADC Modules Detector Signals Sub-System Processing (Multi-Crate) Global Trigger Processing Trigger Supervisor (Distribution) TS -> TD -> TI Link 1.25Gb/s Bi-Directional BUSY Trigger Sync Trig_Comnd CTP -> SSP -> GTP L1 Trig_Data Uni_Directional Energy Sums 6

Noise in the FADC (No Readout during data taking) 03/21/2012CniPol Meeting 17 Single Event All Events

Noise in the FADC (Readout during data taking) 03/21/2012CniPol Meeting 18 Single Event All Events

Two DAQ Crate Testing: FY11 200KHz Trigger Rate! Pre-Production and 1 st article boards have been received and tested Significant effort for circuit board fabrication, assembly and acceptance testing System testing includes: Gigabit serial data alignment 4Gb/s from each slot 64Gb/s to switch slot Crate sum to Global Low jitter clock, synchronization ~1.5ps clock jitter at crate level 4ns Synchronization Trigger rate testing Readout Data rate testing Bit-Error-Rate testing - Need long term test ( hrs) Overall Trigger Signal Latency ~ 2.3us (Without GTP and TS) Readout Controller Capable of 110MB/s - Testing shows we are well within limits