MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM Toolset Interfaces with Authoritative Technical Data
1 AIM/CPM Pilot Project Status Report 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Roy Hoyt & Leslie Desenburg, NETC N74.
Authoring Instructional Materials (AIM)
Yvan Rooseleer – BiASC – MAY 2013
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1. Report status of traditional and modernized AIM
Mechatronics: An On-Boarding Corporate Training Example Jay Bouis Coordinator of Technical Training The Community College of Baltimore County Penny Jung.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
Instructional System Design
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
© Copyright 2011 John Wiley & Sons, Inc.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Yanling Sun, Ph.D. Senior Instructional Coordinator Technology Training and Integration ADDIE: A Guide for Designing Online Courses Summer Symposium for.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
CiNet CONFIDENTIAL Online Training, Certification and Compliance for your workplace.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Block Learning / Ready Relevant Learning and
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Staff development for technology- enhanced learning and assessment an institutional overview Carol Russell.
Software Development Process
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Presentation transcript:

MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator

Topics MT Continuum (MTC) Overview Project Status MTC Components MTC Integration Tasks Learning Community Applicability Lessons Learned

Background Strategic Systems Programs (SSP) re-engineering Missile Technicians (MT’s) 30+ week training pipeline: – Blended just-enough/just-in-time ILE-conformant content – Instructor Led (ILT) and Interactive Multimedia Instruction (IMI) sections – Delivered, tracked, and assessed through LMS – Training via both afloat and ashore LMS’ AIM CPM and LO Module toolsets are part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms

MT Continuum Team SSP - Requirements Owners, Afloat Training Capability Contractor Team – ILT development, IMI Storyboard development, SME’s NAWCTSD / AIM team - CPM/LO Module support NUWC – MTC Lead System Integrator, LMS (Seaware) LSI, Inc. – ISD and IMI design/development; integration tool development Chenega Logistics, LLC – CM/QA agent for SSP SLC –CCA for all MT curriculum Fleet – SME’s/Management of training afloat

Project Status Plan, Analyze & Design Phases Completed – Delivery Method Analysis Process still needed – Scientific/Justifiable/Repeatable Development fully underway. Development effort is progressing on schedule – Assessment, Performance Testing (NAVEDTRA 132) Large emphases on Implementation, Evaluation and Maintenance – Versioning, LMS interface Ongoing integration of CPM/LO Module, IMI toolset, PC simulation toolset, and LMS for planning, analysis, design, development, implementation, evaluation, and maintenance of blended content

MT Continuum Technical & Schedule Integration MTC development spans from the JDTA’s to the delivery and maintenance of training and test assessment material to students afloat and ashore MTC Lead System Integrator (NUWC) – Coordinates technical and schedule activities between and among developers, relative to the training and assessment delivery and maintenance goals of the MTC

MT Continuum Components Plan/Analyze – CPM (JDTA/TPP/TCCD) Design – CPM (COI) – LO Module (final design of ILT/preliminary design of IMI) Develop – LO Module (complete for ILT and test items) – Venus.net IMI toolset (complete for IMI and assessment Sections) – VIPr (PC simulation scenarios for ILT and IMI) – Content Packaging Tool (CPT) (provides sequencing and navigation of an AIM-based blended training solution for use in a SCORM- conformant LMS (Seaware))

Content Packaging Tool (CPT) AIM Staged Content AIM Course Package (SCORM Export) Content Packaging Tool (CPT) AIM LMS CPT Package Package Requiring Update IMI ILT The CPT Package provides both the runtime package for the LMS and the AIM re-ingestion package for content surveillance.

MT Continuum Components (contd) Implement – Training content includes assessment items – Seaware LMS (ILT/IMI/assessment delivery and tracking) Evaluate – Seaware LMS (student testing /test item analysis) Maintain – LO Module/Venus.net (integrated surveillance/update of ILT/IMI/test items)

MT Continuum Integration Tasks LMS Interfaces – Interface specification with LO Module and VIPr (JHU APL) – NUWC Newport lead with inputs from PPC (Chenega Logistics), ISD/IMI developer (LSI), and AIM team (AIMEREON) Content Packaging Tool (CPT) – Ongoing development by LSI with support from NUWC Newport Seaware LMS team, PPC, and AIM team (AIMEREON) Classroom Control Software (CCS)

Learning Community Applicability Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development (NAVEDTRA 137) Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections including versioning Design of IMI lessons/sections as well as definition of new JDTA/LO Module versioning concepts Integration of PC Simulation toolset with LO Module

Learning Community Applicability (contd) Bi-directional interface between LO Module and IMI toolset for integrated IMI / assessment development / maintenance Development of ILT and IMI test items and output to IMI toolset for aggregation into LMS-delivered Lesson-level assessments Sections, including enhanced performance test item development LMS delivery and tracking of integrated ILT / IMI / assessment content Integrated surveillance and maintenance environment for blended (ILT/IMI/test item) SCORM NAVEDTRA 136- compliant learning content

Learning Community Applicability (contd) Role of MT Continuum to ‘Big Navy’ future training – Training 2020 study group following MTC as one of two major prototypes under new Fleet Forces Command team leadership OPNAV Fleet Forces Command

Lessons Learned JDTA – Foundation. Getting this right cannot be over- emphasized. Maturity of Design Documents and Processes – IMDP, Learning Objectives (ISD Considerations), Process Documents, Assessment Design, Time to Train Estimations, Delivery Method Analysis Early definition of detailed blended content structure and ILT/IMI delivery implementation – Delivery interface specification – ILT/electronic classroom delivery

Questions?