USS Abraham Lincoln CVN-72 Everett, WA 9-8-2007 preparing for next cruise < 20mm Phalanx CIWS MK29 Sea Sparrow SAM Launcher > A private tour with Vern.

Slides:



Advertisements
Similar presentations
U.S. Navy photo by PH3(AW/SW) Jayme Pastoric. January 27, The afterburners of planes attached to Carrier Air Wing Nine (CVW-9) launching from the.
Advertisements

Inspected in port Shanghai from 26th to 28th Sept by NCL
Choose a path to finish the story.  You are a young sailor that has been assigned on the USS Arizona. It is a Sunday morning and your friends ask you.
SPC-LE SPEC’S NAV & PILOTING SPC-LE.
USS CLEVELAND (LPD 7) July Vern’s cruise on (LPD) Amphibious Transport Dock.
Module 2: General Working Conditions 2.2 Working Surfaces Susan Harwood Grant Number SH F-23.
Access Road Stern Bow Suggested lay down area. Looking from bow down port side of vessel to the stern Non detect, clean overburden.
Adelija Čulić-Viskota
Essential reading: SPINČIĆ, A., An English Textbook For Marine Engineers I., Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička vježbenica.
December Everett, WA On Tour, Vern was accompanied by friend Captain Ron Miller and escorted by MSCREP SEATTLE director Bruce Leach Jr. and Steve.
Military Time and Shipboard Terminology
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
General Arrangement Plan
General Arrangement Plan
Part 2 of MS302 Tour for Arts and General Science Spring 1962.
SHIPBREAKING Module 1: Introduction to Shipbreaking 1.2 Types of Vessels Susan Harwood Grant Number SH F-23.
A cross-section of Rainier at stations 3 and 4 looks something like this - looking aft. Fuel for Station No. 3 is pumped from the tanks below; to ships.
As the full moon sets, the tug sailors get to work!
View from the bridge wing in the drydock of open cargo holds forward.
Take Off!!! Rosny Daniel Daniel Pappalardo Nadeline Rabot.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
SHIP NOMENCLATURE. DO NOW  In the United States, we commonly use the English system of measuring length & distance (feet, inches, miles…).  In most.
Copyright Coast Guard Auxiliary Association, Inc.
Terms you need to know on the water!
General sea terms.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
Standard 4: Objective 3 Modes of Transportation Cruises.
General Arrangement Plan
BOATING BASICS MR. O TRANSPORTATION.
Naval Sea Power.
MARITIME SCHOOL ASSESMENT PROGRAM REVIEW
1 “ U.S. Aids to Navigation – Road Signs of the Waterways”
ABL-8 AbleAnchoring Instructors: George Crowl. Course Outline (1)  a. Describe the various kinds of anchor rode and the advantages and disadvantages.
ABL-7 Able Boat Handling Instructors: George Crowl.
JYian NCC Nautical Knowledge. Materials Needed One Plastic File –To Store All Notes (Ring File) Foolscap Papers –To Take Down Notes –Printed notes will.
Who was the Love Boat’s Captain?. Captain Merrill Stubing.
KEEP THE SHIPS AFLOT BY USING YOUR KNOWLEDGE OF SEA TERM KNOWLEDGE. Click here to move on.
USNS RAINIER TAOE-7 The Bridge Area A report of Vern’s visit on December 14, 2009 in Everett, Washington Notice: There are 17 square windows across the.
Diesel Fuel - Fill Place all spill safety equipment where needed
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
It takes many people to keep trains running. The Engineer keeps the train going.
Fwd. Anchor Windlass / Capstan
What Makes Up a Ship?.
10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Boat Parts.
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
Sail Course ® Section 18, Storm Conditions. Sail Course ® Figure 18–1 Heaving To.
1 Chapter 4 Operating Your Vessel...Safely 2 Operating Your Vessel…Safely Loading gear and passengers Boat Handling Courtesy on the water Casting off.
Coolant Fill Coolant Check and Fill. Oil Fill & Dip Stick Main Engine Oil Fill Dip Stick Delo 400 – 40 wt. Engine Oil.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Module 5: Operations & Hot Work 5.3 Hot Work, Permits, and Inspections Susan Harwood Grant Number SH F-23.
Out There Vocabulary. Boat Directions Starboard: left side Port: Left side Stern: Back Bow: Front.
{ NAUTICAL TERMINOLOGY Titanic Unit for Seventh Grade.
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
Towing Guidelines After the initial size up, if it is safe, towing abreast allows for the most control for the towing vessel. Coming alongside and capturing.
Marine Kit - 1 Shipyard Operations
Physical Characteristics
Module 3 – Naval Skills Unit 3 - Basic Seamanship
Copyright Coast Guard Auxiliary Association, Inc.
Nautical terms AND MORE….
Teknologi Dan Rekayasa
Mooring operation at Strömmen
Mooring operation at Strömmen
7 K NU NCC, ERNAKULAM MAIN PARTS OF A SHIP.
Joint ACCESS: Amphibious Combat Cargo Expeditionary Support Ship
Terms you need to know on the water!
Seamanship: Sea Terms SCC_SM_SeaTerms_P
Mooring operation at Strömmen
Presentation transcript:

USS Abraham Lincoln CVN-72 Everett, WA preparing for next cruise < 20mm Phalanx CIWS MK29 Sea Sparrow SAM Launcher > A private tour with Vern and his son

It was a long climb up to the Bridge, 11 decks above the hanger deck.

View from BRIDGE There is a small boat barricade all around l l v

BRIDGE is inside here ALONG SIDE CONTROL View Barricade

Bryan ALONG SIDE CONTROL

MK29 Sea Sparrow SAM Launcher V STERN – STARBOARD AREA

STERN REFULING STATION RIGGED FOR OFF LOADING

IN PORT UTILITY CONNECTIONS

MAIN FUELING STATION <- DOUBLE PROBE RECEIVER This area is straight below Along Side Control

Vern and Bryan make it to the Flight Deck These blue tanks hold water being used to remove old flight deck surface. You can see newly placed surface tight next to the Island.

CATAPULT There are 4 Catapults, all running forward.

HANGER DECK There is gear all over the place

TAIL HOOK DEVICE Cable is removed during deck work

Cable is the width of two fingers

Tail Hook CABLES LANDING CONTROL STATION

Personal storage under mattress - >

< Chain to Anchor Passage ANCHOR ROOM IN BOW OF SHIP

CHAIN PASSAGE

WORLD WAR II ART WORK ON ANCHOR CAPSTAN A Show place for tour guides