Tracker SSD Ladder Preproduction Review Alessandro Brez Robert Johnson.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
Quality Management System
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
1 Inspection and Testing Approved for Public Release.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Pollution Prevention Toyota Industrial Equipment Mfg., Inc. December 7, 2011.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Important informations
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
Visit us at E mail: Tele:
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Procedure for MCM rework on tray MID 070
GLAST Large Area Telescope:
THEMIS Mission Assurance
ISUAL Product Assurance
Preproduction Status & Results
Peer Review Agenda (Suggested).
FNAL Production Experience
Inspection and Testing
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mattias Skafar Head of Quality Division
GLAST Large Area Telescope:
PSS verification and validation
DOE Review of the LCLS Project October 2006
Presentation transcript:

Tracker SSD Ladder Preproduction Review Alessandro Brez Robert Johnson

September 12, 2002SSD Ladder Preproduction Review2 Flight Ladder Design Status The design is complete and nearly identical to what was successfully used in the BTEM. –Greatly improved tooling and equipment for fast production, better reliability, better yield, and better alignment. –Improved encapsulation material, equipment, and procedure. –Assembly by a commercial vendor. Drawing package: released assembly drawing LAT-DS- 594 and SSD drawing, LAT-DS-26. No formal CDR has been held for the ladders, but there is not much to the “design” to be reviewed. The single drawing has been reviewed and signed off. A CDR was held for the SSDs. Assembly tooling: design, drawings, manufacturing, and testing is complete, but the drawings are not in Cyberdocs and are not under configuration control.

September 12, 2002SSD Ladder Preproduction Review3 Requirements Level-III, LAT-SS-17, released. –5.3.1: Converter-sensor spacing. This flows down to the 2mm gap between trays and to the wire-bond and encapsulation height limits (250 microns and 500 microns respectively) together with allowances for vibration amplitude (tray stiffness). –5.7: Charge particle detection, >98% in detection volume. This implies much less than 2% bad strips in completed ladders, which is easily satisfied by the SSD production and ladder assembly. Level-IV Mechanical, LAT-SS-134, not released. – : SSD configuration – : SSD ladder stay-clear – : SSD ladder alignment

September 12, 2002SSD Ladder Preproduction Review4 Requirements –Tolerance stack-up required in production: SSD dicing tolerance <20 microns (LAT-DS-11, SSD spec) SSD alignment in ladders: maximum deviation <40 microns –5.3.10: Wire-bond encapsulation Level-IV Electrical: LAT-SS-152, not released, and the SSD spec, LAT-SS-11. –Satisfaction of electrical requirements such as leakage current and depletion voltage is ensured by requiring the ladder to satisfy the same requirements as a set of four unassembled SSDs.

September 12, 2002SSD Ladder Preproduction Review5 Production Plan Two assembly vendors: G&A Engineering and Mipot. –Only G&A is being certified now to begin production. The EM prototypes were assembled there. –Production at Mipot will begin several months later, after separate review. SSDs are received and tested at INFN institutes (already in progress), according to LAT-PS-527. They are then shipped to the assembly vendor. INFN personnel handle all of the electrical testing activities on the vendor’s premises and therefore have continual close supervision of the assembly process. P3 schedule: September ’02 through May ’03, to assemble about 2800 ladders. The completion date will move to September ‘03 due to the SSD production schedule.

September 12, 2002SSD Ladder Preproduction Review6 Production Flow WS5 will not be Needed in the flight production

September 12, 2002SSD Ladder Preproduction Review7 Tooling: Edge Bonding Mechanical references Piston s Vacuum chucks

September 12, 2002SSD Ladder Preproduction Review8 Adhesive Application to SSD Edge

September 12, 2002SSD Ladder Preproduction Review9 Wire-Bonding, Testing, Encapsulation

September 12, 2002SSD Ladder Preproduction Review10 Encapsulation Inspection

September 12, 2002SSD Ladder Preproduction Review11 Storage Box and Vacuum Tool Antistatic foam lining

September 12, 2002SSD Ladder Preproduction Review12 Electrical Tests: IV and CV Verifies leakage current and depletion voltage after ladder assembly. Leakage current is very sensitive to nearly any possible kind of damage to the SSDs.

September 12, 2002SSD Ladder Preproduction Review13 Electrical Tests: AC Strips Measure current vs time as the strip charges –Short time constant indicates missing wire-bond connection –Long time constant indicates shorts to neighboring strips –High DC current indicates a broken coupling capacitor Frequent broken capacitors or missing bonds could indicate a problem with wire-bonder settings

September 12, 2002SSD Ladder Preproduction Review14 AC Test Examples Pink=good Blue=short Pink=good Blue=open Pink=good Blue=broken cap

September 12, 2002SSD Ladder Preproduction Review15 Preproduction Results EM mechanical dummy ladders: see LAT-TD-879 Only one ladder falls slightly outside of the specification.

September 12, 2002SSD Ladder Preproduction Review16 Preproduction Results EM functional ladders: see LAT-TD-880 Accurate dicing of HPK SSDs gives ladders with even better alignment.

September 12, 2002SSD Ladder Preproduction Review17 Preproduction Results Bond thickness between wafers. Note that this bond serves no mechanical purpose after the ladders are bonded to the trays.

September 12, 2002SSD Ladder Preproduction Review18 Preproduction Results On average a factor of 1.8 increase in leakage current results from the ladder assembly. Still well within our electronics requirements, since the new SSD leakage current is so low. Wafer 23 had anomalously high leakage from contamination. Wafers are now cleaned prior to assembly, when necessary, and the SSD packaging has been improved. Ladder leakage current at 150V (red) compared with the sum of the leakage currents of the relative SSDs (green).

September 12, 2002SSD Ladder Preproduction Review19 Preproduction Results Depletion voltage of the ladders (red squares) and average values of the depletion voltages of the SSDs from which each ladder was made (green line).

September 12, 2002SSD Ladder Preproduction Review20 Preproduction Results AC strip tests after wire bonding and after encapsulation: –<0.02% of strips were damaged during assembly. –Encapsulation causes no damage or current leakage.

September 12, 2002SSD Ladder Preproduction Review21 Preproduction Results Effect of encapsulation on the leakage current of three ladders.

September 12, 2002SSD Ladder Preproduction Review22 Preproduction Results Monitoring for 3 weeks of the effect of the encapsulation material on leakage current of an HPK detector.

September 12, 2002SSD Ladder Preproduction Review23 Parts and Materials ItemMaterialPart Number or LAT Drawing Manufacturer Silicon Strip DetectorHigh resistivity SiLAT-DS-00026Hamamatsu Photonics Wire for wire bonding, 25  m diameter 99% Al, 1.0% Si Adhesive for edge bonding SSDs epoxyScotch-Weld 2216 B/A Gray 3M Adhesive for encapsulation dam silicone3145 RTVDow Corning Adhesive for encapsulation fill silicone615 RTVGeneral Electric Problem with the dam and fill RTV: outgassing specifications can only be met after a bakeout, which is not feasible. We plan to investigate and test two Nusil products (CV 2500 and CV 1142), which pass specifications at room temperature.

September 12, 2002SSD Ladder Preproduction Review24 Supporting Documentation See the Tracker web page for all documents. LAT-PS-527: SSD receiving & inspection procedures. LAT-PS-635: Ladder assembly procedure, parts, equipment, certification, requirements, etc. LAT-PS-891: Ladder nonconforming product procedure. LAT-TD-914: Ladder database and electronic traveler. LAT-TD-879: Results from EM dummy ladder production. LAT-TD-880: Results from EM functional ladder production. LAT-DS-594: Ladder assembly drawing. LAT-SS-172: Tracker mechanical parts and materials list.

September 12, 2002SSD Ladder Preproduction Review25 Certifications G&A: –ISO 9001, Quality Control –ISO 14001, Environmental Management –OHSMS, Occupational Health and Safety Personnel?

September 12, 2002SSD Ladder Preproduction Review26 Equipment at G&A DeviceManufacturer & ModelCalibration Coordinate Measuring Machine Mytotoio ATEX Periodical calibration by Mytutoio Italy, daily check on reference sphere Automated wedge wire bonder Delvotec 6400Destructive pull tests on 10 bonds on cutoff Wire-bond pullerWestbondPeriodic calibration by supplier Adhesive dispensingCamalotN/A Probe StationPA200N/A CV testsAgilent 4284A LCR meter See LAT-PS-635 IV testsKeithley 2410 Source Meter See LAT-PS-635

September 12, 2002SSD Ladder Preproduction Review27 QC Provisions Hardware Traveler –Integrated with the database entry. See LAT-TD-914. –Database is supplied to G&A with SSD info already entered, including which SSD goes where, etc. –Each work station has a PS with database access. –Each working stage has a database form on which steps are checked off and data entered. –All relevant data and “as- built” info are captured in the database. –MS Access software. –Remote monitoring. Oversight –Trained INFN personnel do all electrical testing and final acceptance. –The testing does not lag the production by more than one day. –INFN Performance and Safety Assurance Manager makes all decisions regarding disposition of ladders set aside during production. –Trained INFN personnel are on site during all production, for continuous oversight.

September 12, 2002SSD Ladder Preproduction Review28 QC Provisions Non-Conformance Reporting –See LAT-PS-891 –All instances of non- conformance are logged in the database. –Actions include Retesting. Production halt for recalibration and tuning of wire-bonding, etc. Ladder rejection (by INFN PSAM) –Marginal ladders can be kept, with their usage determined at the tray assembly stage. ESD Protection –SSDs are ESD sensitive (although not anywhere close to the sensitivity of CMOS gates) –40% to 50% humidity –Conductive gloves –Grounded wrist bands –Grounded tools and machines –NASA-STD

September 12, 2002SSD Ladder Preproduction Review29 QC Provisions Environmental Control –Class 100,000 or better clean room –ISO certification –20°C to 25°C –40% to 50% humidity –Latex gloves, overshoes, hat, and disposable lab coat at all times –Face mask during specified procedures SSD Handling –Clean antistatic gloves for unpacking and for adhesive application. –4-point vacuum tool for ladder handling. Clean suction tips. –Face mask when working with an exposed SSD. –TX4025 ESD Wipes are used to protect both sides of the SSDs during storage.

September 12, 2002SSD Ladder Preproduction Review30 Requested Items Production plan and flow diagramLAT-PS-635 Qualification/Environmental Test Plans and Test Flow See LAT-TD-879 and LAT-TD-880 for completed testing of ladders. Production Quality Control PlanLAT-PS-635 Inspection and measurement documentation plan LAT-DS-635 and LAT-DS-914. Plans for handling, shipping containers, environmental control and mode of transportation, identification, and storage LAT-PS-527 and LAT-PS-635. Mode of transportation for SSDs? Most ladders can remain at assembly vendor.

September 12, 2002SSD Ladder Preproduction Review31 Requested Items Traceability Plan for all flight hardware Tracker database: LAT-TD-384 and LAT-TD-914. Production ScheduleLAT P3 schedule. Closure of Actions from the Previous Reviews None Complete drawing package approved for production LAT-DS-26 and LAT-DS-594 are the flight articles. The assembly fixture drawings are only in Italy. Subsystem Specification Complete & Under CM No, only the level-3 document is under CM. Level-4, LAT-SS-134 is not released.

September 12, 2002SSD Ladder Preproduction Review32 Requested Items Complete fabrication, test, and assembly procedures LAT-PS-635 Complete analyses of production tooling and test equipment The tooling and equipment are all at G&A and have been tested. Analyses?? Certification of all flight hardware, production tooling and test equipment Vendor certifications are listed in LAT-PS-635. Certification of test equipment? LAT certification?? Marsh and Virmani have visited G&A and Mipot. Control methods for all safety hazards No unusual hazards known. Vendor is responsible for its workforce and has EH&S certification.

September 12, 2002SSD Ladder Preproduction Review33 Requested Items Interface Control requirements Not relevant to ladder assembly MaterialsSee LAT-PS-635 and LAT-SS- 172 Equipment identification and certification Equipment is identified in LAT- PS-635. Certification? Personnel identification and certification ?? LeadershipAlessandro Brez Contingency Plans?? Risk Assessment, mitigation, and recovery plans ??