Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages: StrasbourgNantesWarsaw
Star Week 6-10 Frb 2002SSD Status Report 2# Main components | | < 1.2 Ø= 460 mm z = 740 m r = 20 m 20 ladders 320 2D Si strips channels Readout < 5ms
Star Week 6-10 Frb 2002SSD Status Report 3# Production/test status Si wafers440Completed/Tested FEE5000Completed/Tested TAB-FEE5000Started (500) Hybrid800Started (100) Module400Starts in March (20) Ladder23Started (1) ElecBoard s 100Started (4) o Production mainly in industry o Design, test & ladder assembly in labs
Star Week 6-10 Frb 2002SSD Status Report 4# Utilities status Production db: operational Slow Control: almost done Online + db: bits and pieces Offline hit reco: completed Trigger: in progress DAQ: in progress Power: ready Cooling: ready
Star Week 6-10 Frb 2002SSD Status Report 5# Ladder assembly bench
Star Week 6-10 Frb 2002SSD Status Report 6# First ladder: pictures Produced: december 01
Star Week 6-10 Frb 2002SSD Status Report 7# First ladder: results Pulse from internal generator readout FEE dead pedestal strip number P side N side 16 modules are working !
Star Week 6-10 Frb 2002SSD Status Report 8# First ladder: test results o S/N ~ in module beam test o Good 2D matching
Star Week 6-10 Frb 2002SSD Status Report 9# Schedule Module production starts o March Ladder assembly starts o April 3 ladders on dedicated support o May Delivery at BNL o June Installation in STAR o End of June 1st ladder operational
Star Week 6-10 Frb 2002SSD Status Report 10# Production database
Star Week 6-10 Frb 2002SSD Status Report 11# Pictures: a module
Star Week 6-10 Frb 2002SSD Status Report 12# First ladder: results
Star Week 6-10 Frb 2002SSD Status Report 13# First ladder: results
Star Week 6-10 Frb 2002SSD Status Report 14# Ladder test bench
Star Week 6-10 Frb 2002SSD Status Report 15# Module test bench
Star Week 6-10 Frb 2002SSD Status Report 16# Simulated performances
Star Week 6-10 Frb 2002SSD Status Report 17# Simulated performances
Star Week 6-10 Frb 2002SSD Status Report 18# Radiation length ElementsX/X 0 % Si sensor0.32 FEE support (hybrid)0.29 FEE0.07 Connections0.26 Mechanical structure0.17 TOTAL1.11