Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages: www.star.in2p3.fr.

Slides:



Advertisements
Similar presentations
The STAR Heavy Flavor Tracker Flemming Videbæk For the STAR collaboration Brookhaven National Lab 1.
Advertisements

T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Test of the SSD Electronics for the STAR HFT Upgrade Howard Matis - LBNL 1SLAC ESTB Workshop – March 2011.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
1 TPC online  offline calibration November 2002.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
ALICE Si-FMD,T0,V0 26/ Jens Jørgen Gaardhøje, NBI, Si-FMD oUpdate on Status oConceptual design of FEE and BEE-DAQ chain oTimetable.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
HFT face-2-face F.Videbaek Brookhaven National Lab.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
NIKHEF –D0 meeting, June 6, 2001 Freya Blekman, NIKHEF Amsterdam SMT pedestal management Weekly NIKHEF – NIJMEGEN – D0 meeting June 6, 2001 Freya Blekman.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
17 december 2003 Gert-Jan Nooren december 2003 Gert-Jan Nooren 2 ITS SSD in 2003.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Ssd simulation status : preparation for embedding Jonathan Bouchet Svt Meeting : 09/19.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
Work progress in Turin x the MVD
SiTRA multipurpose and standalone test infrastructure
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
SIT AND FTD DESIGN FOR ILD
Radiation Laboratory Meeting
Technische Universität München
HL-LHC upgrade at IPHC news
Presentation transcript:

Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages: StrasbourgNantesWarsaw

Star Week 6-10 Frb 2002SSD Status Report 2# Main components |  | < 1.2 Ø= 460 mm  z = 740  m  r  = 20  m 20 ladders 320 2D Si strips channels Readout < 5ms

Star Week 6-10 Frb 2002SSD Status Report 3# Production/test status Si wafers440Completed/Tested FEE5000Completed/Tested TAB-FEE5000Started (500) Hybrid800Started (100) Module400Starts in March (20) Ladder23Started (1) ElecBoard s 100Started (4) o Production mainly in industry o Design, test & ladder assembly in labs

Star Week 6-10 Frb 2002SSD Status Report 4# Utilities status Production db: operational Slow Control: almost done Online + db: bits and pieces Offline hit reco: completed Trigger: in progress DAQ: in progress Power: ready Cooling: ready

Star Week 6-10 Frb 2002SSD Status Report 5# Ladder assembly bench

Star Week 6-10 Frb 2002SSD Status Report 6# First ladder: pictures Produced: december 01

Star Week 6-10 Frb 2002SSD Status Report 7# First ladder: results Pulse from internal generator readout FEE dead pedestal strip number P side N side 16 modules are working !

Star Week 6-10 Frb 2002SSD Status Report 8# First ladder: test results o S/N ~ in module beam test o Good 2D matching

Star Week 6-10 Frb 2002SSD Status Report 9# Schedule Module production starts o March Ladder assembly starts o April 3 ladders on dedicated support o May Delivery at BNL o June Installation in STAR o End of June 1st ladder operational

Star Week 6-10 Frb 2002SSD Status Report 10# Production database

Star Week 6-10 Frb 2002SSD Status Report 11# Pictures: a module

Star Week 6-10 Frb 2002SSD Status Report 12# First ladder: results

Star Week 6-10 Frb 2002SSD Status Report 13# First ladder: results

Star Week 6-10 Frb 2002SSD Status Report 14# Ladder test bench

Star Week 6-10 Frb 2002SSD Status Report 15# Module test bench

Star Week 6-10 Frb 2002SSD Status Report 16# Simulated performances

Star Week 6-10 Frb 2002SSD Status Report 17# Simulated performances

Star Week 6-10 Frb 2002SSD Status Report 18# Radiation length ElementsX/X 0 % Si sensor0.32 FEE support (hybrid)0.29 FEE0.07 Connections0.26 Mechanical structure0.17 TOTAL1.11