SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.

Slides:



Advertisements
Similar presentations
Jim McElwain College Architect SETTING UP A LABORATORY.
Advertisements

The Cryopit Fraser Duncan Cryopit Workshop 16 August 2011.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
DECEMBER 18, 2014 RUSD MAINTENANCE AND OPERATIONS.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Double Beta Decay Neodymium, a rare earth element, will be added to the liquid scintillator in SNO+ (at 0.1% by weight). This will enable a search for.
Heeger theta13, May A Neutrino Project at Diablo Canyon.
Underground Facilities Stub 2 Stub 2a,3 ‘H’ Area JIF Area The underground research facilities have evolved since dark matter studies began at Boulby. There.
Samantha Kuula Interactions May 2012 SNOLAB Science and Impact Samantha Kuula SNOLAB Communications Officer Samantha Kuula SNOLAB Communications Officer.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Jess Albino FAC CF April 16, 2007 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities Jess.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
DARK 2007 SydneySept 28 th,2007Page 1 Knowing the Universe from a Hole in the Ground Particle-Astrophysics Research at SNO & SNOLab T. Noble, Queen’s University.
Welcome to SNOLAB David Sinclair. Welcome to our new Building Note – Building is still under construction Note – Building is still under construction.
SNOLAB – An International Facility for Underground Science Expand underground space to allow several experiments to operate simultaneously Provide a surface.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Status of SNOLAB Development Fraser Duncan SNOLAB Workshop 4 Oct 2008.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
Andrew Hime Physics Division, LANL e-e- e-e- e SNOLAB Scientific Development Andrew Hime Physics Division, Los Alamos National Laboratory SNOLAB Workshop.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Eun-Ju Jeon Sejong Univ. Sept. 09, 2010 Status of RENO Experiment Neutrino Oscillation Workshop (NOW 2010) September 4-11, 2010, Otranto, Lecce, Italy.
GeoNeutrino 2008 Sudbury Sept 18 th, 2008 SNOLAB: A New International Facility for Underground Astroparticle Physics T. Noble Queen’s University.
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Recommendations for Science at SNOLAB Andrew Hime On behalf of the Experiment Advisory Committee Aug. 17, 2005 SNOLAB Surface Building.
Outstanding Issues on Infrastructure and Development Fraser Duncan SNOLAB/Queen’s University 4 th SNOLAB Workshop 15 August 2005.
Harry Nelson UCSB HUSEP Ft. Collins Nov. 19, 2005 Lower Campus.
Tony Noble Queen’s University Development of the SNOLAB Scientific Program.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
Monthly Management Report Submitted By Facility Management Team
Andrew Hime Physics Division, Los Alamos National Laboratory Workshop on Low-Radioactivity Techniques Laurentian University, Sudbury, Ontario, Canada.
APS April meeting Jacksonville, 2007 WIMP Search With SNOLAB Chris Jillings SNOLAB Staff Scientist For the DEAP-1 Collaboration.
A large water shield for dark matter, double beta decay and low background screening. T. Shutt - Case R. Gaitskell - Brown.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Construction and Development Status SNOLAB Workshop V 21 August 2006 Fraser Duncan.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
LoNu Workshop R. B. Vogelaar October 14, 2006 Extraordinary Neutrino Beam Free of Charge For NEUTRINO PHYSICS: WELL DEFINED HIGHEST FLUX (~10 11 cm -2.
Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
The Daya Bay Reactor Neutrino Experiment R. D. McKeown Caltech On Behalf of the Daya Bay Collaboration CIPANP 2009.
CTF at Gran Sasso (overview of the hardware) Richard Ford (SNOLAB) (who has not been in the collaboration since 2004) March 19 th 2010.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Use of large volume scintillator at SNOLAB Richard Ford (SNOLAB, Sudbury) DUSEL scintillator meeting August 10 th 2006, Fermilab, Chicago
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Neutron Shield/Muon Veto (WBS 1.3) and Underground Installation Issues (WBS 1.6) May 11, 2009 Erik Ramberg.
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Radon Reduced Air and SNOLAB Aksel Hallin Queen’s University August, 2006.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
SNOLAB Science & Scientific Development Andrew Hime On behalf of the Experiment Advisory Committee Aug. 15, 2005 SNOLAB Surface Building.
City of Gainesville Facilities Management Department Citizen’s Academy April, 2016.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Foundations of Technology Construction
CBETA Technical Review
EHN1 Extension planning
(Refer to Chapter 2 of the textbook)
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Accelerator Module Test Facility
Carleton College Summer 2018 Science and Campus Construction Plan
Foundations of Technology Construction
Onsite Training at JLab
Presentation transcript:

SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009

2km overburden (6000mwe) ‏ Underground Laboratory Surface Facility Muon Flux = 0.27/m 2 /day MEI & HIME astro/ph

The SNOLAB Expansion SNO Cavern Cube Hall Cryopit Ladder Labs Personnel Area Utility Area

Laboratory Space All clean spaces to be operated as Class 2000 clean room. SNOLAB Workshop 27,28 Aug 2009Fraser Duncan

Status Since last workshop in October 2008  Chiller and sewage treatment plant went operational in Dec 08  Commissioned HVAC in all new areas.  Rough cleaned and painted Ladder Labs.  Relocated personnel area to new refuge station 3 Feb 09.  Transitioned to clean room conditions in Ladder Labs 5 Aug 09.  Last major Contractor work: Concrete floor in “TAC” drift outside Cryopit; 5 T Monorail beam in Cryopit. Continuing operation of the PICASSO and DEAP-1 Dark Matter Search experiments and the PUPS seismology station. Fraser DuncanSNOLAB Workshop 27,28 Aug 2009

Chiller

Lunch Room Occupied New Personnel Facilities 3 Feb 2009

Lunch Room

Meeting Room

Cryopit Access

Cryopit Access

Cryopit

Cube Hall

Cube Hall

Unsealing door to Ladder Labs

Ladder Labs

Construction Status With the “going clean” of the Ladder Labs there is now 40,000 ft 2 (3,700 m 2 ) of space inside the clean room boundary of the lab. For comparison the surface building is 32,000 ft 2. However the Ladder Labs still require a “fine clean” to bring them to clean room conditions. Fraser DuncanSNOLAB Workshop 27,28 Aug 2009

Facility Construction Schedule Contractor work almost done (still some “building automation” and fire alarm tasks). Remaining work will be done primarily by SNOLAB personnel (with contractors as necessary). Next facility construction activities:  Fine cleaning of Ladder Labs  Installation of services (plumbing, electrical) in Ladder Labs and Cube Hall.  Cryopit: prepare and paint.  Renovation of old Personnel Area (reclaim for experiments or infrastructure). Fraser DuncanSNOLAB Workshop 27,28 Aug 2009

Experiment Installation Cube Hall  Installation of steel work for DEAP-3600 and MiniCLEAN this fall. Contract awarded, construction to begin in September. Will go clean after civil work is complete. SNO Cavity  Repairs to cavity liner and modification of detector support to hold down the Acrylic Vessel for liquid scintillator. SNO Utility Room  Excavation of pit for liquid scintillator purification system. Other  Work as necessary for other experiments such as HALO and PICASSO. Fraser DuncanSNOLAB Workshop 27,28 Aug 2009

Facility Personnel Nominal staff of ~40 including scientists, engineers, technicians, cleaners, admin, IT. New Hires  Project Engineer, Tom O'Malley (started 4 Aug) ‏ Will be working on installations for DEAP-3600, MiniCLEAN, SNO+ and others.  Process Systems Engineer, Allan Barr (starts 31 Aug). Will be maintaining the SNOLAB Ultra Pure Water Systems as well as participating in the installation and operation of the SNO+ liquid scintillator process systems. Fraser DuncanSNOLAB Workshop 27,28 Aug 2009

Major laboratory construction complete. Most spaces now under clean room conditions. Now preparing for the Day 1 experiments  Civil work in Cube Hall starts next month. Summary Time to do some (more) science.

End