Removing Roadblocks in Generation – Towards 24 Hour Power Supply Association of Power Producers 19 Dec 2011.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
DEVELOPMENT OF ULTRA MEGA POWER PROJECTS A MAJOR INITIATIVE UNDER POWER SECTOR REFORM Director (Projects) Power Finance Corporation Ltd. Chairman Sasan.
Barriers to Adoption of Clean and Efficient Technologies in the Indian Power Sector: An Analysis Using AHP Anoop Singh, S. C. Srivastava Indian Institute.
Indian gas regulatory framework: Industry issues.
Mini Grids in Asia Sameer Kalra Sept 30 th, 2010.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
…Message Box ( Arial, Font size 18 Bold) Presentation Title ( Arial, Font size 28 ) Date, Venue, etc..( Arial, Font size 18 ) Impact of Shortage of Coal.
Possible policy directions to ensure low cost power and fuel to Indian consumers Auctioning coal mining licenses can lead to lower power prices November.
Slide 1 of 11 Moving Towards Sustainable Power: Nudging Users and Suppliers with Policies, Technologies & Tariffs Ajay Mathur Bureau of Energy Efficiency.
Non-Tariff Barriers in the Trade of Transport Services – Final Report TPT 02/2002T Steering Committee on More Competitive Transportation (including infrastructure)
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Indian Coal Markets – Challenges and Future Outlook in context of Power Sector By Mr. Arun Bhalla Chief Executive- Power Business Development Shree Cement.
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
WORLD ENERGY INVESTMENT OUTLOOK
SOLAR ENERGY The Next Sunshine Sector. India’s Entrepreneurship Success has been based on the 3 stage mantra The Indian Growth Story Timely Entry 2000.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Rural Poverty and Hunger (MDG1) Kevin Cleaver Director of Agriculture and Rural Development November 2004.
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
Cheap Affordable Coal? Case Study: Tata Mundra Justin Guay, World Bank AGM, 2013.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Financing Access to Basic Utilities for All Mobilizing Finance: Zambian Experience Sam Gonga DTF.
Load shedding in Pakistan Reasons & Remedies February 9, 2009 By Muhammad Ziauddin.
Lakshman Wijeyewardena Director General Industrial Services Bureau Role of Business Development Service Providers – Implementation of Technology.
© ABB Engineering Services Energy Responding to the Challenge of Climate Change.
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
[Legislative] [Danish Policy] Energy 2000, Target to reduce CO2 emissions in 2005 by 20% compared to 1988 levels. Energy 21, Reinforce targets.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Indian Power Sector- Clean Coal Technologies V.S. VERMA MEMBER, CERC 1.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
How to Achieve Universal Modern Energy Access by 2030? Hisham Zerriffi (UBC) Shonali Pachauri (IIASA)
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Sanjeev Aggarwal Amplus Infrastructure Developers Private Limited Clearances and Land Acquisition for Coal Blocks Way Forward to Meet Demand of Coal.
The Tata Mundra Project. 2 Tata Mundra Project, India.
Divider custom What’s this layout for? Use this if you with to change the colour of the lines Sustainable Power – Unpacking the Buzz Word The world’s leading.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Challenges and Opportunities for Addressing Global Climate Change February 2006.
Cement Manufacturers’ Association Special Meeting of Standing Linkage Committee (Long Term) for Power, Sponge & Cement Sectors Emphasis on Supply of Domestic.
QUOTE “We live in a post war world. Today shooting wars are exception. But are we entering an era of Resource Wars?. And energy is the principal resource.
1 T HE R IGHT TO F AIR C OMPENSATION AND T RANSPARENCY IN L AND A CQUISITION, R EHABILITATION AND R ESETTLEMENT A CT,
Transmission Tariff V.Balaji Chief Manager SRLDC.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Discussion on Multi Year Tariff By Vivek Sharma & Manisha Kabra.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Adani Power Ltd. IPO meet key takeaways 21 July 2009.
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
Market aggregating models – scaling an EE portfolio
Adequacy of Renewable Energy Policies: A Preliminary Assessment
Damitha Kumarasinghe Director General
Financing of Solar power plants
20th India Power Forum 2017 “Sustainability of Power Business – Paradigm Shift for 24x7 Power for All” Session I: Power Generation Scenario by 2022 :
WATER REGULATORY AUTHORITY
The Electricity Distribution Industry
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Presentation transcript:

Removing Roadblocks in Generation – Towards 24 Hour Power Supply Association of Power Producers 19 Dec 2011

Several Initiatives to Improve Access of Electricity in Rural Areas Electricity Act 2003 and National Electricity Policy – decentralised distributed generation Rajiv Gandhi Grameen Vidyutikaran Yojana However, 56% of rural households and 400 million people without electricity access Per capita consumption of 778 kwh as compared to 2471 kwh of China Electrified rural areas get 6-8 hours of supply with poor quality of service 2 24 hours supply appears to be a distant dream as long as basic power generation issues are not tackled

Indian power sector is passing through a very critical phase and the current situation is the outcome of inaction on the part of the Govt and exuberance on part of some of the private players 3

The major bottlenecks are Fuel – shortage of domestic coal and pricing of imported coal and blended power Land Acquisition Issues Environmental Issues Poor Financial Health of Distribution Utilities 4

5 Installed Capacity (MW) Coal 62% Coal 65% Coal 63% Coal 59% Coal 54% Coal 55% Coal 62% Biggest Challenge Being Faced by Developers - Fuel Rest Coal has remained and is expected to remain the dominant fuel by far. With 74% of the 12 th Plan additions being based on coal, coal share of the total generation portfolio is expected to be 62% by the end of 2017

 Estimated domestic coal requirement for the power sector in FY 12 is 455 MT (as per CEA) and availability is around 402 MT (including all sources). Therefore the current deficit of coal is 53 MT for power sector in FY 12 leading to a stranded capacity of ~13000 MW Shortage of Domestic Coal 6 Looking at the fact that 74% of the 12 th Plan capacity addition (of 100,000 MW) is based on coal, it is estimated that the total coal deficit will be 292 MT by the end of 2017

 Case I linkage coal based projects – At the time of bidding, tariff quoted by developer was on the domestic linkage coal price and LOAs once issued assures the holder of ‘100% of the quantity as per the normative requirement’ as per the New Coal Distribution Policy. However, Coal India Ltd’s failure to meet its commitments under LOA has resulted in Case I developers unable to meet their obligations under PPA as there is no provision in PPA to provide for escalation in case coal is arranged through e-auction or through imports.  Case 2 linkage coal based projects – Same situation, however incase the design specifications of the boilers limit the acceptance of imported coal beyond 10-15%, the developer would not be able to meet the normative capacity availability requirement of 85%  Imported coal based projects – Shortage of coal in India and China and the resource nationalism exhibited by coal exporters such as Indonesia and Australia has led to steep increases in coal prices on a global level. How Is This Impeding Country’s Generation Portfolio 7 Stranded assets post 2009: Ratnagiri (JSW), Babandh (Lanco), Amarkantak (Lanco), Tiroda (Adani), Jhajjar (CLP), Bara (JP) etc Projects based on Imported Coal: Mundra (Tata), Krishnapatnam (Reliance), Udupi (Lanco) Projects based on Blended Coal: Aravali (NTPC JV), Sipat (NTPC)

Capacity Contracted Under Competitive Bidding 8 Competitive Bidding (Total Capacity Contracted: MW) Case – I (15275 MW) Captive Coal block based (2330 MW) 2008 (1320 MW) 2010 (1010 MW) Domestic Linkage Coal Based (10045 MW) 2006 (2200 MW) 2007 (1841 MW) 2008 (2404 MW) 2009 (1000 MW) 2010 (2600 MW) Imported Coal based (2900 MW) 2006 (1000 MW) 2009 (300 MW) 2010 (1600 MW) Case – II (10340 MW) Linkage Coal Based (10340 MW) 2006 (1100 MW) 2008 (4620 MW) 2009 (4620 MW) UMPP (16000 MW) Type of BiddingTypes of ProjectsPPAs signed in the year

Logistical Issues Is Imported Coal A Viable Option Resource Nationalization – Indonesia, Australia, South Africa Forex Outgo – Coal Import Bill could touch Rs 150,000 Cr Price Volatility – Global Coal Markets Technical Limitations – Equipment design Energy Security 9 Restrictions on export, additional customs and duties etc Almost 1/3 rd of current crude import bill Distribution utilities to get exposed to fluctuating price risks Most plants can take up to 28% imported coal max

Suggested Measures to Increase Domestic Coal Short Term Diversion of e-coal (12% ) to the stranded projects Expedite decisions related to mines in No Go Areas/CEPI Expedite linkage for 12 th Plan Projects and make priority solely based on project preparedness criteria To make coal FSA regime in accord with New Coal Distribution Policy (NCDP) Pricing of surplus production from captive mines Medium Term E-auction of captive coal blocks Setting up regulatory body Linkage Optimization Long Term Allow merchant mining by private players 10

Land Acquisition Issues Requirement of 80% Consent Acquisition by Private Companies for Public Purpose Preparation of social impact assessment Ban on Acquisition of irrigated multi crop land Return of land after 5 years if not used  Draft Land Acquisition and Rehabilitation & Resettlement bill introduced for public comments by GoI in July It is estimated that land will move up from a historical 5-8% of total project cost to as high as 30% of total project cost

12 Proposal Received by Govt SIA conducted by Appropriate Govt Appraisal of SIA Report by Expert Group Verification of public purpose legitimacy and 80% consent, Approval of SIA Report Publication of Preliminary Notification Preparation of Draft R&R Scheme Draft Declaration and Publication of R&R Scheme No timelines mentioned 12 months Practically, the affected families cannot give the consent unless the details of the rehabilitation and resettlement benefits are known Legitimacy of public purpose should be identified at an early stage to avoid wastage of effort Public Hearing for SIA Public Hearing Activity Flow of the Land Acquisition Process Needs Review In case notification is not issued within 12 months, SIA will be deemed to have lapsed Award 12 months 24 months The process as chalked out today is cumbersome and creates ambiguity. A review is needed to ensure efficient implementation of projects

Environmental Issues Issues Regulatory Framework No-Go Areas CEPI Notification Clearance Process 13

Precarious Position of Distribution Utilities Precarious Position High AT&C Losses Revenue Gap 14

● AT&C losses at ~30% is amongst the highest in the world, when compared to South East Asian nations which had 5-8% losses in 2007 and Brazilian utilities which averaged 15% in 2005 ● Reasons vary from combination of LT-HT lines and improper load management to unmetered supplies, faulty meters and electricity theft Losses At the current level the losses are likely to reach Rs 80,000 Cr by end of 2012 and Rs 116,000 Cr by end of  APDRP intended to reduce losses of utilities to 15%, improve financial viability of Discoms and improve quality of supply  Re-launched as R-APDRP in XI FYP, the program focused on actual, demonstrable performance in terms of sustained loss reduction

● In most states, tariff increase has been inadequate to cover the cost increases witnessed by the utilities. ● While the average cost of supply (all-India) level increased from Rs per unit to Rs per unit i.e. an increase of 82%, the increase in revenue has been only 56% (due to low tariffs). ● The revenue gap increased from 38 paise per unit in to 127 paise per unit in implying losses for the utilities. Increasing Revenue Gap Tariff Below Cost of Supply 16 Source: Report of High Level Panel on Financial Position of Distribution Utilities, Dec