Visual Resource Management: Challenges Faced by the NPS

Slides:



Advertisements
Similar presentations
Celebrate the Niagara Escarpment AWARE – April CELEBRATE THE NIAGARA ESCARPMENT – April 25, 2013.
Advertisements

Implementing Service First References & Recommendations.
1 INTEGRATING WILDERNESS CHARACTER INTO PLANNING Arthur Carhart National Wilderness Training Center, March 2012 Wilderness Character Webinar #3 Arthur.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
Public Meeting #2 Town of North Yarmouth Planning Decisions, Inc. OCTOBER 27, 2014.
Agency Staff report on the Creation of a: (Andy Lanier – DLCD, Laurel Hillmann – OPRD)
Wetland Planning Requirements, Tools & Processes.
Pacific Islands Coral Reef Program ESRI International User Conference – July 2005 National Park Service (NPS) Pacific Islands Coral Reef Program (PICRP)
Raster Based GIS Analysis
Geographic Information Systems Applications in Natural Resource Management Chapter 13 Raster GIS Database Analysis Michael G. Wing & Pete Bettinger.
Introduction to GIS © 2007 Austin Troy Instructor: Austin Troy University of Vermont School of Natural Resources Lecture materials.
Session 131 Hazard Mapping and Modeling Supporting Emergency Response Operations using GIS and Modeling.
URBAN CHARACTER ANALYSIS. Identifies key things that make up the qualities of an urban area Identifies key things that make up the qualities of an urban.
Rocky Mountain National Park National Park Service Mission The National Park Service preserves unimpaired the natural and cultural resources and values.
New River Gorge National River West Virginia GIS Conference 2004 GIS activities at New River Gorge National River By Andrew Steel.
Protecting Natural Resources in the West Ellen Porter Air Resources Division – National Park Service WRAP IOC Meeting, Denver, CO.
Digital Terrain Models by M. Varshosaz
Challenges in Urban Meteorology: A Forum for Users and Providers OFCM Panel Summaries Bob Dumont Senior Staff Meteorologist OFCM.
Factors Affecting Wind Power Development in North Carolina Dr. Dennis Grady Director, Appalachian State University Energy.
Visual Resource Management May 2015 Lander, Wyoming.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
PUBLIC PARTICIPATION IN WILDLAND RECREATION MANAGEMENT & PLANNING (Assignment #5) Credit for content of many of these slides & their organization plus.
GIS Tools for Watershed Delineation Public Policy Perspectives Teaching Public Policy in the Earth Sciences April 21, 2006 Gary Coutu Department of Geography.
Geographic Information System (GIS).
Imagery for the Nation and the changing landscape Remote sensing systems overview Geo-spatial requirements for GIS Technology advancements in sensing systems.
Chapter 10 Land, Public and Private. The Tragedy of the Commons In 1968, ecologist Garrett Hardin described the “tragedy of the commons” Tragedy of the.
Morphum Environmental Ltd Environmental Engineers and Consultants
Eftec Economics for the Environment Consultancy Using ecosystem services for cost benefit analysis of forestry decisions Roundtable on Cost / Benefit of.
Public Lands Environmental Politics. Public Lands What are public lands? How do publics lands fit into environmental Policy? Clash of public interests.
1 Visitor Use and Wildlife Protection in US National Parks Pathways to Success Conference October 6, 2014 Ericka Pilcher, Jennifer Stein, & Susan McPartland.
Standardization of the Continental Divide National Scenic Trail (CDNST) Data Management Kerry Shakarjian University of Denver Department of Geography Masters.
National Park Service U.S. Department of the Interior E X P E R I E N C E Y O U R A M E R I C A Renewable Energy & Landscape Alteration Surrounding U.S.
A Land Preservation Framework for the Cacapon Watershed of West Virginia Michael P. Strager Charles B. Yuill Natural Resource Analysis Center West Virginia.
Indiana GIS Conference, March 7-8, URBAN GROWTH MODELING USING MULTI-TEMPORAL IMAGES AND CELLULAR AUTOMATA – A CASE STUDY OF INDIANAPOLIS SHARAF.
Visual Resource Management May 2015 Lander, Wyoming.
Descriptive Analysis Database Archive monitoring network locations, climate, emissions, wildfires, census, political, physical, and image databases Databases.
Descriptive Analysis Database Archive monitoring network locations, climate, emissions, wildfires, census, political, physical, and image databases Databases.
Manual Direction Cave & Karst Resources Management James Goodbar Senior Cave /Karst Specialist Bureau of Land Management May 12-16, 2014 Cody, Wyoming.
U.S. Department of the Interior U.S. Geological Survey LANDFIRE Paul Bourget SGT, Inc., contractor to the U.S. Geological Survey (USGS) Earth Resources.
The Science Requirements for Coastal and Marine Spatial Planning Dr. Robert B. Gagosian President and CEO Ocean Studies Board November 10, 2009.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
San Luis Obispo County Planning and Building Department Jeff Legato Mapping and Graphics Specialist
Evaluating Remotely Sensed Images For Use In Inventorying Roadway Infrastructure Features N C R S T INFRASTRUCTURE.
Progressives and Conservation. Progressives and the Wilderness Need to save the wilderness and environment Business interests would use up to make $ Congress.
HPN: IFSS1 Intelligent Flight Support System (IFSS) A Real-Time Intelligent Decision Support Prototype PRESENTER/COTR Anthony Bruins (X37071) HPN Software.
Administrative Law PARA 2231 July 15, 2010 Mark David Mink.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
Fundamentals of GIS Lecture Materials by Austin Troy except where noted © 2008 Lecture 13: Introduction to Raster Spatial Analysis Using GIS-- By.
Course Wrap Up UNIT 16. Overall Course Objective Having participated in the course, you should be able to: Describe the basic principles and concepts.
Environmental Resources CD Unit Natural Resources.
1 Project Analysis and Evaluation UNIT 10 – Project Analysis and Evaluation.
BOT / GEOG / GEOL 4111 / Field data collection Visiting and characterizing representative sites Used for classification (training data), information.
Land, Public and Private Chapter 10. Human Activities Affecting Land and Environment  Extensive logging – mudslides  Deforestation – climate change.
The Science Requirements for Coastal and Marine Spatial Planning Dr. Robert B. Gagosian President and CEO September 24, 2009.
1 Resolving conflicts in protected areas when values range from economics to the intangible Mike Tranel Alaska Region, US National Park Service 19 November.
E-Education Institute Lidar Technology and Applications Proposal for an elective course to be offered by the Dutton e-Education Institute MGIS Capstone.
Responsible Ecosystem- Based Solutions. Providing environmental consulting services, resource planning and management solutions to government, non-profit,
Business Plan for the National Landscape Conservation System.
As a primary goal, we would recommend that the biotic associations within each park be maintained, or where necessary recreated, as nearly as possible.
Land, Public and Private. Human Activities Affecting Land and Environment  Extensive logging – mudslides  Deforestation – climate change  Paving –
Christine Chui Lee PRIZIM Inc. Consultant for the NPS Concession Program June 2, 2008 Advancing Executive Order Goals with Federal Agency Partners.
Managing the Human Footprint. Planning, Policy, and Management  Key elements in the process of identifying problems and their possible solutions  Essential.
Visualization Technology: What's Out There? Adapted from Campbell 2005 Courtesy CALP.
Why Create (and maintain) Yellowstone National Park? For the benefit and enjoyment of the people, Recreation Enjoyment Preservation Ecosystem Geology Conservation.
Chapter 10 – Land: Public and Private
Department of Geography Geographic Information Science
Landscape Approach to Resource Management
Presentation transcript:

Visual Resource Management: Challenges Faced by the NPS Suzanne Gucciardo Natural Resource Specialist Lewis and Clark National Historic Trail Resource Information Management Conference 22 April 2010 Ft. Collins, CO

Lewis and Clark National Historic Trail National Trail System Act (amended 1978) 3,700 mile route of Corps of Discovery Historic route Auto tour route Preserve trail remnants and artifacts Administers through partnerships

Organic Act (16 USC 1) …[The National Park Service] “shall promote and regulate the use of the Federal areas… by such means and measures as conform to the fundamental purpose of the said parks, monuments, and reservations, which purpose is to conserve the scenery and the natural and historic objects and the wild life therein and to provide for the enjoyment of the same in such manner and by such means as will leave them unimpaired for the enjoyment of future generations”

So what are visual resources? Scenery Landscape ≠ or Scenic resources Visual resources includes both also dark skies, air quality related values

Scenic resources Interaction of forms and concepts: Physical set of elements visible in space Image in the viewer’s eye Idea in the mind, a memory, a feeling in the gut

Scenic resources Have meaning Aesthetics Historic and cultural context

Increased threats to NPS scenic values External threats Result of actions outside boundary that impacts park Affects views from park Internal changes Result from natural or management changes within park boundary May affect both views within and into park

Land Use Change Conversion of ag/forestry lands Urban sprawl Commercial development Wal-Mart NP? Rural residential development Viewsheds into parks

Which park is this? Time for a quiz:

Energy Development

Communication Systems

Climate Change

Internal Change Park-based: Wind turbines to supplement power needs Communication towers, antennas Water tanks Service roads and buildings Visitor service facilities

Vegetation Changes

NPS response to visual resource issues: NPS measures success of management by preventing “impairment” Currently no standard practice or guidance for measuring impairment to visual resource values No program area responsible for visual resources On a case by case basis, may include: Viewshed analysis Visual simulations Public input

Viewshed analysis GIS based query Spatial analyst 3-D analyst Choice of DTMs TIN DEM Nine parameters can be set

Google tool (Hey, what’s that!) USGS DTM Offset for viewer height

How Good are Viewshed Tools? Only as good as user Even simple tools must be understood

Concerns with GIS Models Do not account for vegetation effects ? Overcome with Lidar data ? Available when needed “Casual” users versus dedicated GIS staff Nuances may be missed and misleading

An Accuracy Assessment of Various GIS-based Viewshed Delineation Techniques Mark A. Maloy and Denis J. Dean Photogrammetric Engineering & Remote Sensing Vol. 67, No. 11, November 2001, pp. 1293-1298.

Compared field survey with GIS-based predictions of viewsheds 11 intermediate scale viewsheds west of Fort Collins, CO Field survey GPS primary and secondary viewpoints Angles from viewpoints to distinctive features on boundary Standard triangular geometry survey methods Photography

Data sources and models USGS data 1:24,500 scale DTM, 30-meter resolution 1:24,500 scale DTM, resampled to 10 meters 1:250,000 scale DTM, ~ 81.5 meters 1:24,500 scale Hypsography, 10-meter spacing Single DEM model on each data set Four TIN models on each set 20 predictions for each of 11 viewsheds

Results GIS produced two types of errors Omission Failed to detect areas surveyed within viewshed Commission Included areas not surveyed within viewshed Results varied greatly among models Mediocre results, even under best conditions

Average (across 11 viewpoints) Percent of Total Area USGS 1:24,000 scale, 30-meter GIS model TIN criteria Surveyed & predicted visible Predicted invisible (omission) Predicted visible (commission) DEM N/A 56.57 27.38 15.15 TIN Label 51.04 36.70 12.25 1 corner 54.01 25.03 20.96 2 corners 41.75 46.21 12.04 3 corners 18.95 76.47 4.59

Average (across 11 viewpoints) Percent of Total Area USGS 1:24,000 scale, resampled to 10-meter GIS model TIN criteria Surveyed & predicted visible Predicted invisible (omission) Predicted visible (commission) DEM N/A 54.18 31.42 13.18 TIN Label 51.25 37.56 11.19 1 corner 53.23 29.33 17.44 2 corners 38.04 52.96 9.01 3 corners 16.10 81.35 2.55

Average (across 11 viewpoints) Percent of Total Area USGS 1:250,000 scale, ~81.5-meter GIS model TIN criteria Surveyed & predicted visible Predicted invisible (omission) Predicted visible (commission) DEM N/A 27.28 33.97 35.79 TIN Label 17.22 39.11 43.67 1 corner 20.64 49.97 29.39 2 corners 12.50 34.70 52.80 3 corners 9.50 71.06 19.44

Average (across 11 viewpoints) Percent of Total Area USGS 1:24,000 scale, hypsographic, 10-meter GIS model TIN criteria Surveyed & predicted visible Predicted invisible (omission) Predicted visible (commission) DEM N/A 30.94 42.81 22.38 TIN Label 21.30 53.39 25.32 1 corner 24.19 43.04 32.78 2 corners 18.29 62.56 19.15 3 corners 8.21 83.82 7.97

Take Home Lesson GIS is not sufficient for supporting decisions Field verification of viewsheds should be standard GIS can be misinterpreted Park management Public

How should NPS respond to visual resource issues? Develop visual resource policy and program Take advantage other agency experience BLM Visual Resource Management (since 1970s) US Forest Service Scenery Management System (since 1970s) NPS Blue Ridge Parkway Based on BLM VRM, must be adapted to local needs

BLM: Visual Resource Management System Complete program Inventory Analysis Mitigation Mandated on all BLM lands Agency mission to support multiple use on BLM lands

Forest Service: Scenery Management System Mission to integrate forest production and multiple use

Short term response Use best available tools wisely Don’t rely on single method or analysis Consult with other NPS staff or other agencies to see what works, what doesn’t Encourage NPS management to develop guidance and standard practices