CRINUM MINE SAFETY INITIATIVE CRINUM BOOT END CONVEYOR BARRIER.

Slides:



Advertisements
Similar presentations
TapRooT® Summit – Mining
Advertisements

Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
This guide provides compliance information to help the metal and nonmetal mining industry meet current requirements of the Mine Safety and Health Administration’s.
Research Update Automated Bolting and Meshing Project - C17018.
Mobile Equipment Hazards
Cracow Gold Mine Quick Hitch Fan Cradle 22 nd August 2011 Townsville.
Designing & Providing Tire Handling Equipment for the Automotive Industry for Over 30 years TIRE HANDLING.
VS Series Shears. User-friendly CNC Touchscreen Control Flexibility for Thick/Thin or Narrow/Wide Sheets Automatic Swing-up Back Gauge T-slotted Sheet.
By: Belt Conveyor Guarding ( (866) Guarding Belt Conveyors.
Mike Marr Safety Consultant Specialist
‘Feeder Blockage Removal Device’ Shane Phillips – Saraji Mine (BMA)
Guarding Conveyor Belts at Metal & Nonmetal Mines Mine Safety & Health Administration – June 2010.
Safe Lifting & Material Handling. Part 1: Back Injury Prevention.
Ladders Can take you… to great heights or on a quick trip to the ground.
MSHA Machine Guarding. Introduction to Guarding l Many accidents result from persons working on or around moving machinery. These accidents could have.
Cookson & Zinn (PTL) Ltd Tank Base Frame Assembly.
Mechanisms Paul Ventimiglia WPI Student, Team 190.
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
CENTENNIAL HYDRAULIC ISOLATION CONTROL SYSTEM (CHICS) Peter Bergin Trevor Hartley Centennial Newstan In conjunction with APT Training.
SRACA Conference A Company’s Perspective – New Road Cases Toowoomba – August 2014.
Risk Management (Safe Work Method Statements)
Conveyor Systems GUARDING Protecting Life & Limb.
Mine Fatalities Involving Conveyors. Mining Fatality On August 1, 2005, a 30- year old laborer, with eight weeks mining experience, was fatally injured.
 Guarding of Moving Machine Parts  2940 (2007)  13.9%
Guarding Belt Conveyors. 1.Setting The Guarding Policy 2.Things to Consider When Building a Guard or Guarding an Area 3.Common Areas Requiring Guarding.
ACARP Roadway Development - Operators Workshop March 2008
Decline Warning Lights System Jason Lindley Electrical Technical Officer, Project Engineering August 22, 2011.
Machine Guarding. Moving Machine Parts 30 CFR § (a) Moving machine parts shall be guarded to protect persons from contacting gears, sprockets,
RUNNING RIGHT SAFETY MEETING. Dismounting RUNNING RIGHT.
Renewable and Nonrenewable Resources Chapter 2. Theme Outline Lesson 2.3  Distribution and Management of Natural Resources  Pennsylvania Coal  Coal.
OMCSA Innovation Award Entry March 2012 “THE RERAILER BAR”
Organization of 30 CFR The Mine Health and Safety Act A Look at General Provisions ©Feb 2003 Dr. Bradley C Paul.
13/2/08 Fundamental Analysis of Development Cycles at Xstrata NSW Mines ACARP Roadway Development Operator Workshops March 2008.
MSHA’S Guide to Equipment Guarding. Advantages of Using Expanded Metal or Sizing Screen n The components guarded can be inspected without removing the.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
Safety on Call LADDER SAFETY. Safety on Call LADDERS CAN TAKE YOU… To great heights or on a quick trip to the ground.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
30 CFR /14211 Do not work on top of, under, or from a piece of mobile equipment in a raised position. Maintenance shall not be performed on mobile.
Scroll Saw Operation and Safety
MSHA’s Guide to Equipment Guarding U.S. Department of Labor Mine Safety and Health Administration Other Training Material OT 3 Revised 2000.
MNM Fatal Slip or Fall of Person (Indiana) Slip or Fall of Person (Indiana) February 26, 2004 February 26, 2004 Crushed Stone Operation Crushed.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
Mechanical Hazards Master Notes PrintED IGCB 7. Describe appropriate safety procedures to follow when operating equipment.
VEX UNITS OF WORK UNIT 1: TUMBLERUNIT 2: CLAWBOTUNIT 3: MANUFACTURING UNIT 1.1: Autodesk Inventor TUMBLER Build UNIT 2.1: Autodesk Inventor CLAWBOT Build.
Engineering Design Process Selecting an idea – design and build Steps 3 and 4.
TRAP Take Responsibility for Accident Prevention By Ranjan Kumar
Machine Guarding OSHA 29 CFR
Mine Fatalities Involving Conveyors
Automated Monitoring and Warning Systems Presented by Mark Johnston – PIMS Group Principal Engineer Dave Dowell – PITS Engineering Manager Introduction.
VEX UNITS OF WORK UNIT 1: TUMBLER UNIT 2: CLAWBOT
MECHANICAL HANDLING SYSTEMS
System Conversion.
DON’T GET CARRIED AWAY WORKING AROUND CONVEYOR BELTS
MINE HAZARD TRAINING FOR CONTRACT TRUCKERS
Conveyors.
SAFETY IN THE CLASSROOM
Crush while transporting and unloading steel frame structure
MSHA’S Guide to Equipment Guarding
This figure shows a tail pulley with an inadequate guard
CONVEYOR & CRUSHER SAFETY
HYDRAULIC POWERED SUPPORTS By DC Ratkuria. POWERED SUPPORTS Hydraulic powered roof supports are self advancing structures which are interconnected along the length.
Stockbridge, Georgia pipe plant
Conveyor Systems.
Conveyor Systems.
Regulation Updates in OSHA
Conveyor Systems.
Conveyor Systems.
Presentation transcript:

CRINUM MINE SAFETY INITIATIVE CRINUM BOOT END CONVEYOR BARRIER

HISTORICAL FACTS   AFTER MANY YEARS OF LONGWALL MINING ACTIVITY, THE AREA OF EXPOSURE FROM THE LONGWALL BOOT END TO THE FIRST BAY OF CONVEYOR STRUCTURE HAS BEEN AN AREA THAT HAS A HIGH POTENTIAL FOR INJURY   IT IS AN AREA THAT PEOPLE CONSTANTLY WALK PAST   THEY ARE NEXT TO A FAST MOVING EXPOSED CONVEYOR THAT IS BEING LOADED WITH COAL FROM A BEAM STAGE LOADER

HISTORICAL FACTS   THE POTENTIAL FOR STONE AND COAL BOUNCING FROM THE BELT IS A CONSTANT THREAT   THE POTENTIAL TO TRIP/FALL ONTO THE BOTTOM BELT AND BE CAUGHT IN THE RETURN ROLLERS IS THE MAJOR RISK

HISTORICAL FACTS  THROUGHOUT THE INDUSTRY AND AT CRINUM, WE HAVE PROGRESSED FROM HAVING NO BARRIER BETWEEN THE WALKWAY AND THE CONVEYOR TO PROTECT PEOPLE TRAVELLING PAST THIS AREA,  TO HAVING A FLEXIBLE HEAVY PLASTIC MESH,  THIS GAVE PROTECTION FROM FALLING ONTO THE CONVEYOR BUT VERY LITTLE AGAINST LARGE STONE OR COAL PIECES BOUNCING OFF THE CONVEYOR POTENTAILLY HARMING PERSONNEL

HISTORICAL FACTS  OTHER MINE SITES HAVE A SIMILAR METHOD IN PLACE TO STOP INTERACTION WITH THE BELT  THERE HAS BEEN A NEED IN THE INDUSTRY FOR SOMETIME TO HAVE SOMETHING MORE SUBSTANTIAL IN PLACE  WE BELIEVE THE SYSTEM WE ARE INTRODUCING AT CRINUM CAN FULLFIL THIS NEED AND REDUCE THE RISK TO PERSONNEL

ORIGINAL CRINUM BELT BARRIER  PLASTIC MESH BARRIER.  THIS IS FIXED TO THE OUTBYE END OF THE BELT STRUCTURE.

ORIGINAL CRINUM BELT BARRIER  THE INBYE END OF THE MESH IS AT THE BOOT END AND IS WOUND ONTO A SPINDLE EACH TIME THE BOOT MOVES

CONCEPT  MICK PARSONS (Longwall Operator), IDENTIFIED THE NEED AND DREW A BASIC DRAWING OF A MESH GUARD SUPENDED FROM OUR EXISTING MONORAIL AND APPROACHED THE LONGWALL MANAGEMENT TEAM FOR THEIR THOUGHTS  THE IDEA WAS TAKEN UP BY THE LONGWALL MAINTENANCE COORDINATOR AS THE DRIVER TO DEVELOP IT FURTHER  MICK ALONG WITH LONGWALL OPERATORS EDDIE, PETE AND BRAD BUILD A PROTOTYE TO TRIAL

ORIGINAL CRINUM BELT BARRIER AND PROTOTYPE THE ORIGINAL BARRIER WITH THE PROTOTYPE BARRIER IN FRONT OF IT.

DESIGN AND MANUFACTURE  MACQUARRIE MANUFACTURING WERE CONTACTED AND THEY ASSISTED WITH THE DESIGN AND MANUFACTURE OF THE SYSTEM FOR CRINUM  A SERIES OF DESIGNS WERE TABLED AND WHEN IT WAS AGREED ON THE MOST EFFECTIVE THE BARRIER WAS BUILT

DESIGN AND MANUFACTURE

METHOD   THE SYSTEM IS SET UP ON 2 PARALLEL MONORAIL BEAMS MOUNTED FROM THE EXISTING SERVICES MONORAIL SUPPLYING THE LONGWALL FACE   THE MONORAIL SYSTEM HAS A LENGTH OF 15 METRES, CONTINUING FROM THE BOOT END TO THE LAST STRUCTURE BAY   EACH OF THE TWO MONORAILS HAS A MESH BARRIER 7.5M LONG   THESE ARE SUSPENDED BY CHAINS FROM THE MONORAIL RUNNERS

METHOD  WHEN BOTH BARRIERS ARE IN THE NORMAL POSITION (FULLY STRETCHED OUT) THEY WILL COVER UP TO 15M OF POTENTIALLY EXPOSED CONVEYOR  THESE ARE LOCKED TOGETHER UNTIL STRUCTURE IS REQUIRED TO BE REMOVED  WHEN THE BOOT END IS RETREATED UP TO THE CONVEYOR STRUCTURE, STRUCTURE BAYS ARE REQUIRED TO BE REMOVED  THE BARRIERS ARE SIMPLY UNCLIPED AND SEPERATED

METHOD  THE INBYE SECTION OF BARRIER IS MOVED TO BE ADJACENT TO THE OUTBYE SECTION THIS NOW ALLOWS THE INBYE CONVEYOR STRUCTURE TO BE REMOVED  ONCE STRUCTURE HAS BEEN REMOVED, BOTH SECTIONS OF BARRIER BOTH SECTION ARE MOVED INBYE EXPOSING THE OUTBYE SECTION WHICH IS THEN REMOVED

MESH BARRIER  ONCE THESE BAYS HAVE BEEN REMOVED THE BARRIER IS FULLY OPENED UP AND LOCKED IN PLACE, PROVIDING GUARDING TO THE EXPOSED CONVEYOR CONCEPT OWNER MICK PARSONS

MESH BARRIER FULLY EXTENDED

VIDEO CLIP PRIOR TO DELIVERY

MESH BARRIER UNDERGROUND

CONCLUSION  THE NEW MESH BARRIER HAS BEEN IN USE FOR SOME TIME NOW AND IS WORKING VERY WELL HAVING BEEN ADOPTED QUICKLY BY ALL CREWS  IT IS SEEN BY BOTH U/G PERSONNEL AND MANAGEMENT AS A SIGNIFICANT IMPROVEMENT TOWARD THE SAFETY OF PERSONNEL IN THE U/G ENVIRONMENT  THE LONGWALL TEAM ARE VERY PROUD OF THEIR ACHEIVEMENT AND BELIEVE THAT THEY HAVE DEVELOPED AN INGENIUS SOLUTION TO AN INDUSTRY WIDE HAZARD

THE TEAM Mick, Eddie, Brad, Pete, Mike. THANK YOU!