Settlement Agreement April - September 2008 Prepared for the Technical Oversight Committee January 29, 2009.

Slides:



Advertisements
Similar presentations
Water Quality Standards Program Status of Numeric Nutrient Criteria (NNC) Division of Environmental Assessment and Restoration.
Advertisements

Spokane River Dissolved Oxygen Total Maximum Daily Load WRIA 54 Planning Unit Drea Traeumer, Spokane River TMDL Lead February 28, 2007.
Water Quality Assessment of Osage Creek & West Fork, White and Kings Rivers 2008 & ½ 2009 Marc Nelson PhD, PE Nelson Engineering.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Evaluation of Volunteer Data – The Lakes of Missouri Volunteer Program Review Daniel V. Obrecht Anthony P. Thorpe John R. Jones Department of Fisheries.
Please note: this presentation has not received Director’s approval and is subject to revision.
SETTLEMENT AGREEMENT REPORT October - December 2009 Technical Oversight Committee March 2, 2010 Pam Lehr Section Leader Restoration Sciences Department.
Chubaka Producciones Presenta :.
. Topographic map of the Refuge marsh (figure provided by Dr. E.A. Meselhe based on USGS topography data). Elevations are in feet, NGVD29.Form USGS data;
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
Real-Time Water Quality Monitoring for Investigating the Strengths and Weaknesses of Existing Monitoring Techniques Little Bear River Basin Jeffery S.
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Monthly Composites of Sea Surface Temperature and Ocean Chlorophyll Concentrations These maps were created by Jennifer Bosch by averaging all the data.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
CRFS Technical Meeting LC Operations Update November 8, 2011.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
Update to Loxahatchee River Coordinating Council L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008.
Water Quality Monitoring and Constituent Load Estimation in the Kings River near Berryville, Arkansas 2009 Brian E. Haggard Arkansas Water Resources Center.
Water Quality Sampling, Analysis and Annual Load Determinations for Nutrients and Solids on the Ballard Creek, 2008 Arkansas Water Resources Center UA.
Stream Monitoring of Selected Sub-watersheds of Conesus Lake.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Comparison of Arithmetic Mean Stage vs. Weighted Mean Stage in Refuge Compliance Calculations Cheol Mo, PhD Lead Environmental Scientist South Florida.
CRFS Technical Meeting LC Operations Update March 29, 2011.
CRFS Technical Meeting LC Operations Update March 30, 2010.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
WRAC Acme Basin B Discharge Project February 2, 2006.
Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.
Point Source Loads and Decision Criteria for Toxics Modeling Baltimore Harbor TMDL Stakeholder Advisory Group September 10, 2002.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Settlement Agreement April June 2007 Prepared for the Technical Oversight Committee August 28, 2007.
Colorado River Basin: Overview of Determining Lake Powell and Lake Mead Annual Operational Tiers WSWC Seasonal Precipitation Forecast Workshop December.
Brian Haggard Director Arkansas Water Resources Center Funding provided by ANRC through Beaver Water District.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Request for Changes to Settlement Agreement Monitoring Pete Rawlik, SFWMD TOC Meeting,
The Calendar.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Water Quality Sampling, Analysis and Annual Load Determinations for the Illinois River at Arkansas Highway 59 Bridge, 2008 Brian E. Haggard Arkansas Water.
Everglades National Park Lessons Learned From Everglades National Park, USA Expert Workshop on Benchmarks and Chapter IV Operational Guidelines World Heritage.
CRFS Technical Meeting LC Operations Update November 14, 2012.
CRFS Technical Meeting LC Operations Update March 27, 2014.
S o u t h F l o r i d a W a t e r M a n a g e m e n t D i s t r i c t Resampling Guidance: When Should Field Crews Resample Water Quality at a Site? 1/29/09.
Monthly mean of stream lines at 200 hPa (upper) and 850 hPa (lower) in January A track of the tropical cyclone formed in January is superimposed.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Do you know all these facts?
Water Depth and Nutrient Ratios over Space
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Jim McClelland Rae Mooney University of Texas at Austin
Tracking new discoveries using file history
Drought in Upper Colorado Basin
2300 (11PM) September 21 Blue line is meridian..
Enforcing the NAAQS Case Study Sean Taylor
Storm Event Analysis: August 21, 2006 Amarillo, Texas
McDonald’s calendar 2007.
Proud As A Peacock! We are very proud of__________________
Update to Loxahatchee River Coordinating Council
Bixby Park 2018 Monitoring Compost Road Station Inlet Weir Outlet Weir.
RESOLUTION OF INTENT TO PREPARE A SEASIDE BASIN GROUNDWATER MANAGEMENT PLAN March 15, 2004 BOARD ACTION: CONSIDER ADOPTION OF A RESOLUTION DECLARING THE.
McDonald’s calendar 2007.
Do you know all these facts?
2015 January February March April May June July August September
Upper Hudson/Sacandaga River Offer of Settlement
Presentation transcript:

Settlement Agreement April - September 2008 Prepared for the Technical Oversight Committee January 29, 2009

A.R.M Loxahatchee National Wildlife Refuge Monthly Total Phosphorus Geometric Mean Concentrations

Refuge TP Compliance Tracking for April 2008 – December 2008

TP Flow-Weighted Mean Concentrations Inflows to the ENP through Taylor Slough and the Coastal Basins The 12-month FWMC at the end of each water year compared to the 11 ppb long-term total phosphorus limit.

TP Flow-Weighted Mean Concentrations Inflows to the ENP through Taylor Slough and the Coastal Basins The 12-month FWMC at the end of each month and the composite TP concentration for each sampling event.

Taylor Slough and the Coastal Basins TP Concentration Compliance Tracking For April 2008 – September 2008

Taylor Slough and S18C Daily Flows Daily flows into Everglades National Park through Taylor Slough and S18C.

Taylor Slough and S18C Sampling Event Flows and FWMC Daily flows at Taylor Slough structures and S18C and the corresponding TP for individual sampling events.

Flow-weighted Mean Concentrations Inflows to ENP through Shark River Slough 12-month FWMC at the end of each water year compared to the TP interim and long-term limits.

Flow-Weighted Mean Concentrations Inflows to ENP through Shark River Slough 12-month FWMC at the end of each month and the composite TP concentration for each sampling event.

Shark River Slough TP Concentration Compliance Tracking for April 2008 – September 2008

Shark River Slough Grab TP Concentration Data in August and September 2008 * Shaded row indicates compliance data. ** Results for the September 3, 2008 sampling event grabs were qualified based on the District’s laboratory protocol for detections in the associated FCEB.

WY month FWMC Calculations for Shark River Slough ScenarioDescription Qualified 9/3/2008 Data Used? 12-month TP FWMC (ppb) Met Long- Term Limit (10.2 ppb)? Comments 1 Bi-weekly with 9/3/2008 data Yes10.2Yes Standard compliance calculation with 9/3/2008 data 2 Bi-weekly without 9/3/2008 data No10.6No Standard compliance calculation without 9/3/2008 data 3 Bi-weekly with 8/27/2008 and 9/10/2008 data No10.2Yes Used average TP from 8/27/2008 and 9/10/2008 events 4 Alternate bi- weekly data No9.9Yes Used alternate sampling events normally excluded from compliance calculations 5Weekly dataNo10.2Yes Used all unqualified data for weekly sampling events

Shark River Slough Daily Flows by Structure

Daily flow at S333 and S334

Shark River Slough Sampling Event Daily Flows and FWMC Daily flow at Shark River Slough structures and the corresponding TP FWMCs for individual sampling events.