ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal January 2010 Elaine Carr ScottishPower.

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
1 Empty Properties – A Wasted Asset. 2 Empty Homes Are a Waste Empty homes attract vandalism and in some cases vermin. They are a security risk. They.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Xoserve sense checks & validation Reasonable Endeavours Claims.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Analysis of the Xoserve Read Validation Proposal Author: Alex Cullin 27/08/2014.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
PN UNC Workgroup Read Validation 4 th October 2011.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
How to Access and Redeem Cisco Certification Exam Discount Vouchers Step-by-Step Guide August 2013.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Options for Mod 640 Replacement
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
Harmonisation Working Group
Revised registration for unregistered sites
Harmonisation Working Group
Incentives 26 September 2018.
Lynne McNaughton – Specialist II National Carbon Reduction Unit
Modification th July 2008.
Elaine Carr ScottishPower
Harmonisation Working Group
Chris Warner Network Code Manager
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
0630R Review Group meeting 21 February 2018 Settlement Data topic
Gas Long Term Vacant (LTV) Proposal April 2010
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Deferral of Retrospective Updates Functionality
Supply Point Information Services Post-Nexus update
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
PN UNC Workgroup (AQ topic)
Retail Energy Code - Data Access Schedule
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal January 2010 Elaine Carr ScottishPower

ScottishPower, Energy Retail 2 Background There are approximately 700k homes unoccupied, 300k vacant for more than 6 months in England alone Gas Shippers are unable to effectively reduce their settlement and transportation cost exposure to these sites –An AQ for a site can only be amended through obtaining meter readings –A Shipper cannot gain access to the site to obtain meter readings –The Shipper has no redress to change the AQ of the site to reduce costs In the electricity market this problem has been addressed through BSC MOD196

ScottishPower, Energy Retail 3 What happens in the electricity market.. Initially considered as Issue 14 of the Balancing and Settlement Code in 2005 and seen as a materially significant MOD196 - “Treatment of Long Term Vacant Sites in Settlement” was proposed following Issue 14 consideration MOD196 was introduced on 22 February 2007 Since introduction 50,000 MPANs have gone through the LTV process

ScottishPower, Energy Retail 4 Current process in electricity PRINCIPLE: Allows Suppliers to classify a site as Long Term Vacant (LTV) and set the Estimated Annual Consumption (EAC) to zero for settlement TO QUALIFY: The Supplier must have received two “Notification of failure to obtain reading” flows with the “site visit check code” noted as “site not occupied”. These must be more than three calendar months, but less than seven months, apart EXCLUSIONS: The site should not be classed as LTV if: –any other “site visit check code” is received between “site not occupied” notices –the Supplier receives any other valid flows containing register reading data –there is any indication of consumption at the site

ScottishPower, Energy Retail 5 Ongoing management of electricity LTVs The Supplier must proactively attempt to obtain meter readings and retain a record of these attempts: –extra attempts to contact the owner e.g telephone, post, –attempting to contact the local estate agent or local authority –where dual fuel by checking for a similar pattern with gas consumption The site must remain energised according to the Supplier Meter Registration Service to qualify as an LTV

ScottishPower, Energy Retail 6 Concluding electricity LTV status A site ceases to be an LTV where: EITHER One of the exclusions are met: –any other “site visit check code” is received between “site not occupied” notices –the Supplier receives any other valid flows containing register reading data –there is any indication of consumption at the site OR The Supplier has not registered a “notification of failure to obtain reading” within a seven month period OR The Supplier believes that energy consumption has re-started On meeting any of the criteria above the Supplier must instruct the Data Collector to enter a non-zero EAC into the settlement process

ScottishPower, Energy Retail 7 Safeguards Treatment of LTVs are included in the scope of ongoing audit from 2007/08 The audit assesses the validity of the Supplier LTV classification process MRASCo has made additions to the Working Practice Product Set to clarify the use of site visit codes – “site not occupied” and “no access”

ScottishPower, Energy Retail 8 Gas context There are 700k properties in England alone that are estimated to be vacant, 300k for more than 6 months. In Scotland a recent study found 4% of homes unoccupied At present the Shipper will make continuing attempts to gain access to the property to get readings and make various contact attempts – knowing the site is vacant Although this proposal seeks to reduce Shipper exposure to unwarranted costs, it is a clear solution to a commercial/cost allocation problem This proposal will allow more accurate allocation of costs through RbD

ScottishPower, Energy Retail 9 Proposal for gas PRINCIPLE: Allows Shipper to classify a site as Long Term Vacant (LTV) and asks Xoserve to set the Annual Quantity (AQ) to one for settlement TO QUALIFY: The Shipper must have received two RVV02 flows with validation code E126 (“vacant premises”) and these must be more than three calendar months, but less than seven months, apart EXCLUSIONS: The site should not be classed as LTV if: –any other validation code is received between “vacant premises” notices –the Shipper receives any other valid flows containing register reading data –there is any indication of consumption at the site

ScottishPower, Energy Retail 10 Ongoing management of gas LTVs The Supplier must proactively attempt to obtain meter readings and retain a record of these attempts: –extra attempts to contact the owner e.g telephone, post, –attempting to contact the local estate agent or local authority –where dual fuel by checking for a similar pattern with electricity consumption The site must remain live on the Sites and Meters Database, noted as LTV, to qualify as an LTV

ScottishPower, Energy Retail 11 Concluding gas LTV status A site ceases to be an LTV where: EITHER One of the exclusions are met: –any other validation code is received between “vacant premises” notices –the Shipper receives any other valid flows containing register reading data –there is any indication of consumption at the site OR The Shipper has not registered an RVV02 flow within a seven month period OR The Shipper believes that gas consumption has re-started Shipper must then instruct Xoserve to revert to the previous non-vacant AQ value

ScottishPower, Energy Retail 12 Safeguards Xoserve would monitor the use of the LTV process and report Shipper usage through the RbD Sub-group It is proposed that the draft MOD would be sent for development and the Development Group would consider incentives and appropriate monitoring to ensure that there is no abuse of the AQ process. In addition the Group would consider how the process would work in practice It should be considered that there is an auditable process in the electricity market and that this might be used as a corresponding safeguard that the Supplier is acting in good faith Any LTV MOD proposed ScottishPower would be for the SSP/LSP market only