Catalyzing Research & Development Funding for GEOSS - Task ST-09-01 Stuart Marsh, UK/BGS Kathy Fontaine, US/NASA Bente Lilja Bye, Norway/BLB.

Slides:



Advertisements
Similar presentations
Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Advertisements

Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
ID-06 Building a User-Driven GEOSS Essential Components of User Management for GEO Tasks.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
The GEOSS Science and Technology Stakeholder Network: A spin-off of the EGIDA Project Hans-Peter Plag, Ian McCallum, Steffen Fritz, Shelley Jules-Plag,
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
EGIDA PROJECT COORDINATING EARTH AND ENVIRONMENTAL CROSS- DISCIPLINARY PROJECTS TO PROMOTE GEOSS Contact Point: Stefano Nativi
Engaging Stakeholders 6 May 2015 Work Plan Symposium Geneva, Switzerland Kathy Fontaine IEEE.
Promoting Awareness & Benefits of GEO EGIDA – WP3.
Standards setting and international coordination in food security statistics Pietro Gennari, Director, Fao Statistics Division.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Task ID-05 IDIB report ID-05 Catalyzing Resources for GEOSS Implementation C1 - Resource Mobilization for Capacity Building C2 - Resource Mobilization.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
Space Technology for Emergency Response and Risk Reduction European Conference - GEO Welcomes FP7 Constanta, Romania 15 September 2006 United Nations platform.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
GEOSS Survey Design Draft John Adamec. Survey Design Schematic Substance Question Sections Sorting Questions Are you familiar with GEO/GEOSS? YN Which,
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
EGIDA Project EGIDA Methodology and use-cases P. Mazzetti (CNR) Bonn, Germany – May, 09-11, 2011.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
BREAKOUT SESSION CHARTER RUSSELL LEFEVRE IEEE. BREAKOUT SESSIONS B1-Stakeholder Network (Co-Chairs: Michael Nyenhuis, Hans-Peter Plag) B2-Advisory Board.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
ST Kick-off Promoting Awareness and Benefits of GEO in the Science and Technology Community Douglas Cripe – GEO Secretariat Frascati/Brussels
Plenary Discussion of Framework for Engagement GEO XI Plenary Geneva, November, 2014.
Science and Technology Committee GGOS, December 2006.
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
Partnership Analysis & Enhancement Tool Kit Cindy S. Soloe Research Triangle Institute (RTI) April Y. Vance Centers for Disease Control and Prevention.
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
CEOS Participation in GEO Work Plan Management Structure Agenda 5 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
María Amor Barros del Río Gender as content in research in Horizon 2020 GENDER AS CONTENT IN RESEARCH IN HORIZON 2020 CAPACITY BUILDING WORKSHOP FOR RESEARCHERS.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Mapping (EGIDA/GEOSS) Stakeholders and STC Road Map Hans-Peter Plag Michael Nyenhuis.
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
A GEO Label: Scope of Review Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
A GEO Label: Status, Issues, Next Steps Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
Towards an European Network of Earth Observation Networks (ENEON): Addressing Challenges and Facilitating Collaboration for non-space based Earth Observations.
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
An orientation about the activities of ST related to “GEO label” and Data Citation Standard by Bente Lilja Bye and Hans-Peter Plag on behalf of GEO.
The GEOSS Science & Technology Stakeholder Network – Workshop Goals Michael Nyenhuis Hans-Peter Plag.
The GEOSS Science and Technology Stakeholders: Implementing the Science and Technology Road Map through an open, global networking approach Goals: - Engage.
Science and Technology Roadmap - current progress 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
GEO Partnerships, Objectives and Activities Roundtable: Strengthening UN Engagement with a Special Focus on the Post-2015 Development Agenda Barbara J.
Florian Wetzel, EU BON Biodiversity and Ecosystem Sustainability 2016 GEO Work Programme Symposium Breakout Session Report 4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Towards a New Phase of GEOSS Implementation : The GEO Work Plan Alexia C. Massacand GEO Work Plan Coordinator
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
EGIDA PROJECT Coordinating Earth and environmental cross-disciplinary projects to promote GEOSS 24 Apr 2012 Vienna, Austria Stefano Nativi.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Oceans and Society: Blue Planet
Presentation transcript:

Catalyzing Research & Development Funding for GEOSS - Task ST Stuart Marsh, UK/BGS Kathy Fontaine, US/NASA Bente Lilja Bye, Norway/BLB

Task Objective Encourage national governments and international organizations to address GEOSS Science & Technology needs in their R&D programmes, through: Identification of potential resource providers (in the public and private sector) Identification of needs (continuities, gaps, resources, etc.) Bringing those two elements together in a forum, for sharing information

Task Info The structure of the Task is: Output 1 Identified set of key S&T programmes Output 2 Identified set of key private Companies Output 3 Report on S&T gaps, priorities & continuity needs – the focus of this presentation Output 4 Effective forum/network of funding agencies This is the focus of Breakout Session B3: GEOSS S&T needs: Developing a processes for matching research funding & research teams (Tuesday pm)

Since September 2010 EC Co-lead went vacant ESA withdrew as task co-lead Plenary and Ministerial drained resources EGIDA slowly ramped up EC Co-lead assigned to EGIDA; Stuart Marsh Task Team member confirmation Still no final decision on private sector relationship Task Team telecon March 29 th –All objectives assigned to someone Currently being reviewed for resources and schedule Task Team telecon May 3 rd –Goal was to get a final schedule Next Team telecon May 31 st

Strategic Targets SBA/Transverse Area Tasks Information from ST questionnaire STC-led SBA reviews ST tasks, Roadmap, etc Gap analysis efforts GEO Org. Structures Information-gathering and Processing Relationships

Task-level Survey’s Questions (80% Response) 1.What scientific and/or technological components and/or developments are being used to complete this task? 2.Do you have sufficient expertise to complete the task? If not, what is missing? 3.Do you have sufficient resources to complete this task? If not, what do you need? (Resources can be defined as funding, data, in-kind support, personnel, or any other element.) 4.Are there any scientific or technology (or other) barriers or gaps that you foresee that might prevent you from completing this task within the Work Plan time frame? Please describe the need. 5.What continuity issues (if any) have you identified that should be addressed? (these could be sensor, modeling, technology, observation, or other relevant topic) 6.Please describe any science or technology (or other) priorities that have arisen during the completion of this task. 7.Please describe any other issues of relevance to your task that you believe may be of interest to the STC.

Objectives behind survey Identify common inputs, outputs or methodologies across (sub)tasks Explore complementarities across (sub)tasks Identify options for better connecting existing systems (observing, modeling, info) and/or those system’s outputs (data, products, info) Launch practical actions for fostering new and existing interactions Evaluate the extent to which existing products, tools, systems and services are already registered in GEOSS Common Infrastructure Identify obstacles to registration and options to overcome them Evaluate extent to which data/information already shared within GEO Identify obstacles to data-sharing and options to overcome them Strengthen connections with Committees and Communities of Practice Improve Overarching Task and sub-task descriptions/contents Suggest mergers of relevant sub-tasks to improve coordination and reduce duplication

Future work Analysis requires experts – we need experts! –Each SBA –Each Transverse area Other inputs will be incorporated –US-09-01a reports –SBA analysis within STC –Other related studies (e.g., ESA study for IGFA) Continued (frequent) contact with STC to fine-tune the relationship with the S&T Roadmap

GEO Work Plan Proposed New Task ID-02 Catalyzing Resources for GEOSS Implementation

ID-02 Version 0 Catalyzing Resources for GEOSS Implementation Definition Leverage resources for Earth observation capacity building efforts. Ensure the engagement and committed involvement of resource providers in the GEO capacity building process (Capacity Building Strategic Target). Advocate funding of multinational projects to leverage the end-to-end value of observations including the establishment of necessary infrastructure (GEOSS 10- Year Implementation Plan, p.13).

Deliverables / Objectives 1. Resource mobilization for capacity building – individual, institutional and infrastructure (e.g. through the implementation of the Seville Roadmap, Call for Proposals) 2. Resource mobilization for Research and Development (e.g. encourage national governments and international organizations to address GEOSS science and technology needs in their Research and Development programmes) Resources Available for Implementation (current status and in planning) Egida (EU's FP7) GeoNetGab (EU's FP7)

Thank you!