Retrofitting Suburbia CIDs as a Partner in Progress April 9, 2009 Brett Harrell, Executive Director Evermore Community Improvement District 2463 Heritage.

Slides:



Advertisements
Similar presentations
Steel Valley Intergovernmental Initiative: The Boroughs of Homestead, West Homestead and Munhall.
Advertisements

Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Project Background and Objectives
GreenPlan Downtown Design and Greenberg Development Services Report.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Strategic Development Concept Enterprise, Alabama Planning Objectives for 2005 : Devise a physical vision—a strategic concept for development and conservation.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Contact: Beth Morris
Georgia Transportation Infrastructure Bank (GTIB) Bert Brantley Deputy Executive Director State Road and Tollway Authority MAY 2013 STATE ROAD AND TOLLWAY.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
Pass-through Fund and Grant Programs Update A Presentation by John Hemiup Senior Transportation Engineer October 2012.
The 21 st Century Vision Plan for Old Town Lawrence Group | Kubilins Transportation Group | Rose & Associates.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
ANNUAL REPORT MANY CULTURES, ONE BRIGHT FUTURE! Board of County Commissioners August 19, 2014.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
Georgetown Planning Board State of the Town April 6, 2009.
Borrowing Creative Financial Concepts from The Private Sector: Tax Districts Dallas, Texas October 10, 2006 Federal Reserve Bank of Dallas and Aspen Institute.
FY 2011 TPB TIGER Grant Application TPB Technical Committee Eric Randall September 9, 2011.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Madisonville Events/Programs to Look for: Madisonville Bicentennial Madisonville Bicentennial Neighborhood Stabilization Program (NSP*) Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Summary of Community Needs (p.9) Community input was gathered through advisory committee and community meetings. Advisory committee meetings were held.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
Established April 2000 DAYTON DRAGONS MINOR LEAGUE BASEBALL.
City of Tallahassee Community Redevelopment Agency Success Stories January 11, 2012 Michael Parker, Executive Director, Tallahassee Community Redevelopment.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
On the Road to a New Metropolitan Transportation Plan Spokane Regional Health District Board of Health April 25, 2013.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Community Development Department Construction Phase BULLDOG DRIVE.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
ANNUAL REPORT MANY CULTURES, ONE BRIGHT FUTURE! Board of County Commissioners September 15, 2015.
SR 436 / SR 50 Area Redevelopment Plan Board of County Commissioners February 24, 2009 Board of County Commissioners February 24, 2009.
Improvement Public Open House Presentation July 9, 2015 Community Project Plan Puslinch.
109th Street: The Bridge District1. The Bridge District A bold vision for the redevelopment of the 109 th Street corridor.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
STATE ROAD 100 CRA Update to City Council November 13, 2012 Workshop.
ROBERT LANG, PH.D. | PROFESSOR & EXECUTIVE DIRECTOR BROOKINGS MOUNTAIN WEST | THE LINCY INSTITUTE GREENSPUN COLLEGE | UNIVERSITY OF NEVADA, LAS VEGAS LEARNING.
MED SR 18 Corridor Project MED PID October 13, 2015.
1 McMaster Innovation Park Executing on a Vision Presentation to the Kirkendall Neighbourhood January 10 th, 2008 Zach Douglas.
Vision for Menomonee River Valley Economically, with strong companies and jobs near workers’ homes; Geographically, with renewed ties to the surrounding.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
The Reno Streetcar March 8, 2016 RTC 2040 Regional Transportation Plan Economic Development Forum.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Emergency Preparedness Complete Neighborhoods Preservation of City Assets Equity & Opportunity Stabilization Budget City of Portland FY Budget.
 Overview of Project  Economic Development Tools  Municipal Management Districts  Tax Increment Reinvestment Zones  Session Review, Q&A.
Lexington Road Corridor Transportation Plan Public Meeting #1 October 7, 2014 Welcome!! And Thank You for Coming Out.
Complete Streets Training Module 4b – Designing for All Users.
Council for Quality Growth North Fulton Advisory Meeting
Project Status & Right-of-Way Acquisition
Urban Renewal and Tax Increment Financing
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Skillman Corridor TIF District
Urban Renewal Proposal
SANDY SPRINGS CITY COUNCIL MEETING
ROOSEVELT CITY GENERAL PLAN 2010
Responsibilities and FUNDING
Early Voting Starts Oct. 20 | Election Day Nov
Comprehensive Transportation Plan
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Presentation transcript:

Retrofitting Suburbia CIDs as a Partner in Progress April 9, 2009 Brett Harrell, Executive Director Evermore Community Improvement District 2463 Heritage Village, Suite 106 Snellville, GA (770)

A Vibrant Corridor, but...

Traditional Development Strip Centers, Traffic, Decline, No Sense of Place

Public Investment Underutilized Retail to Community Identity $10 million public investment launches $100 million in private development Recaptured gray field, vacant big box, environmental spill, mortgage in default, required a land swap, and non-debt financing

CIDs encourage Private Investment Towne Centre – office development $10m First Global – multi-story office buildings $30m Morsberger Group – mixed-use development $40m Solid Rock Development – medical complex $60m Combined value of smaller developments – $50m

Key Accomplishments Hwy 78 (now Evermore) CID formed April 2003 – 390 commercial property owners; $380 (now $525) million in property value; 1,200+ businesses; $1 billion in annual sales; 15,800 jobs Evermore CID provides ongoing, weekly landscape maintenance and litter removal at an investment of $110,000 per year –Recognized by Gwinnett Clean and Beautiful in January 2006 as their Business and Industry of the Year –Support Gwinnett County Operation Fixing Broken Windows and City of Snellville Property Maintenance Initiatives Evermore CID provides additional public safety patrols along the corridor on average an additional 2,500 hours a year The nearly $5 million investment made by CID taxpayers over the past five years has resulted in an additional $130 million investment by federal, state, and local partners to provide an approximate 26:1 return on investment Adopted a Short Term Work Program in December 2005 describing 82 ongoing and potential projects with a combined investment exceeding $165 million

Evermore CID Projects Parallel Circulator Routes and Inter-Parcel Access –Paxton Lane Extension (under construction) –Rockbridge Road to Davis Road (in design) –Parkwood Road to Britt Road (in design) –Hewatt Road to Parkwood Road (in design) Intersection Improvements –McGee Road at U.S. 78 (approved concept report) –Highpoint Road at U.S. 78 (completed) –U.S. 78 at S.R. 124 (in design) –Walton Court at U.S. 78 (waiting NTP) Pedestrian Safety –Over 14 miles of new sidewalk (under construction) –Pedestrian Bridge crossing the Yellow River (let June ‘09) Technology Enhancements –ITS / ATMS, signal synchronization, real-time traffic data, video and radar detection (complete) –Mast Arm signal supports and illuminated street signs (under construction) Landscape and Streetscape Beautification –Landscaped medians and enhanced plantings at five key nodes (under construction) –Street furniture and wayfinding signage (under construction and design) Pedestrian Bridge crossing the Yellow River

Landscape Enhancements Medians and Key Nodes Streetscape enhancements include landscaping, sidewalks, planted medians, wayfinding signage, street furniture, and decorative mast arms

Parallel Access Roads Paxton Lane Extension Paxton Lane Extension – connects two signalized intersections with two median openings, provides for dedication of a private street to public use, and removes 5 curb cuts on US 78 improving safety and reducing congestion. Improvement supports recently announced redevelopment plan valued at $60 million over 10 years.

$60 Million Medical Campus Evermore Urgent Care A $60 million medical campus being mapped out for Stone Mountain could include a first in the Southeast — a freestanding, acute care hospital focused on emergency medicine. Plans for the campus call for a 50,000-square-foot hospital, an assisted- living center and three medical office buildings that would house specialty practices, including gastroenterology, neurology and cardiology.

A Corridor in Transformation From a confusing and cluttered corridor with overhead directional signage to a clean, safe corridor with 14 miles of new sidewalks, pedestrian crossings, decorative mast arms, and illuminated street signs

Attracting Reinvestment Town Centre Office Park CID sidewalk package includes pedestrian crossing signals, street furniture, and sign toppers. Brookwood Village at Evermore Townhomes Premiere Dermatology Center Corporate relocations provide day-time employment

CIDs – Power of Partnership Federal, State, and Local Governments Departments of Transportation MPO’s Private Investment