Doc.: IEEE 802.11-01/324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.

Slides:



Advertisements
Similar presentations
3GPP's co-operation with the ITU Dr
Advertisements

LME/DMU Inge Jonsson 1 ITU - TSB Informal Consultations Document No. 9 Martigny, February 2000 Source:ERICSSON (Mr. I. Jönsson) Title.
4.1 [0] Criteria for Successful Consolidation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 14 1 All you always wanted to know about.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 1 1 All you always wanted to know about.
Fabio Leite, IMT-2000 Project Manager International Telecommunication Union (ITU) Emergency Telecommunications Workshop February.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
Implementation of Leader Axis measures by Jean-Michel Courades AGRI-F3.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
M2M Global Initiative OneM2M April 24, 2012
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
IMPLEMENTING THE WSIS ACTION PLAN NAIROBI, March 2004 Jose Toscano Director, External Affairs International Telecommunications Satellite Organization.
10/10/2015 GSC8 Resolutions 11 Resolutions Joint 3, GRSC 5, GTSC 1, IPR 1, UWG 1 1GSC-9, Seoul SOURCE:TTA TITLE:GSC8 Resolutions AGENDA ITEM:Opening Plenary.
1 ANSI Conference on U.S. Leadership in ISO and IEC Presented by Mr. Steven P. Cornish Director, International Policy American National Standards Institute.
Implementation of EU Electronic Communication Directives.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
3GPP
1 International Telecommunication Union ITU CHALLENGES AND RESPONSES (Fabio Bigi – TSB Deputy Director) (
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
Third Generation Developments RADIOCOMMUNICATIONS AGENCY A presentation for the Mobile Services Committee RA2/PTN Radiocommunications Agency.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
Summary of main questions on the Partnership Agreement and the secretariat support.
© 2004 The IPR-Helpdesk is a project of the European Commission DG Enterprise, co-financed within the fifth framework programme of the European Community.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Doc.: IEEE /0730r0 Submission July 2005 Stefano M. Faccin, NokiaSlide 1 3gpp2-liaison-report-july-2005 Notice: This document has been prepared.
Introduction to 3GPP Specification & new Trends in Radio Networks
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-GTSC6-10 FOR:Presentation SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
Ukraine (nr 46514): Expert Mission on Supervision of Investment Funds` Activities - TAIEX On-site supervision of the investment funds industry in Poland.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
GRI SSE Work Plan Project proposal of HEA
Updating the Regulation for the JINR Programme Advisory Committees
SADC WRC-15 Preparatory Meeting
Global Standards Collaboration (GSC) GSC-15
ISO Partnering & Twinning
Roadmap to Enhanced Technical Regulations of WMO
5G Architecture Standardization Landscape in 3GPP
ITU-T – ITS PROCESS, PRODUCTS AND SERVICES
GRI SSE Work Plan Project proposal of HEA
Table of Contents (1) 31 January 2001
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB
Update of ARIB Activities on IMT Standardization
ARIB Standards Development for Broadband Wireless Access systems
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
Malcolm Johnson, Director, Telecommunication Standardization Bureau
3gpp-liaison-report-may-2005
Presentation transcript:

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, December 1998 ARIB, ETSI, T1, TTA and TTC agreed to this Partnership Project Description. THIRD GENERATION PARTNERSHIP PROJECT (3GPP)

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 2 Preamble Standards organizations and other related bodies have agreed to co-operate for the production of a complete set of globally applicable Technical Specifications for a 3rd Generation Mobile System based on the evolved GSM core networks and the radio access technologies supported by 3GPP partners (i.e., UTRA both FDD and TDD modes). The Project is entitled the “Third Generation Partnership Project” and may be known by the acronym “3GPP”. 3GPP has been established for the preparation and maintenance of the above mentioned Technical Specifications, and is not a legal entity.

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 3 Definition of the Third Generation Partnership Project 3GPP will provide globally applicable Technical Specifications for a 3rd Generation Mobile System based on the evolved GSM core network, and the Universal Terrestrial Radio Access (UTRA), to be transposed by relevant standardization bodies (Organizational Partners) into appropriate deliverables (e.g., standards).

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 4 Partnership and Membership 3GPP comprises of: Partners: – Organizational Partners 3GPP is open to all standards organizations irrespective of the geographical location. – Market Representation Partners Individual Members

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 5 Project Co-ordination Group Technical Specification Groups Support Functions 3GPP PARTNERS Organizational Partners Market Representation Partners Organizational Partners’ Standardization Process Organizational Partners’ deliverables Technical Specifications INDIVIDUAL MEMBERS Technical Contributions ITU International Recommendations IMT 2000 Contributions via existing processes Regulators / Governments Mandates

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 6 Scope and objectives (1) The Technical Specifications will be developed in view of global roaming and circulation of terminals. The 3rd Generation Mobile System and its capabilities will be developed in a phased approach. Initially, 3GPP will elaborate, approve and maintain the necessary set of Technical Specifications for the first phase of a 3rd Generation Mobile System including: UTRAN (including UTRA; W-CDMA in Frequency Division Duplex (FDD) mode and TD-CDMA in Time Division Duplex (TDD) mode) 3GPP Core Network (Third Generation networking capabilities evolved from GSM. These capabilities include mobility management and global roaming.) Terminals for access to the above (including specifications for a UIM) System and service aspects

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 7 Scope and objectives (2) The set of global specifications for the first phase of the 3GPP core network and the specifications for the GSM core network should be common to the largest extent possible and should not be needlessly different. The results of the 3GPP work will form the basis of member contributions to the ITU in accordance with existing procedures. 3GPP will take account of emerging ITU recommendations on interworking between IMT-2000 family members. In the framework of agreed relationships, 3GPP will elaborate Technical Specifications that will form the basis of standards, or parts of standards, of the Organizational Partners.

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 8 Documentation for 3GPP The Partnership Project Agreement a concise legal document signed by participating Partners (or their sponsor) contains the minimum legal text necessary for 3GPP to function correctly. The Partnership Project Description The Partnership Project Working Procedures The following 3 documents describe 3GPP:

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 9 The Partnership Project Agreement (2) to encourage their members to contribute to the common set of Technical Specifications and to avoid duplication of workto encourage their members to contribute to the common set of Technical Specifications and to avoid duplication of work to convert / transpose / adopt all relevant Technical Specifications resulting from 3GPP into their own relevant deliverables through their normal processesto convert / transpose / adopt all relevant Technical Specifications resulting from 3GPP into their own relevant deliverables through their normal processes to identify as early as possible, any national / regional regulatory requirements that may lead to options within the Technical Specificationsto identify as early as possible, any national / regional regulatory requirements that may lead to options within the Technical Specifications to make their IPR Policy available for considerationto make their IPR Policy available for consideration The Partnership Project Agreement includes obligations on Organizational Partners to commit themselves to the 3GPP scope:

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 10 The Partnership Project Agreement (3) The Partnership Project Agreement includes obligations on Market Representation Partners to identify market and service requirement of 3GPP and to contribute to: the promotion of 3GPPthe promotion of 3GPP the definition of 3GPP System and Service scenariosthe definition of 3GPP System and Service scenarios The Market Representation Partners should also encourage their members to contribute to the common objectives of 3GPP and to avoid duplication of work.

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 11 Resource requirements for establishing 3GPP ETSI will absorb the initial cost of establishing the 3GPP, if required. Thereafter, the costs will be shared by the Organizational Partners. There will be no direct 3GPP membership fee for Individual Members. Partners and Individual Members may provide support functions to the extent that they are able (eg hosting of meetings and provision of Secretariat support). The longer term financial requirements are for further study.

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 12 Principles for decision making within 3GPP Decision making within PCGs By consensus amongst the Organizational Partners By vote amongst the Organizational Partners in unavoidable cases Decision making within TSGs By consensus amongst the Individual Members By vote amongst the Individual Members in unavoidable cases The Organizational Partners will conduct a fairness review of the decision making process six months after 3GPP start-up, taking into account all concerns raised (Note: voting will not be permitted on National/Regional regulatory requirements)

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 13 Principles for voting within TSGs The following principles will be applied for voting within the TSGs One “Individual company Member”, one vote Organizational Partners to interpret “ Individual company Member” according to its own rules of membership The PCG will maintain a register of eligible voters for the TSGs Each Individual Member may carry the proxy for up to five other Individual Members

Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 14

PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, December 1998 ARIB, ETSI, T1, TTA and TTC agreed this Partnership Project Description. THIRD GENERATION PARTNERSHIP PROJECT (3GPP)