RIPARIAN TREE PLANTING City Stream Watch 2006. SAWMILL CREEK Phase II Rehabilitation Project.

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Overton Park Neighborhood Association Parks & Trails Committee.
Riparian Zone Habitat Assessment Vegetation and More.
Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
Ghost River Watershed Riparian Health Inventory 2011 Highlights March 10, 2012 Benchlands, AB.
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
The impact of urbanisation and changing lifestyles.
Aquascaping November 14, 2006 Country Creek HOA Manatee County.
Ground Beetles and Butterflies of Corn and Old Field Areas Along a NE Iowa Trout Stream Before Riparian Habitat Reconstruction Kirk J. Larsen Department.
Rainwater Harvesting Methods. What do we need to do with water? Slow it, Spread it, Sink it!
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
RIVER FORMATION EARTH’S GRAVITATIONAL FORCE PULLS OBJECTS TOWARD IT’S CENTER OF MASS. WATER FALLING DOWN A SLOPE IS EVIDENCE OF GRAVITY. AS OBJECTS DROP.
Peirce Secondary Bishan Heritage Trail Done by: Peirce sec Alex Alroy Brigitte Megan Rahel Nathan Li Teik Gerald Tzu Yun.
SIMPSON FARM BY: KHUSHARTINI KAMARULZAMAN ANAHI BOJORQUEZ.
Bioassessment 1.0. Stream Visual Assessment Protocol 1. Turbidity 2. Plant growth 3. Channel Condition 4. Channel Flow Alteration 5. Percent Embeddedness.
Amy Sheldon Watershed Coordinator February 3, 2004.
This training was prepared by the U.S. Department of Agriculture (USDA) team of Sarah Librea-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Second Grade English High Frequency Words
CITY STREAM WATCH 2007 RIPARIAN PLANTING INITIATIVE May 2007.
ENGLISH IVY ( Hederahelix ) -Perennial, evergreen vine - Native to Caucasus Mountain region of Central Eurasia - Introduced to North America in Over.
Parking Lot 53 Hydraulic Analysis Aaron Gutierrez Aaron Libson William Ryman Alejandro Valenzuela.
Humans Impacts on Land Objective 2.07
Streams and Rivers.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
All that remained of a willow opposite City Hall this spring! Vibrant Exciting Nature on our doorsteps. Striving to be our best!
+ What Exactly Does Acid Rain Affect? Courtney Schweers 3 rd Hour.
Sight Words.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
LOGGING FORESTS Chapter Logging Forests Forests regulate climate by recycling water and carbon dioxide. transpirationOn hot days a large tree may.
By : Caroline Oldstone – Moore, Devina Mehta, Jillian Frost
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
The River Clwyd Chapter 3 Does the river change over time? Next Page.
Elements of the water cycle Important terms: Condensation, Evaporation, Transpiration, Groundwater, Precipitation, Surface Runoff, Water Table.
Understanding Creeks, Rivers, and Riparian Areas.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
 Invasive Species ◦ Autumn Olive (Eleagnus umbellata)  Monoculture ◦ Loss of Biodiversity ◦ Loss of Habitat  Choking out local growth.
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
Friends of Dinosaur Park : Erosion Control Project BY: Aleksander, Enshaal, Noah, Anthony, Haseeb, Alondra, Erin.
EROSION- The transport of weathered materials…. Major Erosive Agents: Running Water GLACIERS WIND OCEAN CURRENTS AND WAVES MASS WASTING (GRAVITY!)
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
High Frequency Words.
Importance of Soil & Succession Science 10. Urban Sprawl  Over the past few decades, the general trend of has seen the population move from rural areas.
Watersheds This is an area where rain joins together to flow into streams, rivers, lakes, or wetlands. This is the drainage basin. The watershed boundary.
Area of Interest 1.Uncontrolled runoff from impervious surfaces 2.Unstable banks 3.Undercut banks 4.Massive erosion 5.Loss of biotic integrity.
Great Miami and Loramie Creek By: Kathryn Reed, Sarah Ambach, and Xiaojing Wu Great Miami Loramie Creek By: Kathryn Reed, Xiaojing Wu, and Sarah Ambach.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
E.S.P.N. Everyone Stop Pollution Now. How It Started! On February 22, 2007 the 8th grade TAG Science class was presented by their teachers with an article.
Red Streams Blue School Program A project of the Brandywine Valley Association.
Black Creek Streambank Stabilization Projects
Mason Gulch landscape Management plan Public meeting
VOLUNTEER TRAINING FOR MACROINVERTEBRATE MONITORING
Tamarix (Salt Cedar) Salt cedar or tamarisk (Tamarix spp.) was quarantined by the Kansas Department of Agriculture in 2004 and has currently displaced.
Power of a Rain drop.
The Gila River Restoration at Apache Grove
3rd Grade Plant Project.
Land Use in a Watershed Unit 1: The Hydrosphere.
LENTIC GEOMORPHOLOGY.
Riparian Vegetation.
White River and Richland Creek Watershed Opportunity Assessment
#1. LIKE YOURSELF The first self improvement tip is learning to love yourself. Unfortunately for many, this is easier said than done. You have to learn.
Depot Park, Clarkston West Bank Restoration.
Presentation transcript:

RIPARIAN TREE PLANTING City Stream Watch 2006

SAWMILL CREEK Phase II Rehabilitation Project

Sawmill Creek – Phase II May 6 th, 2006 Phase II planting on Sawmill Creek hopes to further rehabilitate a failed bank on the east side of the stream. Phase I was carried out in May of 2005, though it seemed more vegetation was still needed in the upper sections of the bank. In Phase II we planted more vegetation on the upper sections of the bank failure and also filled in the holes missed last year.

Sawmill Creek – Phase II Twelve volunteers planted 600 trees on this failed bank on Sawmill Creek

Sawmill Creek – Phase II Even though it was a rainy day which made working in clay difficult, volunteers made the best of it and had a great time.

Sawmill Creek – Phase II # of trees planted by volunteers: Red Osier Dogwood Nannyberry White Cedar - 50 White Spruce

Sawmill Creek – Phase II In total 12 volunteers gave 32 hours of service helping to plant 600 trees on the bank of Sawmill Creek to complete Phase II of the rehabilitation project.

Sawmill Creek – Phase II Here are some pictures of some of the volunteers who made this project happen

Sawmill Creek – Phase II After a successful day of planting the site looked better than ever

Sawmill Creek – Phase II

This site will be monitored over the course of the summer to determine if more planting will be necessary Thanks to all those volunteers who participated and didn’t mind getting dirty.

GRAHAM CREEK Rehabilitation Project

Graham Creek – May 8 th, 2006 High water is eroding the bank along Graham Creek at Andrew Haydon Park causing loss of vegetation and possible siltation. Siltation can affect fish spawning and nursery habitat therefore trees will be planted along the eroded bank to help re- vegetate the site and stabilize the soil.

Graham Creek On May 8 th two volunteers helped to plant 50 Red Osier at this site

Graham Creek It may not have been as big a project as Sawmill Creek but these volunteers were happy to help make any difference they could.

Graham Creek

This small project hopes to begin establishing a root system and promoting natural growth of other plants to stabilize the bank from further erosion. As this site runs through a city park, it will also help bring the aesthetic beauty of a natural stream bank back to this stretch of stream

MOSQUITO CREEK Rehabilitation Project

Mosquito Creek The planting site on Mosquito Creek is in the Riverside South community and has been under heavy development over the past few years. Where Mosquito Creek crosses under Spratt Rd. there has been some erosion due to stream alteration With this planting we hope to further rehabilitate this area by planting trees in the riparian zone to establish root systems in the loose soil to stop the erosion problem

Mosquito Creek

After a few hours of planting the site was full of new seedlings

Mosquito Creek Volunteers who were happy to lend a hand

Mosquito Creek Species planted at this site were: Nannyberry - 50 Bur Oak

Mosquito Creek Planting was done on May 9 th, 2006 and 150 trees were planted by 2 volunteers.

City Stream Watch 2006 A huge THANK YOU goes out to the 16 volunteers who made each of these projects possible. In total 800 trees were planted on 3 different stream systems. Thank you for making another Stream Watch project a success!!

City Stream Watch 2006 For more information on this project or if you would like to get involved with the program please contact: Grant Nichol City Stream Watch Co-ordinator (613) ext