Standard Costing: A Managerial Control Tool

Slides:



Advertisements
Similar presentations
MANAGEMENT ACCOUNTING
Advertisements

Chapter 11 Standard Costs and Variance Analysis
CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Standard Costing: A Managerial Control Tool Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
14-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Standard Costing: A Managerial Control Tool 14 PowerPresentation® prepared by David.
9-1 Standard Costing: A Functional- Based Control Approach Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University.
Standard Costing and Variances
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Managerial Accounting by James Jiambalvo Chapter 9: Standard Costs and Variance Analysis Slides Prepared by: Scott Peterson Northern State University.
Standard Costing and Variance Analysis
Chapter 7: Standard Costing and Variance Analysis
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 10 Standard Costing: A Managerial Control Tool
VARIANCE ANALYSIS 1 LECTURE 8.
Standard Costing 标准成本法 -- A Managerial Control Tool
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Standard Costs.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Variance Analysis Topic Six by Dr. Ong Tze San
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Standard Costing A control tool. 1.How unit input standards are developed 2.Why standard cost systems are adopted 2.Purpose of a standard cost sheet 3.Compute.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 10 Standard Costs and the Balanced Scorecard.
Flexible Budgeting Chapter 07, 08
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
1 Copyright © 2008 Cengage Learning South-Western. Heitger/Mowen/Hansen Flexible Budgets and Overhead Analysis Chapter Nine Cornerstones of Managerial.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Performance Evaluation and Using Variances Chapter M6.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
Standard Costing and Variance Analysis
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
1 Copyright © 2008 Cengage Learning South-Western. Heitger/Mowen/Hansen Standard Costing: A Managerial Control Tool Chapter Eight Fundamental Cornerstones.
Cornerstones of Managerial Accounting 2e Chapter Nine
Standard Costs and Variances
20 Monitoring Performance in Cost, Profit and Investment Centers
Journal Entries to Record Variances
General Journal Entries to Record Variances
Copyright © 2013 Nelson Education Ltd.
Pertemuan 7 Standard Costs.
MANAGEMENT ACCOUNTING
Foundations and Evolutions
Standard Costs and Variances
© 2017 by McGraw-Hill Education
AMIS 212 Introductory Managerial Accounting
Journal Entries to Record Variances
STANDARD COSTING A MANAGERIAL CONTROL TOOL Slides by: Perpetua D. Cahayag.
© 2017 by McGraw-Hill Education
Presentation transcript:

Standard Costing: A Managerial Control Tool CHAPTER

After studying this chapter, you should be able to: Objectives 1. Tell how unit standards are set and why standard costing systems are adapted. 2. State the purpose of a standard cost sheet. 3. Describe the basic concepts underlying variance analysis, and explain when variances should be investigated. 4. Compute the material and labor variances, and explain how they are used for control. After studying this chapter, you should be able to: Continued

Objectives 5. Calculate the variable and fixed overhead variances, and give their definitions. 6. Appendix: Prepare journal entries for materials and labor variances, and show how to account for overhead variances.

Cost control often means the difference between success and failure.

Why Standard Cost Systems Are Adopted Standard costing systems enhance planning and control and improve performance measurement. Standard costing systems facilitate product costing.

Cost Assignment Approaches Manufacturing Costs Direct Direct Materials Labor Overhead Actual costing system Actual Actual Actual Normal costing system Actual Actual Budgeted Standard costing system Standard Standard Standard

Standard Cost Sheet for Corn Chips Standard Standard Standard Price Usage Cost Subtotal Description Direct materials: Yellow corn $0.006 18 oz. $0.108 Cooking oil 0.031 2 oz. 0.062 Salt 0.005 1 oz. 0.005 Lime 0.400 0.01 oz. 0.004 Bags 0.044 1 bag. 0.044 Total direct materials $0.223

Standard Cost Sheet for Corn Chips Standard Standard Standard Price Usage Cost Subtotal Description Direct materials $0.223 Direct labor: Inspectors $7.000 0.0070 hr. $0.049 Machine operators 10.000 0.0008 hr. 0.008 Total direct labor 0.057 Overhead: Variable overhead 3.850 0.078 hr. $0.030 Fixed overhead 32.050 0.0078 hr. 0.250 Total overhead 0.280 Total standard unit cost $0.560

The standard quantity of yellow corn meal per package is 18 ounces. During the first week of March, 100,000 packages of corn chips are produced. The standard quantity of yellow corn meal per package is 18 ounces.

Standard Quantity of Materials Allowed Standard Hours Allowed SQ = Unit quantity standard x Actual output = 18 x 100,000 = 1,800,000 ounces Standard Hours Allowed SH = Unit labor standard x Actual output = 0.0008 x 100,000 = 80 direct labor hours

Total variance = Price variance + Usage variance = (AP – SP)AQ + (AQ – SQ)SP = [(AP x AQ) – (SP x AQ)] + [(SP x AQ) – (SP x SQ)] = (AP x AQ) – (SP x AQ)] + (SP x AQ) – (SP x SQ) = (AP x AQ) – (SP x SQ)

Variance Analysis: General Description 1. AP x AQ (Actual Quantity of Input at Actual Price) 2. SP x AQ (Actual Quantity of Input at Standard Price) 3. SP x SQ (Standard Quantity of Input at Standard Price) Price Variance (1-2) Usage Variance (2-3) Budget Variance (1-3)

Favorable variances occur whenever the opposite occurs. Unfavorable variances occur whenever actual prices or usage of inputs are greater than standard prices or usage. Favorable variances occur whenever the opposite occurs.

Control Chart Cost x $110,000 $100,000 $ 90,000 Time

Variance Analysis: Materials and Labor Actual production 48,500 bags of corn chips Actual cost of corn 780,000 ounces of $0.0069 = $5,382 Actual cost of inspection labor 360 hours at $7.35 = $2,646 Actual Costs Budgeted Costs Total Variance Corn $5,382.00 $5,238.00 $144.00 U Inspection labor 2,646.00 2,376.50 269.50 U

Variance Analysis: Columnar Approach AQ x AP 780,000 x 0.0069 $5,382 AQ x SP 780,000 x $.0.0060 $4,680 SQ x SP 873,000 x $0.0060 $5,238 $702 U Price Variance $558 F Usage Variance $144 U Total Variance

MPV = (AP – SP)AQ Material Price Variance The actual price per unit The standard price per unit The actual quantity of material used

Material Price Variance MPV = (AP – SP)AQ = ($0.0069 – $0.0060)780,000 = $0.0009 x 780,000 = $702 U Percent of SP x SQ = $702/$4,680 = 15%

MUV = (AQ – SQ)SP Direct Materials Usage Variance The actual quantity of materials used The standard quantity of materials allowed for the actual output The standard price per unit

Direct Materials Usage Variance MUV = (AQ – SQ)SP = (780,000 – 873,000)($0.006) = 93,000 x $0.006 = $558 F Percent of SQ x SP = $558/$5,238 = 10.7%

LRV = (AR – SR)AH Labor Rate Variances The actual hourly wage rate The standard hourly wage rate The actual direct labor hours used

Percent of SR x SH = $126/$2,520 = 5% Labor Rate Variances LRV = (AR – SR)AH = ($7.35 – $7.00)360 = $0.35 x 360 = $126 U Percent of SR x SH = $126/$2,520 = 5%

Labor Variances: Columnar Approach AH x AR 360 x $735 $2,646 AH x SR 360 x $7.00 $2,520 SH x SR 339.5 x $7.00 $2,376.50 $126 U Rate Variance $143.50 U Efficiency Variance $269.50 U Total Variance

LEV = (AH – SH) SR Labor Efficiency Variances The actual direct labor hours used The standard direct labor hours that should have been used The standard hourly wage rate

Percent of SH x SR = $143.50/$2,376.50 = 6% Labor Efficiency Variances LEV = (AH – SH)SR = (360 – 339.5)$7 = 20.5 x $7 = $143.50 U Percent of SH x SR = $143.50/$2,376.50 = 6%

Variable Overhead Variances Variable overhead rate (standard) $3.85/DLH Actual variable overhead costs $1,600 Actual hours worked 400 Bags of chips produced 48,500 Hours allowed for production 373.3 Applied variable overhead $1,456

Variable Overhead Variances: Columnar Approach Actual VO $1,600 VO Rate x Actual Hours $1,540 VO Rate x Standard Hours $1,456 $60 U Spending Variance $84 U Efficiency Variance $144 U Total Variance

VOSV = (AVOR x AH) – (SVOR x AH) Variable Overhead Spending Variances VOSV = (AVOR x AH) – (SVOR x AH) = (AVOR – SVOR)AH = ($4.00 – $3.85)400 = $60 U

Flexible Budget Performance Report For the Week Ended March 8, 2004 Crunch Chips, Inc. Flexible Budget Performance Report For the Week Ended March 8, 2004 Cost Formula Actual Costs Spending Variance Budget Gas $3.00 $1,190 $1,200 $10 F Electricity 0.78 385 312 73 U Water 0.07 25 28 3 F Total cost $3.85 $1,600 $1,540 $60 U

For the Week Ended March 8, 2004 Crunch Chips, Inc. Performance Report For the Week Ended March 8, 2004 Budget for Standard Hours Cost Formula Actual Costs Spending Variance EfficiencyVariance Budget Gas $3.00 $1,190 $1,200 $10 F Electricity 0.78 385 312 73 U Water 0.07 25 28 3 F Total cost $3.85 $1,600 $1,540 $60 U $1,135 $65 U 295 17 U 26 2 U $1,456 $84 U

Fixed Overhead Variances Budgeted or Planned Items Budgeted fixed overhead $749,970 Practical activity 23,400 direct labor hours Standard fixed overhead rate $32.05 Hours allowed to produce 3,000,000 bags of chips: 0.078 x 3,000,000 = $23,400 Actual Results Actual production 2,750,000 bags of chips Actual fixed overhead cost $749,000 Standard hours allowed for actual production 21,450

Total Fixed Overhead Variances Applied fixed overhead Standard fixed overhead rate x Standard hours = = $32.05 x 21,450 = $687,473 (rounded) Total fixed overhead variance $749,000 – $687,473 = = $61,527 underapplied

Fixed Overhead Variances: Columnar Approach Actual FO $749,000 Budgeted FO $749,970 Applied FO $687,473 $970 F Spending Variance $62,497 U Volume Variance $61,527 U Total Variance

Crunch Chips, Inc. Performance Report For the Year Ended 2004 Fixed Overhead Items Actual Costs Budgeted Cost Variance Depreciation $530,000 $530,000 $ ---- Salaries 159,370 159,970 600 F Taxes 50,500 50,000 500 U Insurance 9,130 10,000 870 F Total fixed overhead $749,000 $749,970 $970 F

Volume Variance Volume variance = $32.05(23,400 – 21,450) = ($32.05 x 23,400) – ($32.05 x 21,450) = $749,970 – $687,473 = Budgeted fixed overhead – Applied fixed overhead = $62,497 U

Appendix: Accounting for Variances

Material Price Variance The actual price is $0.0069 per ounce of corn and standard price is $0.0060, and 780,000 ounces of corn are purchased. Materials Inventory 4 680 00 Materials Price Variance 702 00 The receiving report and the invoice are used to record the receipt of the merchandise and to control the payment. Accounts Payable 5 382 00 Material Price Variance

Material Usage Variance During the period 780,000 ounces of corn is placed into production. The standard quantity is 873,000 ounces, and standard price is $0.006. Work in Process 5 238 00 Materials Usage Variance 558 00 The receiving report and the invoice are used to record the receipt of the merchandise and to control the payment. Materials Inventory 4 680 00 Material Usage Variance

During the period the firm has 360 actual inspection hours, while the standard hours for the units produced is 339.5 hours. The actual rate is $7.35 per hour while the standard rate is $7.00 per hour. Work in Process 2 376 00 Labor Efficiency Variance 143 50 Labor Rate Variance 126 00 The receiving report and the invoice are used to record the receipt of the merchandise and to control the payment. Accrued Payroll 2 646 00 Labor Variances

At the end of the year, the variances for materials and labor are usually closed to Cost of Goods Sold. Cost of Goods Sold 971 50 Material Price Variance 702 00 Labor Efficiency Variance 143 50 Labor Rate Variance 126 00 The receiving report and the invoice are used to record the receipt of the merchandise and to control the payment. Closing Variances

At the end of the year, the variances for materials and labor are usually closed to Cost of Goods Sold. Material Usage Variance 558 00 Cost of Goods Sold 558 00 The receiving report and the invoice are used to record the receipt of the merchandise and to control the payment. Closing Variances

Chapter Nine The End