DAR Library Lay Light Restoration A Special Message From President General Merry Ann T. Wright.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
Concrete Fooring & Roofing System
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
St Swithun’s Open Meeting 30 th June What is the state of the church? ( Hint, look around you) The architect’s report identified some urgent issues.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
The Library of Congress is the oldest national establishment for culture in the USA, and it is the most extensive library collection worldwide. The majestic.
Description of Problem:
PowerPoint ® Presentation Chapter 4 Flatwork Flatwork Applications Site Preparation Concrete Reinforcement Flatwork Procedures Joint Control Bleedwater.
Presented by Captain Bill Hamilton Friends of the Governor Stone, Inc.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
CE REPAIRS AND REHABILITATION OF STRUCTURES
R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC. Slide 1 GOSSAMER COVE Redwood City, CA Illustrated Preliminary Defect List Presented By: R.H. ADCOCK / ARCHITECT.
Condensation Piping and Installation Drain Pans
Common Architecture Terms. Fenestration The design and placement of windows in a building.
Ladders Can take you… to great heights or on a quick trip to the ground.
Climbing the Ladder to Safety
16 Flat ledges on the open truss ceiling are sites where dust and dead insects can collect and fall onto exposed product. Solution: Clean these areas on.
Objectives : ANALYZE home maintenance techniques.
Competency: Draw roof plans
INTERIOR WALL FINISHES
MODULE THREE – ROOF DECK AWARENESS. The employer shall determine if the walking/working surface on which its employees are to work have the strength.
Chapter 4: Air Leakage Control: Materials and Techniques
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Cracks in Concrete. 2-Classifications 2-Classifications 3-Concrete removal, preparation 4-References Cracks in Concrete 1-lntroduction.
-Lead in Architecture- Nehaa Haneef Loyola University Chicago Science and Society Introduction: Lead in Architecture A broad definition of architecture.
Installation Presentation
Precast Concrete Panels
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
INTRODUCTION Definition:
Installation. Indoor Unit Installation Typical Installation.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
Inspecting Structure Prepared By: Marcia Belcher.
Chapter 4 Lesson Goal After completing this lesson, the student shall be able to understand the effects of fire on common building materials and be able.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Project On Ethernet Cable Building & Video Recording James Maclean & Stephen Craig.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Ventilation Skill Drills.
P ROJECT SHIKSHA Primary Tamil School Jalan Acob, Kapar.
TBWG Montreal, Quebec October 23, 2013 Greening of the Border Update A Land Port for the 21 st Century Van Buren, Maine.
Earthquake Hazards. Predictions Based on 2 factors: – Earthquake history in the area (only narrows down to a decade or a few years) – Rate at which strain/stress.
Safety on Call LADDER SAFETY. Safety on Call LADDERS CAN TAKE YOU… To great heights or on a quick trip to the ground.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
Chapter 21 Roof Plan Layout. 2 Links for Chapter 21 Lines and Symbols Materials Drawing Roof Plans.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
Construction materials Types and properties.. Types There are four types of construction materials: Metals – Examples? Non-metals – Examples? Synthetic.
INTERIOR DESIGN Ms. Cromartie Spring 2015 Mod
Greenhouse Design and Construction
CE UNIT 1  Maintenance is the act of keeping something in good condition by checking or repairing it regularly.
Group 8 Façade failure of the John Hancock Building.
Unit 4 Lesson 8 Earthquakes Copyright © Houghton Mifflin Harcourt Publishing Company.
Sigma Institute Of Engineering at Bakrol, Guided by:- Ratan Panchal Vikrant Prajapati Windows and ventilation Submitted By:- Rajput Ashish ( )
Exterior Maintenance and Cleaning
The Library of Congress is the oldest national establishment for culture in the USA, and it is the most extensive library collection worldwide. The majestic.
24172 Vista D Oro, Dana Point CA 92629
RCCS SAFETY REFRESHER TRAINING PROGRAM
APPLICATIONS OF TECHNOLOGY
Teknologi Dan Rekayasa
Objectives : ANALYZE home maintenance techniques
REPAIR AND REHABILITATION OF STRUCTURES
NFPA 600, INDUSTRIAL FIRE BRIGADE Module : 11 BUILDING CONSTRUCTION.
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Collapse Patterns.
Exterior Maintenance and Cleaning
Bunker Wall Design Wall ESS
Presentation transcript:

DAR Library Lay Light Restoration A Special Message From President General Merry Ann T. Wright

DAR National Headquarters

Iconic Architecture The striking exterior marble columns and the beautiful DAR Library ceiling are the most emblematic architectural features of the DAR National Headquarters historic building.

Skylight vs. Lay Light Skylight Lay Light

Serious Deterioration Discovered From the floor of the DAR Library, the lay light appears fine, but inspections from the top side of the lay light reveal structural deterioration which will require extensive and immediate restoration.

Architect Evaluation Report “It is actually remarkable that pieces of glass have not fallen to the Library floor.” - Quinn Evans Architects

$1.2 million dollars 9 month estimated completion time Critical to start project immediately or risk losing the lay light entirely Raising funds through the President General’s Project “Keeping The Roof Over Our Heads”

Rare 5.7 magnitude earthquake damaged National Headquarters Earthquake Hits Washington, DC

Earthquake damage prompted inspections that led to discoveries of deterioration in the lay light

Lay Light Structural Deterioration Metal webbing - called “zinc cames” - used to keep the glass in place is deformed This bowing and bending from the original flat surface is called “displacement” Problem caused by gravity and exacerbated by extreme heat and improper repairs made in the past Adds stress to the lay light panels and creates destabilization DAR Library Lay Light Problems

Cracked Glass Extreme displacement has resulted in glass breakage Improper ventilation which led to extreme heat exacerbated cracking Cracks in the panes could become hazardous by releasing from the zinc cames and falling to the library floor DAR Library Lay Light Problems

Cracked Concrete DAR Library Lay Light Restoration Cracking around the steel beams which hold the panels in place only serves to further destabilize support for the panels.

Support wires were added in inappropriate locations causing the zinc cames to pull from the glass adding stress and causing destabilization. DAR Library Lay Light Problems Poor Previous Repairs Proper placement at an intersection of zinc cames Improper placement

DAR Library Lay Light Problems Blowing rain can enter the cupola and cause water leakage resulting in glass staining Improper ventilation traps in heat Deteriorating Cupola

DAR Library Lay Light Problems Corrosion Moisture from leaking cupola has lead to corrosion Severe corrosion has destabilized the solder joints and zinc cames in all 25 panels

DAR Library Lay Light Problems Displacement The lead panels holding the glass are bowing and bending away from the horizontal support bar. It should be nearly parallel to the support bar but on many panels there is significant displacement or “sway”.

DAR Library Lay Light Restoration Work could take up to 9 months 25 panels of glass to be removed and restored individually Requires highly specialized skills performed by craftsmen Scaffolding will be required, but we’ll keep the DAR Library open and as accessible to researchers as possible!

DAR Library Lay Light Restoration

Restore to Original Historic Beauty

President General’s Project The DAR Library Lay Light Campaign will be part of the overall President General’s Project restoration efforts Successful roofing projects as well as repairing, restoring and cleaning exterior areas of the Headquarters complex have been completed but more critical work is still needed and will only be achieved with your support.

Contributions to the President General’s Project will help support the lay light project as well as other important initiatives Donor Wall recognition for those donating the various designated gift amounts Supporters who contribute $1,000 or more will receive the Benefactor Pin and special recognition at Congress President General’s Project

25 seven-foot square panels $40,000 donation (group or individual) supports the cost for refurbishing one panel Permanent recognition in the DAR Library will honor those able to donate the $40,000 required to sponsor a square Sponsor a Lay Light Square

Your support will ensure that generations of future Daughters will be able to cherish the historic and breathtaking DAR Library lay light. DAR Library Lay Light Restoration

For more information on how you can support the President General’s Project and the DAR Library Lay Light Restoration contact the DAR Office of Development: Thank You!