Financial Analyses of Municipal District Heating Options USAID Regional Energy Security and Market Development Project Workshop on Municipal District Heating.

Slides:



Advertisements
Similar presentations
Energy & Competitiveness Twist Throughout Western Balkans Aleksandar Kovacevic Senior Visiting Research Fellow Oxford Institute for Energy Studies.
Advertisements

Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
Profu Profu was established 1987 and has since then been an independent research and consultant company. The company works with strategic analysis within.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
FOREST FUEL - RENEWABLE ENERGY. Renewable energy Today, renewable energy is an important part of the Swedish energy budget. With its share in the energy.
Energizing the Island Community A Review of Policy Standpoints for Renewable Energy in Small Islands E. Kathy Stuart Graduate Student - M.A. in Island.
Competition based heat markets help delivering EU climate targets Building heat markets, Brussels, February 27 th 2015 Markus Rauramo, Executive Vice President.
Domestic Electric Heating Chris Davis Marketing Manager, Glen Dimplex UK Electrex – 17 th May 2006.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Establishing NAMAs as robust instrument for pre and post 2020 climate actions June 2015 Bonn, Germany.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
24 Jan What is Energy Policy?ECONOMICS ENVIRONMENT ENERGY SECURITY.
Ralf Goldmann JASPERS Activities in the sector of Renewable Energy and Energy Efficency Jaspers Workshop 28 November 2007.
The German Electricity Market in the European context Bocconi University Karsten Neuhoff German Institute for Economic Research / Technical University.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
Co- and Poly- generation Martin Hannemann Andi Prah Nuri Feichtinger Paul Polterauer.
Energy Efficiency – The First Fuel The Danish Experience Jiangsu - May 21st 2015 Counsellor Christian van Maarschalkerweerd – Embassy of Denmark.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
Lidzbark Warmiński heating plant in RETScreen Software Justyna Pawilonis 28 March 2007 Lidzbark Warmiński.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Financing Renewable Energy: Mechanisms, Challenges & Risks By Ujjwal Bhattacharjee, PhD Senior Fellow, TERI Regional Workshop on Innovative and Sustainable.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Euroheat & Power 1 Boosting Innovation from Research to Market District Cooling in Europe Potential and Benefits Tomas Bruce President Euroheat.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Designing Utility Regulation to Promote Investment in Cost-Effective Energy Efficiency Dale S. Bryk Natural Resources Defense Council Pennsylvania.
Coal and Sustainable Development David Cain of Rio Tinto for the World Coal Institute UNECE Ad Hoc Group of Experts on Coal and Thermal.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation UN Climate Change Conference June 2011 Bonn, Germany, 7.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
Feasibility Study as a Basis for Investment Financing Arto Nuorkivi ESCOBALT Project Manager, Finland Kaunas, Dec. 14, 2005.
Feasibility Study.
© OECD/IEA 2011 Energy Efficiency in Central Asia: Challenges and Opportunities VII KAZENERGY EURASIAN FORUM World in Transition Shaping Sustainable Energy.
The use of heat pumps in district heating systems Joe Grice Energy capital projects manager 24/11/2015.
Residential and Retail Energy Conservation Products and Services CEO: Mark W Jago CrystalRenewablePower.com.
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
SEE Energy Poverty Nexus Aleksandar Kovacevic. 2 Concept of Affordable Energy compromises: Total social costs of energy that could be covered by productivity.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
London needs to be more like Copenhagen Bob Fiddik Team Leader – Sustainable Development & Energy 19 th March 2012.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
 Ensure utilities plan for and provide services by which Missouri’s residents and businesses can achieve their goals with less energy over time, with.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Energy Savings Performance Contracts & Energy Service Companies
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
Renewable energy supply chains
Affordable Energy Production from Renewable Fuel
Recomposition of the European utility landscape
Building Competitive advantage through functional level strategies
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Generation Expansion Daniel Kirschen
Building Competitive advantage through functional level strategies
Building Competitive Advantage Through Functional-Level Strategies
Sustainable Heating and Cooling in Sweden
Presentation transcript:

Financial Analyses of Municipal District Heating Options USAID Regional Energy Security and Market Development Project Workshop on Municipal District Heating Options Obrenovac, November 14, 2012 Aleksandar Kovacevic

Contents General Municipal Heating Economics –Urban heating options –Long term competitiveness of district heating (DH) option –Key factors of competitive advantage for DH system Proposed Project Outcomes –Conversion of conventional DH system into sustainable option –Financial outcomes of intervention –Risk and Sensitivity analyses –Conclusions 2

Urban Heating Options There are many urban heating options in use –Air source heat pumps –Ground (waste heat) source heat pump –Heat-only-boiler based central heating (building level) –Light heating stove –Masonry stove and other efficient stoves –Electrical thermal accumulation heaters –Electricity - Direct heating –District heating If security of supply is not sufficient, consumers combine more than one option 3

Comparative Cost Analysis Calculate the cost of producing one megawatt-hour (MWh) of useful heat from various fuels using typical heat generation equipment and operational patterns in Serbia Current fuel costs and equipment efficiencies Current investment costs for equipment Operation and maintenance costs 4

Data and Assumptions for Comparative Analysis Heavy fuel oil and lignite fired boilers are traditional heat-only boilers (flue gas condensing not available due to the high sulfur content of these fuels) Natural gas boilers use advanced flue gas condensation but not full-scale condensing due to the requirements of temperature regulation in the networks Biomass boilers are based on full-scale flue gas condensing and advanced flow regulation Electricity is based on electric heaters with low investment cost that directly heat the living space (comfort might not be comparable with other options) Electricity (heat pump) is based on advanced split system air-to-air heat pump with inverter. The assumed price of electricity is based on day round use. Electricity (overnight) uses thermal accumulation heaters with partial uploading during the day (comfort might not be comparable with other options) Fuel wood is based upon traditional light heating stoves (no thermal mass, no turn-down-capability) 5

Comparative Heat Production Costs Heavy fuel oil Lignite Natural gas BiomassElectricity Electricity (heat pump) Electricity (overnight) Fuel wood Measurement unittt000m3tMwhe t Energy content (GJ) Price per unit (Euro) Boiler efficiency (%) Cost of MWh of fuel Cost of MWh heat produced Based on Current Fuel Costs and Equipment Efficiencies in 2011

Long-term Competitiveness of District Heating (DH) Option DH system requires minimum density of heat demand to be economical –Loss of customers (lowering density) increases cost to remaining customers –Gain of density decrease costs per unit. High utilization rates require flexibility of supply and active demand side management to avoid demand peaks Combination of relative fuel price and efficiency of fuel use in the reality of actual heat demand should match the competitive threshold in long term perspective. Fuel mix should support local economic development and employment in order to facilitate affordability Quality and reliability of supply should be almost perfect in order to match security of alternative urban heating options Competitive threshold: Heat delivered to the customer by the DH system, should be competitive with available heat pumps and the best available fuel wood stoves in long term 7

Key Factors to Competitiveness of Biomass DH System Biomass boiler economy of scale versus good quality wood stove High boiler efficiency and flexibility with low fuel cost and positive impact of fuel procurement to local economy versus available heat pump Fuel wood / biomass prices marginally dependent on prices of alternative fuels – electricity and natural gas Active forestry development policy is prerequisite to keep wood biomass abundant and prices stable Active demand side management is required to keep peak demand under control, ensure high utilization rates and minimize installation cap-ex and op-ex. Avoid any additional capital expenditure and keep it simple. 8

Situation of Current Conventional DH Systems Current DH systems stressed by massive loss of density of demand including commercial demand Very low inherent efficiency (COP of ) Too low utilization rate (<1000 hours) Inadequate reliability of supply Decreasing barriers to entry of alternative heating options Phase out of public subsidies but still some emergency / reactive interventions and cross over subsidies Poor quality of service (low comfort levels) Loss of most potent and demanding customers Price regulations, state aid and barriers to entry can not keep conventional DH companies in business for long 9

Conversion of Conventional DH System into Sustainable Option Investments must be directed to change of fundamentals of the competitive situation Minimize size of heat source (maximize utilization rates) by early introduction of energy efficiency, heat distribution management and demand side management Capture economy of scale by standardization of boilers and substations and through mass procurement Maximize part-load efficiency (and utilization rates) by use of condensing boilers Implement heat network efficiency improvements to the grid and flow control focused to decrease return water temperature Establish an ESCO fund to address energy efficiency of strategically located consumers High quality installation to maximize residual value of assets and facilitate BOOT arrangement 10

Projected Financial Outcomes Institute of Economic Sciences developed a cash flow model of the project at the SDHIC, Municipal District Heating Company and ESCO levels 11

Proposed Investment Timeline 12

Projected Revenues and Operating Costs Gross revenues are positive starting the first year the new biomass heat supply systems start operation Gross profit exceeds €10 million annually by year 10 Net cash flow and IRR have also turned positive by year 10 13

Risk Analyses Bankruptcy risk to current DH companies becomes critical if no intervention Risks considered in the scope of financial analyses –Regulatory risks –Institutional risks –Political risks –Financial risks –Technical and Managerial risks –Operational risks Knowledge intensive solution controls political risks 14

Sensitivity Analyses Results Proposed project is very robust due to strong economic fundamentals and links to local economic development 15 Sensitivity analysisImpact on Projected Financial Outcomes Decline of revenues and collection risks very robust, sustains decrease of over 20% revenue reduction O&M costs and fuel costs increase very robust, minimal change in IRR +/-20% in biomass costs. Change in interest ratesrobust Non-performance of four cities robust but sensitive – economy of scale important

Demand Side Efficiency Intervention 16 Financial analysis showed the ESCO business component of SDHIC to have a compelling investment case due to –strategic targeting to high impact buildings –short pay back period –standardization of energy efficiency interventions focused on peak energy demand and weather sensitivity Value of energy efficiency at the building level is only exposed if energy efficiency fundamentals are properly set at the DH system level.

Conclusions Bankruptcy risk motivates intervention Phase out of state aid in the context of EU integration DH companies exposed to competition while extremely vulnerable Diminishing regulatory barriers to entry of competitors Dismantling of DH systems would represent a missed opportunity for energy efficiency Economical investment possible Downstream opportunity to increase market share and facilitate further local economic development 17

ADD ON SLIDES 18

Heat production cost comparisons 19

Sample efficiency curve for biomass boiler 20