Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Ernest L. Williams Jr. Controls Commissioning October 2007 Controls Commissioning Facility Advisory Committee.
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
1 Input/Output Chapter 3 TOPICS Principles of I/O hardware Principles of I/O software I/O software layers Disks Clocks Reference: Operating Systems Design.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
INTRODUCE OF SINAP TIMING SYSTEM
Overview of SINAP Timing System Electronics Group Beam Diagnostics & Control Division SINAP.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
Micro-Research Finland Oy Timing System Developments Jukka Pietarinen EPICS Collaboration Meeting Shanghai March 2008.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
Micro-Research Finland Oy Components for Integrating Device Controllers for Fast Orbit Feedback Jukka Pietarinen EPICS Collaboration Meeting Knoxville.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
1 Timo Korhonen PSI 1. Concepts revisited…again 3. New (Diamond) cards features and status 4. EPICS interface 5. Conclusions SLS & Diamond Timing System.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
GAYA Analyzer SDD Presentation. GAYA Analyzer Introduction OMS40G256 is a hardware device used for detection of radioactive radiation for medical imaging.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
FECC/SAIOC/RTEMS Making Lemonade. FECC “Slow” Code (in PC) –Ported iRMX code –By Bob Sass and Tony –As little hand work as possible –EPICS OSI layer –Dual.
EPICS Collaboration Meeting Timing Workshop April 24, 2012.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements.
REDNet - Status overview Rok Stefanic Ziga Kroflic
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Stephanie Allison LCLS IOC Meeting Jul 18, 2008, Jan 21, 2011 Beam Synchronous Acquisition for IOC Engineers Definition/Requirements.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
SLAC I&C Division / EE Department
Software Overview Sonja Vrcic
Beam-Synchronous Data Acquisition (BS-DAQ)
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
SLS Timing Master Timo Korhonen, PSI.
LCLS Timing Software and Plan
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
EIN 6133 Enterprise Engineering
Event Displays for EVR IOCs
LCLS Timing Outline Scope The order of things
LCLS Event System - Software
EPICS Collaboration Meeting
Timing and Event System for the LCLS Electron Accelerator
LCLS Timing Outline Scope The order of things
EPICS: Experimental Physics and Industrial Control System
SLS & Diamond Timing System update
Beam Synchronous Acquisition on IOC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
EVG-to-EVR Data Transfer (Dayle Kotturi)
LCLS Global Controls Overview August 10, 2004
Breakout Session: Controls
LCLS Machine Protection System
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Presentation transcript:

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Timing Outline Block diagram overview of the timing system Where were we at time of last FAC? What has happened since then? How will this work anyway? How does it look from a users point of view? What do we still not know? Tasks remaining: plans/schedule

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Timing System

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Where were we at time of last FAC? PNET driver done EVG/EVR 100 series hardware in house could send events from EVG to EVR but not PNET data Working with other labs and Micro-Research Finland (MRF) to consolidate our requests for a new version of the hardware

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 What has happened since then? Received the EVG/EVR 200 series VME hardware (which sends up to 2K data buffer) Adapted driver and device support to: send the PNET data buffer (measured 66 µs transfer) be OSI (running on mvme6100, RTEMS4.7) with help from Till Straumann, Eric Bjorklund, Timo Korhonen, Jukka Pietarinen and Bob Dalesio Wrote Timing Trigger System Engineering Manual Received the EVR 200 series PMC module Installed fiber optic network in Bldg 280 for testing

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 What has happened since then? (2) Stephanie is setting up a hardware teststand with separate IOCs for EVG and EVR in Bldg 34 for CPE engineers to do: Timing comparison with existing CAMAC timing system (MPG/PDU) Timing measurements – jitter, etc Shakedown by the experts Test stand to include: EVG, PNET, EVR, EVR transition module, EVG fanout later Inputs: PNET pattern from CAMAC timing system, fiducial trigger, and 476Mhz clock Outputs: EVR front panel and back transition module Infrastructure: VME crates, dedicated terminal server, dedicated PC, fiber between EVG and EVR EPICS: test databases and displays, EVR done, EVG in-progress

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 How will this work anyway?

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 EVG/EVR data sources by type

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Timescale for event code transfer 360Hz fiducial Time after fiducial that event code is sent(millisec) LCLS timeslot shown RF event BPM event 0.0 Laser event Beam On Hz event 10Hz event Event Code

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Timescale for event buffer transfer Time to send 16 byte event buffer from EVG to EVR: 66.4 µs

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Timescale for MPS data transfer

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 How does it look to a user?

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 PNET data display

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 EVR diagnostics for h/w engineers

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 EVR event diagnostics for h/w engs

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 What do we still not know? Verify jitter Verify fiber optic performance (multi vs single mode) Licensing agreement with MRF

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Tasks remaining: plans Finish PMC-EVR driver EVG sequence RAM programming at 360 Hz EVG rules definition MPS hardware interface Migrate PNET receiver data records to EVR data records Full-integration of PMC-EVR with VME-EVR software for easier maintenance Operator interface – panels to set rate limits, do single shot Fanout and transition module integration and testing Installation at sector 20

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Interface Control Document + review, May EVG input and output HW and SW trigger list per subsystem Applications using the timing pattern Record (maybe IOC) timestamping Beam-synchronous acquisition and control Use writeup provided by Bob Dalesio Design Document + review, June Beam-Synchronous Control: rules and algorithm for creating EVG trigger sequences on a pulse-to-pulse basis – algorithm changes based on user requests Beam-Synchronous Acquisition: mechanism for users to request pulse-by-pulse acquisition (single-shot or buffered) across multiple IOCs based on specified conditions Proper timing pattern in-place before a fiducial for record processing after fiducial Implementation of above design plus: Integration with SLC-aware BPM acquisition Missing functionality in existing EVG and EVR records for HW upgrade User-friendly database layer on top of low-level EVR records Tasks remaining: high-level s/w plans

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21, 2006 Tasks remaining: schedule We’re in the process of redoing/updating the work breakdown schedule. A draft is due by end of April and final version in May.