The PACS Status Herschel PV Mid-Term Review ESAC, September 1, 2009 1 Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.

Slides:



Advertisements
Similar presentations
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
Advertisements

Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.
Extragalactic science with the Herschel Space Observatory Marc Sauvage CEA/DSM/DAPNIA Service d'Astrophysique UMR AIM.
Anthony Marston & Elena Puga, Herschel Instrument and Calibration Scientist Team, HSC, ESAC. Herschel Calibration Workshop: Cross-Calibration Goals.
PACS CoP & PV Review 21/22 Jan 2009 PVSpecWave1 Spectrometer Wavelength Calibration XHSPOT Proposal: PVSpecWave H. Feuchtgruber.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS Status Report Herschel ST#38ESAC, 30 Jun 2009 Herschel map making workshop 10 July 2009 B.Altieri/E. Sturm for the PACS Team / HSC Herschel map making.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
PACS Hitchhiker’s Guide to the Herschel Science Archive Pasadena, 6 th -10 th October 2014 Quickstart Guide to HIPE and the HSA David Shupe User Support.
NHSC Workshop August 2013 NASA Herschel Science Center - page 1 PACS David R. Ardila User Support coordinator / NHSC Archive Scientist The Herschel Science.
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber.
PACS SOVT-2 and CAPs development MPIA PACS ICC Meeting #31 12 th – 13 th January 2009, Vienna (A) Markus Nielbock (MPIA)
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The SPIRE Photometer and its Observing Modes Bernhard Schulz (NHSC/IPAC)
Fleming College Quality and Risk Management Review Summary February 2, 2006.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
PACS Hitchhiker’s Guider to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 SPIRE Photometer Data Products Kevin Xu NHSC/IPAC on behalf of the.
Request for Proposal (RFP)
Herschel Open Time Cycle 1 DP workshop ESAC, March page 1 Pat Morris, NHSC HIFI Mapping Processing in HIPE.
NASA Herschel Science Center - page 1 NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 PACS Accepted Programs & Observations to Date B.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
Herschel Open Time Cycle 1 DP workshop ESAC, March page 1 Tour of HIFI data.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Spectrometer: Overview and Products Roberta Paladini NHSC/IPAC.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
Jan 21/22, 2009PACS PV Review Photometer Spatial Cal1 PACS Photometer Spatial Calibration PVPhotSpatial D.Lutz PACS PV Review Jan 21/ , MPE.
NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 NASA Herschel Science Center - page 1 PAC S prepared by Nicolas BILLOT
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
September 30, 2010COMS W41561 COMS W4156: Advanced Software Engineering Prof. Gail Kaiser
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
PACS page 1 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 PACS page 1 Overview of SPIRE Photometer Pipeline C. Kevin Xu (NHSC/IPAC)
PACS ICC Readiness Review MPE, July 3/ Extended-DP 1/13 E. Sturm: Extended-DP Eckhard Sturm.
PACS ICC Readiness Review MPE, July 3/ Operations Scenario I I) ICC Implementation 1/24 E. Sturm: Operations Scenario I Eckhard Sturm ICC structure,
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Bruno Altieri Jan # 1 Parallel mode Bruno Altieri (HSC) PACS PV phase review MPE,
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Markus Nielbock (MPIA) – Herschel Pointing PACS ICC Meeting #38 Herschel Pointing Summary and Recent Developments Markus Nielbock (MPIA Heidelberg) with.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 Overview of SPIRE Photometer Data Reduction Pipeline Kevin Xu NHSC/IPAC.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration Herschel Calibration Workshop PACS Photometer Flux Calibration: Update Markus Nielbock (MPIA.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration EPOS Meeting PACS Photometer Flux Calibration Current Plans Markus Nielbock MPIA, 22 th February.
Markus Nielbock (MPIA) – Herschel/PACS DP Workshop Herschel DP Workshop PACS Photometer Flux Calibration and Point Source Photometry Markus Nielbock (MPIA.
Markus Nielbock (MPIA) – PACS Point Source AOT Pipeline Herschel Science Demonstration Phase Data Processing Workshop PACS Point Source AOT Pipeline Tutorial.
Herschel Calibration Workshop
PACS Calibration Status Report
JWST Pipeline Overview
PACS ICC Meeting #41 PACS Photometer
Markus Nielbock (MPIA Heidelberg)
Overview and new developments in Herschel Data Processing
Presentation transcript:

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock (MPIA)

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Plan Goals and details of PACS PV outlined in PACS PV Phase Plan Document (PICC-MA-PL-001, Issue 1.4) description of calibration sources high level description of calibration programmes detailed description of calibration observations overview of pipeline processing high level plan of PACS PV phase OD schedules trace matrix of scheduled ODs and targets per calibration item MTL (mission timeline) overview of scheduled PACS ODs main drivers of AOT validation: requirements and AOT requests of GT/OT Key Projects reproducibility of AOT mode results (cross calibration) optimise AOTs wrt their parameter space probed

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS Calibration Programme one proposal for each general calibration aspect PACS PhotPACS SpecSPIRE/PACS Parallel PVPhotSetupPVSpecSetupPVParAOTVal PVPhotCoolerPVSpecGeGa PVPhotBolPVSpecSPU PVPhotFPGPVSpecFPG PVPhotSpatialPVSpecWave PVPhotFluxPVSpecIP PVPhotAOTValPVSpecSpatial PVSpecFlux PVSpecAOTVal

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS Photometer Calibration

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS Spectrometer Calibration

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Statistics today: OD 111 (SPIRE/PACS Parallel) start of PV phase: OD 64  48 days of PV, 25 days covered by PACS 4 ODs taken over from HIFI (used for pointing investigation) 8 ODs pointing investigation (incl. S/C STR anomaly, SAA dependence) could not be used for advancing PACS calibration programme some observations (a few ODs in total) have failed technical reasons like STR1/STR2 swap SAA dependent PTG performance human error (CUS code, AOR parameters) none of the failures put instrument or S/C in danger

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Progress (1) Bottom line: PACS calibration is on track as planned.  additional investigations stretch resources for generic PACS PV to the limit turnaround cycle: observation – analysis – planning – scheduling – delivery 12 days (PACS alternating PHOT/SPEC  PACS prime every 6th OD) originally: 2 days downlink – 8 days analysis – 2 days uplink changed to: 2 days downlink – 5 days analysis – 5 days uplink PACS stepping in for HIFI increases work load for planning, uplink, analysis (despite the additional work)

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Progress (2)

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Progress (3)

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Progress (4) see presentations by A. Contursi and M. Sauvage for details PACS Photometer (PHOT) PACS Spectrometer (SPEC) SPIRE/PACS Parallel Mode not yet tested (first execution on ODs 111/112) finished detector tuning (optimal low gain/high gain bias settings) final bias settings, but a few issues to be clarified for detectors AOT validation just started (point source & scan map) re-design of AOTs before launch  revised AOT validation programme AOT validation programme is being executed according to plan

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, PACS PV Phase Projection execution of assigned 18 PACS PV ODs pending some crucial calibration observations to be postponed until after official PV phase due to target visibility (planets, asteroids) two ODs (114/115) already delivered to HSC detailed plan exists for four following ODs (118/119, 124/125) mostly covering SPEC spatial calibration PHOT: AOT validation, spatial and flux calibration Jupiter: wavelength calibrator filling the entire SPEC FOV Neptune: flux calibrator, SPEC PSF calibrator