Bruno Altieri 21-22 Jan. 2009 # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.

Slides:



Advertisements
Similar presentations
CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (CPPhot) Koryo Okumura / Marc Sauvage.
Advertisements

The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Anthony Marston & Elena Puga, Herschel Instrument and Calibration Scientist Team, HSC, ESAC. Herschel Calibration Workshop: Cross-Calibration Goals.
CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (PVPhot) Koryo Okumura / Marc Sauvage.
Bruno Altieri September # 1 PACS photometer pipeline overview Bruno Altieri (ESA/HSC)
PACS CoP & PV Review 21/22 Jan 2009 PVSpecWave1 Spectrometer Wavelength Calibration XHSPOT Proposal: PVSpecWave H. Feuchtgruber.
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
PACS Status Report Herschel ST#38ESAC, 30 Jun 2009 Herschel map making workshop 10 July 2009 B.Altieri/E. Sturm for the PACS Team / HSC Herschel map making.
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Photometer AORs How to Prepare an Observation with HSpot: 2 Science Use.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
Wideband Imaging and Measurements ASTRONOMY AND SPACE SCIENCE Jamie Stevens | ATCA Senior Systems Scientist / ATCA Lead Scientist 2 October 2014.
FM-ILT Results of the PACS FM1 Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber.
PACS SOVT-2 and CAPs development MPIA PACS ICC Meeting #31 12 th – 13 th January 2009, Vienna (A) Markus Nielbock (MPIA)
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
A look at XMM slew data Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri, Puri Munuera.
- page 1 NHSC – DP workshop – Feb – N. Billot PACS PACS Photometer Standard Pipeline Level 0 to Level 1 processing: From raw to calibrated data cubes.
University of Colorado Boulder ASEN 5070: Statistical Orbit Determination I Fall 2014 Professor Brandon A. Jones Lecture 18: Minimum Variance Estimator.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
PACS Hitchhiker’s Guider to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 SPIRE Photometer Data Products Kevin Xu NHSC/IPAC on behalf of the.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Photometer: Overview and Products Roberta Paladini NHSC/IPAC.
Spectroscopy with PACS M82 PACS line imaging from the SHINING team (Contursi et al First Results workshop talk) Phil Appleton and Dario Fadda for.
CEA DSM Dapnia SAp Readout mode of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/SAp.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The PACS Spectrometer: Overview and Products Roberta Paladini NHSC/IPAC.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
Jan 21/22, 2009PACS PV Review Photometer Spatial Cal1 PACS Photometer Spatial Calibration PVPhotSpatial D.Lutz PACS PV Review Jan 21/ , MPE.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
Atmospheric phase correction at the Plateau de Bure interferometer IRAM interferometry school 2006 Aris Karastergiou.
PACS Photometer Standard Pipeline Level 0 to Level 1 processing From raw to calibrated data cubes B. Altieri (ESA/HSC), N.Billot (IPAC/NHSC) ESAC March.
PACS NHSC Data Processing Workshop Aug 26-30, 2013 Page 1 SPIRE Spectrometer Data: Calibration Updates, User Data Reprocessing, and Other Issues Nanyao.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
Charts for TPF-C workshop SNR for Nulling Coronagraph and Post Coron WFS M. Shao 9/28/06.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
PACS ICC Readiness Review MPE, July 3/ Operations Scenario I I) ICC Implementation 1/24 E. Sturm: Operations Scenario I Eckhard Sturm ICC structure,
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
Bruno Altieri Jan # 1 Parallel mode Bruno Altieri (HSC) PACS PV phase review MPE,
PACS Page 1 NHSC Workshop on HSA Data Oct 6-10, 2014 SPIRE Spectrometer: Pipeline Calibration Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC, HSC & NHSC)
NHSC HIFI DP workshop Caltech, 8-9 March page 1 Pat Morris, NHSC DP Webinar, 9 March 2012 HIFI Spectral Maps in HIPE.
- page 1 PACS Phil Appleton on behalf of the NHSC/HSC and the PACS ICC ; especially Bart Vandenbussche and Pierre Royer (KUL Belgium) Instrument Performance.
ApEx needs for CeC PoP Experiment December 11, 2015.
A. Ealet Berkeley, december Spectrograph calibration Determination of specifications Calibration strategy Note in
Markus Nielbock (MPIA) – Herschel Pointing PACS ICC Meeting #38 Herschel Pointing Summary and Recent Developments Markus Nielbock (MPIA Heidelberg) with.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration Herschel Calibration Workshop PACS Photometer Flux Calibration: Update Markus Nielbock (MPIA.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration EPOS Meeting PACS Photometer Flux Calibration Current Plans Markus Nielbock MPIA, 22 th February.
Markus Nielbock (MPIA) – Herschel/PACS DP Workshop Herschel DP Workshop PACS Photometer Flux Calibration and Point Source Photometry Markus Nielbock (MPIA.
Extra Solar Planet Science With a Non Redundant mask
Herschel Calibration Workshop
Extra Solar Planet Science With a Non Redundant mask
PACS Calibration Status Report
PACS / SPIRE cross-calibration on prime fidicial standard stars
Fangfang Yu, Xiangqian Wu and Tom Stone
PACS ICC Meeting #41 PACS Photometer
Markus Nielbock (MPIA Heidelberg)
The Moon as Possible Calibration Reference for Microwave Radiometers
What’s New in HIPE 10.0 (SPIRE FTS)
Children’s Hospital Update
Presentation transcript:

Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase review MPE, January 2008

Bruno Altieri Jan # 2 Pointing Working Group A pointing working group was set-up early 2008, by the SciOps WG between Project, MOC (FD), HSC and ICCs. A pointing calibration plan was issued –T. Marston, HERSCHEL-HSC-DOC-1139, v1.0, 5/8/2008 –Herschel relies on PACS (blue) photometer for spacecraft pointing performance assessment The plan was later de-scoped to only use Star Tracker 1

Bruno Altieri Jan # 3 Pointing calibration plan Pointing cal. plan became part of PV phase to a large fraction, hence now in PACS PV plan –But time budget counted separately –Obviously must be scheduled as early as possible. –Preceded by in commissioning : ACMS commissioning in CoP Photometer bias set-up (BOLO_BIAS_2) PACS search scan map (CoP) Check of derived SIAM update (CoP) Total estimated time : ~30 hours –In the PVPhotFPG program –Does not include 7.5 hours of spectrometer FPG.

Bruno Altieri Jan # 4 Pointing calibration CoP Initial search map –40’x40’ scan map: wide search to include STR structure bending, M2 misalignment.. –M51 ? ISO first light Advantages: –Visible 23/04 – 09/08 –Hint about orientation Drawback –Not point-like, but companion is ! Derive SIAM Check SIAM update –Standard PS mode –HIP (always visible) 140 Jy Already a scan map at the end of BOLO_BIAS_2 ?

Bruno Altieri Jan # 5 Pointing calibration PV Pointing cal. plan became part of PV phase to a large fraction, hence now in PACS PV plan –But time budget counted separately –Obviously must be scheduled as early as possible. –Preceded by in commissioning : ACMS commissioning in CoP Photometer bias set-up (BOLO_BIAS_2) PACS search scan map (CoP) Check of derived SIAM update (CoP) Total estimated time : ~30 hours –In the PVPhotFPG program –Does not include 7.5 hours of spectrometer FPG.

Bruno Altieri Jan # 6 Pointing calibration Stars sample selected by Markus Nielbock –PACS pointing calibration stars (PICC-MA-TN-003) Measure APE statistically with “many” stars –40 stars, 5mn AORs, for standard SAA range [-10,30] –Duration :~4 hours Tune SIAM Explore the full SAA range after a long stabilisation –[-20,-10] –[-30, -20] SRPE measurement assessment, –Making use of on-ground gyro propagation

Bruno Altieri Jan # 7 Pointing observation plan (1)

Bruno Altieri Jan # 8 Pointing observation plan (2)

Bruno Altieri Jan # 9 Tests and CAP SOVT-1: standard AORs SOVT-2 –OD 60, 63 & 64 –Only looked at OD 60 so far Dithering was not put (gain?) SIMS-1 –OD 65 already delivered (standard AORs) CAP from Dieter Tested 2D gaussian fitting in dp-pacs –Though not as robust as in IDL