Suomi NPP OMPS EV SDR Task Overview Fred Wu, OMPS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction (NCWCP) 5830.

Slides:



Advertisements
Similar presentations
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First Level 1b Spectral Calibration analysis.
Advertisements

SNPP VIIRS SDR RSR LUT Update: ADR 4971, CCR U. Wisconsin:Chris Moeller NASA VCST: Ning Lei, Shihyan Lee, Zhipeng Wang, Sam Anderson, Chengbo Sun,
VIIRS LST Uncertainty Estimation And Quality Assessment of Suomi NPP VIIRS Land Surface Temperature Product 1 CICS, University of Maryland, College Park;
NCC Status December 18, 2012 Calvin Liang Stephanie Weiss NGAS A&DP.
Presentation on OMPS Nadir Mapper Wavelength Shift Adjustment for Earth-view Measurements.
Extending the Records: OMPS Ozone Products NOAA Satellite Science Week L. Flynn with contributions from the NOAA and NASA OMPS S-NPP Teams.
Spacecraft in normal Mission Mode, all systems nominal
Results from the OMPS Nadir Instruments on Suomi NPP Satellite
NGAS CrIS SDR Cal/Val Activity and Highlights Oct 23, 2012 Lihong Wang, Chunming Wang, Denise Hagan and Degui Gu.
Integrating Changes to JPSS Cross-Track Infrared Sounder (CrIS) SDR Algorithm using the Algorithm Development Library (ADL) Vipuli Dharmawardane 1, Bigyani.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
SNPP VIIRS On-Orbit Calibration for Ocean Color Applications MODIS / VIIRS Science Team Meeting May 2015 Gene Eplee, Kevin Turpie, Gerhard Meister, and.
1 Validated Stage 1 Science Maturity Review for {JPSS Algorithm} Presented by Date.
Kerry Grant, Wael Ibrahim, Paula Smit, JPSS CGS Raytheon Intelligence, Information, and Services, Aurora, CO Kurt Brueske, JPSS CGS Raytheon Intelligence,
Support Material for OMPS SDR to Beta Maturity Decision Compilation of results from JPSS and NPP OMPS Teams March 12, 2012 Edited by L. Flynn, NOAA/STAR.
NPP VIIRS M6 Saturation Study Update
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
JPSS Common Ground System IDPS NPP Algorithm Operability Verification – Launch Build Characterization Tentative Agenda IDPS OAA 5/10/11.
Suomi NPP CrIS SDR Task Overview Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction (NCWCP) 5830.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
1 Validated Stage 1 Science Maturity Review for OMPS Total Column Ozone EDRs Presented by L. Flynn, NOAA September 3, 2014.
Evaluation of OMPS sensor and EV SDR performance Conclusions: Sensors are performing well Calibrations are very good; no sign of degradation Comparisons.
Implementation and Processing outline Processing Framework of VIIRS instrument monitoring System Processing Framework of VIIRS EV data Monitoring SD/SDSM.
OMI ST meeting June 2006 Calibration & 0-1b data processing Marcel Dobber (KNMI)
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Delta Review for SNPP OMPS SDR Earth View Products NOAA/NESDIS/STAR August 17, 2015 OMPS SDR Team Fuzhong Weng.
Xin Jin 1, Yong Han 2, Ninghai Sun 1, Fuzhong Weng 2, Denis Tremblay 3, Yong Chen 4, Likun Wang 4, Xiaozhen Xiong 1 1 ERT, Inc., 2 NOAA/NESDIS/STAR, 3.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.
Support Material for OMPS SDR to Beta Maturity Decision Performance compared to Pre-launch Compilation of results from JPSS and NPP OMPS Teams.
Recent Solar Irradiance Data From SBUV/2 and OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) SOLID WP-2 Workshop.
Xin Jin 1, Yong Han 2, Denis Tremblay 3, Likun Wang 4 1 I. M. System Groups, Inc., 2 NOAA/NESDIS/STAR, 3 Science Data Processing, Inc., 4 UMCP Contact:
1 Validated Stage 1 Science Maturity Review for Surface Reflectance Eric Vermote Sept 04, 2014.
Ozone PEATE 2/20/20161 OMPS LP Release 2 - Status Matt DeLand (for the PEATE team) SSAI 5 December 2013.
NGAS ATMS Cal/Val Activities and Findings Degui Gu, Alex Foo and Chunming Wang Jan 13, 2012.
Suomi NPP OMPS EV SDR Provisional Product Review Fred Wu, OMPS SDR Team NOAA/NESDIS/STAR October 23, 2012.
Review of the 2012 Suomi NPP Applications Workshop: Outcomes, Results, Progress Forrest Melton November 18, 2014 Suomi NPP Applications.
VIIRS NCC Imagery at Beta CCR DR 4859 Dr. Thomas Kopp – Imagery Validation Lead Dr. Donald Hillger – Imagery Product Lead Mr. Ryan Williams - Imagery.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.
NASA OBPG Update OCRT Meeting 23 April 2012 Bryan Franz and the NASA Ocean Biology Processing Group.
Ocean Color Research Team Meeting May 1, 2008 NPOESS Preparatory Project (NPP) Status Jim Gleason NPP Project Scientist.
SDR/EDR Overview Template Name of the Product: (SDR/EDR) Product Contributors: (SDR/EDR) Team Date: August xx, 2015.
Denis Tremblay 1, Yong Han 2, Yong Chen 3, Likun Wang 3, Xin Jin 2, Xiaozhen Xiong 2, Lihang Zhou 2 1 Science Data Processing Inc., 2 NOAA/NESDIS/STAR,
JPSS Common Ground System Operational Algorithm Status – Launch Build Characterization Tentative Agenda IDPS OAA 4/5/11.
1 SBUV/2 Calibration Lessons Over 30 Years: Liang-Kang Huang, Matthew DeLand, Steve Taylor Science Systems and Applications, Inc. (SSAI) / NASA.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
Bias analysis and correction for MetOp/AVHRR IR channel using AVHRR-IASI inter-comparison Tiejun Chang and Xiangqian Wu GSICS Joint Research and data Working.
NOAA GPRC Report Fangfang Yu and Fred Wu 05 March 2012.
MsWG (Apr 22, 2015) Recent L1B LUT delivery since April 8, 2015
NOAA VIIRS Team GIRO Implementation Updates
NESDIS-JMA AHI Collaboration
V2.0 minus V2.5 RSAS Tangent Height Difference Orbit 3761
MODIS and VIIRS Reflective Solar Bands Calibration Methodologies and
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
NOAA Report on Satellite Data Calibration and Validation – Satellite Anomalies Presented to CGMS-43 Working Group 2 session, agenda item 3 Author: Weng.
Calibration and Performance MODIS Characterization Support Team (MCST)
MODIS Lunar Calibration Data Preparation and Results for GIRO Testing
NOAA-20 and Suomi NPP ATMS On-orbit Performance
6e. Update on NOAA-20 Ozone Mapping and Profiler Suite (OMPS)
VIS/NIR sub-group discussion
Ninghai Sun1, Lihang Zhou2, Mitch Goldberg3
GSICS MW products and a path forward.?
S-NPP Visible Infrared Imaging Radiometer Suite (VIIRS) Lunar Calibration using GSICS Implementation of the ROLO model (GIRO) for Reflective Solar Bands.
TanSat/CAPI Calibration and validation
Dorothee Coppens.
Use of GSICS to Improve Operational Radiometric Calibration
GSICS Annual Meeting March 06, 2019 Frascati, Italy
goes-16/17 abi lunar calibration
Presentation transcript:

Suomi NPP OMPS EV SDR Task Overview Fred Wu, OMPS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction (NCWCP) 5830 University Research Park, College Park, Maryland December 19, 2013

Outlines OMPS SDR Team OMPS SDR CalVal Activities Since Provisional OMPS SDR DR Status Justification for OMPS EV SDR to be Validated Path Forward Summary 2

CrIS SDR Team 3 PI NameOrganizationPrimary Roles Fred WuNOAA/STAR Budget and coordination; Instrument and product performance monitoring; J1 code development; TVAC data analysis; SDR algorithm. Glen JarossNASA Instrument scientist; TVAC data acquisition and analysis; SDR algorithm. Bhaswar SenNGAS G-ADA test for IDPS operations; TVAC data analysis; SDR algorithm. Maria CaponiAerospace DPA coordination; DR tracking. Daniel CumptonRaytheon IDPS operations

Findings at Provisional Review (24 Oct 2012) OMPS instrument performance is excellent OMPS EV SDR from IDPS has not taken full advantages of that performance Recommend to resolve three critical issues before OMPS EV SDR becomes Provisional: – Darks – Smear – Stray light 4

Critical Issue #1 – Darks Routine update of the dark current – Implemented weekly update Since 21 Dec 2012 for NM Since 7 Feb 2013 for NP – Work is under way to automate the process by transitioning the operation to GRAVITE 5 Details in Pan’s presentation

Critical Issue #2 – Smear Occasional negative smear was observed – Identified the root cause in Feb 2013 SAA DARKS was used inadvertently When the predicted SAA intensity is 20% of its normal maximum. Which causes negative smear. – Implemented correction in May 2013 CCR 0952 was approved in March Correction was implemented as part of Mx6.7 in May – Can also be caused by the fixed bias (DR7315 for NM and DR4818 for NP). Rare event, minimal impact, low priority. 6

Critical Issue #3 – Stray Light Implement stray light correction – Correction was recommended in Feb 2013 – Interim correction in July as part of Mx7.0 – Complete correction in Aug as part of Mx7.2 – Details in Jaross presentation 7

Findings at Provisional Review (24 Oct 2012) OMPS instrument performance is excellent OMPS EV SDR from IDPS has not taken full advantages of that performance Recommend to resolve three critical issues before OMPS EV SDR becomes Provisional: – Darks – Smear – Stray light SDR team discussed path forward with AERB in Nov SDR team Resolved issues. AERB approved Provisional status on 6 Mar 2013, effective as of 1 Mar 2013 (Mx6.6). 8

OMPS CalVal Tasks Since Provisional Resolved the issues and reached Provisional Improved SDR algorithm and software Characterized and continue monitoring OMPS instrument and SDR performance Implemented radiometric and spectral calibration Documented the progress 9

SDR Algorithm and Software Count-based stray light correction – Planned pre-launch for NM, based on radiance – Post-launch, the SDR team concluded that a count-based correction is superior. – Modification of the code (CCR ), LUT, and ATBD was completed. Stray light correction for NP – Not planned pre-launch but recognized as necessary post- launch – Approved as CCR (to be implemented with Mx8.3). Details in Jaross presentation. 10

Instrument and SDR Performance Characterize and monitor OMPS nadir instrument performance – Pan presentation. Characterize and monitor OMPS nadir SDR performance – Wu presentation. 11

Radiometric and Spectral Calibration Improved the radiometric calibration of OMPS nadir instruments – Routine update of dark current – Inhibited the SAA dark – Stray light correction Improved the spectral calibration of OMPS nadir instruments – Wavelength registration – details in Flynn presentation 12

Documentation – Peer Reviewed Flynn, L., and co-authors, 2013: Accepted by JGR (2013JD020467R). Jaross, G., and co-authors, 2013: Submitted to JGR (2013JD020482R). Pan, C.; Kowalewski, M.; Buss, R.; Flynn, L.; Wu, X; Caponi, M.; Weng, F, "Performance and Calibration of the Nadir Suomi- NPP Ozone Mapping Profiler Suite From Early-Orbit Images," IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing, vol.6, no.3, pp.1539,1551, June 2013 doi: /JSTARS Seftor, C., and co-authors, 2013: Submitted to JGR (2013JD020472R) Wu, X., and co-authors, 2013: Submitted to JGR (2013JD020484R) 13

Documentation - Other Presentations in this review – Pan: OMPS nadir instrument performance – Jaross: Stray light correction – Flynn: Wavelength registration – Wu: OMPS nadir SDR evaluation – Long: NOAA user feedback – Yang: NASA user feedback OMPS SDR User’s Guide (to be delivered) OMPS ATBD Error budget 14

OMPS SDR DR Status 12 DRs remain open since Provisional: – All are related (one indirectly) to CAL SDR that will be closed or resolved after the CAL SDR operation is transitioned to GRAVITE. 122 DRs were submitted since Provisional: – 90 were associated with NM & NP DARKS GRN-PI update, for which CCR have been implemented. – 12 led to CCRs Ten were approved One to be submitted to CM One was withdrawn. – 20 are in progress Three are associated with J1 requirements 17 are not critical for validated maturity Details in backup slides. 15

OMPS SDR Processing Status (1) IDPS – Current version Mx8.0 ADL – Code updated to Mx8.1 (to be operational Feb 2014). – Capable of parallel processing or re-processing of SDRs. Quality Flag – SAA and SolarEclipse: Work well. – OutDateCal: Need to update the CDFCB. – LinearCorrection: Corrected with Mx6.2. – QualityEarth: Obsolete. – SunGlint: Need investigation (not used). 16

SAA Flag Location and Frequency NP Sunglint (NM similar)

OMPS SDR Processing Status (2) Data Completeness – One incident (Orbit 5873) of missing RDR: 1 NM, 2 NP, and 2 LP granules of RDR were not delivered to CLASS. Corresponding SDR were available. Root cause: S/C diary not available at the time of RDR packaging. WR was rejected because it happened only once with minor impact (not on SDR). – One incident of duplicate orbit: , due to a cold restart of DDS. – One incident due to CrIS Full Resolution test Revealed the deficiency in handling swath with some packets missing. PCR34944 is being worked at low priority. 18

Justification for OMPS EV SDR to be Validated 19 Requirements (Performance Since Provisional) – Instrument: meeting specifications with adequate margins. – SDR: stable (quality and quantity) and free of major errors. SDR software – IDPS has been producing satisfactory products. – Incremental improvements are planned and will continue. Documentation – 7 presentations in this meeting – 5 Journal papers – ATBD – SDR User’s Guide (to be provided) – Error Budget table Applications: – Information contents are sufficient to make positive impacts. – Soft calibration is necessary, which can be applied to validated SDR.

Instrument Performance (to be elaborated by Pan) ParametersSpecification/Prediction ValueOn-Orbit Performance Non-linearity< 2% full well< 0.46% Non-linearity Knowledge< 0.5%0.1% On-orbit Wavelength Calibration< 0.01 nmNM: average ~ 0.01 nm RMS Stray Light NM Out-of-Band + Out-of- Field Response For NM ≤ 2average ~ ± 2% Intra-Orbit Wavelength Stability Allocation (flow down from EDR error budget) = 0.02 nm < nm SNR1000> 1000 from SV and EV Inter-Orbital Thermal Wavelength Shift Allocation (flow down from EDR error budget) = 0.02 nm nm CCD Read Noise60 –e RMS< 25 –e RMS Detector Gain 43 (for NP) 46 (for NM) 45 (for NP) 42 (for NM) Absolute Irradiance Calibration Accuracy < 7% average ~ 7% (5% for NM, 1~10% for NP) Absolute Radiance Calibration Accuracy < 8%< 5% 20

IDPS OMPS SDR CalVal Milestones 21 Time Provisional status 2012/03/13 Beta status First IDPS SDR Jan 2014 Validated status Feb 2014 NP Stray Light Mx8.1/ S-NPP Launch

Path Forward Suomi NPP – Instrument and SDR performance monitoring, characterization, and improvement. – Support instrument cal/val (e.g., orbit adjustment, anomaly resolution) – Complete documentation (Users’ Guide) – SDR software improvements Stray light correction Wavelength registration – Transition CAL SDR operation to GRAVITE. JPSS J1 – Analyze TVAC data and derive LUT for J1. – Develop science code for J1 More wavelength and higher data rate for EV SDR New algorithm for CAL SDR – Test data (high resolution data from S-NPP) 22

Summary With accomplishments achieved and efforts in progress, the OMPS nadir EV SDRs are found to have – Characterized for on-orbit sensor performance – Defined SDR product uncertainties over a range of representative conditions – Calibration parameters adjusted accordingly, pending soft calibration that can be applied to validated SDRs – Plan for later improved version – Strong versioning with documentation – Been ready for use in applications and scientific publication Request to declare that OMPS nadir EV SDR be Validated 23

BACKUP – LIST OF DR 24

12 DRs Open Since Provisional DR #AlgorithmBrief descriptionStatus 4818NP SDR OMPS Fixed bias impact on smear and/or radiance To be closed - Issue corrected 4693TC and NP SDRCAL SDR Strategy StudyTo be closed - Resolved with transition to Gravite 4676TC and NP EV SDR Radiance error associated with aggregation of the two center macropixels To be closed - Resolved with transition to Gravite 4673TC and NP CAL SDR Correction for different linearity slope Tup for CCD 2- Primary and redundant. To be closed - Resolved with transition to Gravite 4672TC and NP CAL SDRLinearity correction update xml file baslineTo be closed - Resolved with transition to Gravite 4671TC and NP SDR and EDR OMPS DQTT (DATA quality threshold tables) not existent for SDR and TBD for EDR To be investigated - TBD 4627TC and NP CAL SDR Quantization introduced by linearity correction error To be closed - Resolved with transition to Gravite 4615TC and NP CAL SDRTransient filterTo be closed - Resolved with transition to Gravite 4602TC and NP CAL SDRSpatial pixel mismatchTo be closed - Resolved with transition to Gravite 4318OMPS TC, NP SDR CAL SDR Subroutine Wave Monitor uses spectral range to bound spatial index To be closed - Resolved with transition to Gravite 4317TC and NP CAL SDRBias calculation errorTo be closed - Resolved with transition to Gravite 4316TC and NP CAL SDRLamp data mapping errorTo be closed - Resolved with transition to Gravite 25

12 DRs Led to CCRs DR #CCR #Description AERB DATE STATUS Sample table update to include extra pixel colum 3-OctImplemented RDR truncation needs correction10-OctImplemented TC EDR CTP modifications21-NovImplemented OMPS Version System Reference for OMPS GND-Pis 6-Feb Withdrawn – Replace as document in MIS system SDR provisional assignment7-MarImplemented TC and NP Provisional assignment17-AprImplemented SAA LUT update to inhibit SAA darks1-MayImplemented TC SL correction8-MayImplemented TC SL temporary table update1-JulImplemented Wavelength shift adjustment28-AugTo be implemented in NP SL correction6-NovTo be implemented in Request for S-NPP Orbital Inclination adj maneuver6-NovApproved HR Measurements in Nominal Mode9-Dec CCR Opened - Expected to be submitted by Dec 20 26

20 DRs in Progress DR #AlgorithmBrief description 7480TC and NP SDRQF error in CDFCB 7451TC SDROMPS NM Wavelength Scale 7450NP SDR OMPS NP Wavelength Scale 7401TC and NP SDR Raise Character Limit of the Version Number portion of the OMPS tables Filenames 7387TC SDRTC Straylight LUT update 7386TC SDRNominal measurements in High Resolution mode 7372TC SDRManeuver for Beta angle consistency in OMPS reference diffuser measurements 7358NP SDRG-ADA has duplicate algorithm input configuration files for OMPS SDR binaries 7341NP SDRNP EV SDR pre-processor to ingest high-resolution data 7340TC SDRTC EV SDR pre-processor to ingest high- resolution data 7335NP SDRSpectrum adjustment for Solar activity variations 7315TC SDROMPS Fixed bias impact on smear and/or radiance - TC SDR 7260NP SDRImpact of wavelength scale shift characterization for the OMPS NP SDR 7210TC SDR and EDROMPS Anomaly 03/12/13-Missing Packets 7059TC and NP EV SDRMissing Data in SDS and CLASS 7015TC and NP EV SDRCDFCB suggestions for version field clarification 5034TC and NP EV SDROMPS Version Reference Document 5008NP SDR and EDRNP SDR (and EDR) fails for Sample Table with extra pixel column 4978TC SDR and EDRTC EDR fails for Sample Table with extra pixel column 4927TC and NP SDRFT document and 148 need update 27