Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Advertisements

18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
West Contra Costa Unified School District
Central Valley Flood Protection Board Meeting – Item 6.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8B Central Valley Flood Protection Board.
New Orleans’ Levee Failures Chalston Layacan Elizabeth Lenker Jamie Mellies.
Geographic Inquiry: Why did New Orleans Flood?.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Central Valley Flood Protection Board Meeting – September 27,
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Mississippi and Atchafalaya River Flood Briefing May 9, 2011 National Weather Service Lower Mississippi River Forecast Center and Weather Forecast Office.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Who Uses Stream Gage Data? Janet Thigpen, CFM Flood Mitigation Specialist Southern Tier Central Regional Planning & Development Board.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Flood Management Dealing with Floodplains in Missouri.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® Kansas Citys, Missouri and Kansas Flood Risk Management Project Presentation to Kansas City Industrial Council.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Permit Process.
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Hurricanes. Katrina approaching New Orleans August 2005.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
VETERANS MEMORIAL PARK River Valley Veterans Coalition Committee Members Allen Kimball AL, Post 20 A.M. Armstrong VFW, Post 2283 Harold Davis DAV, Chapter.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
Central Valley Flood Protection Board October 25, 2013 Presented by: Michael Mierzwa, P.E. Chief of the FloodSAFE Program Management Office California.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
Impacts of Salinity on El Paso’s Surface Water Supply presented at the Annual Salinity Management and Desalination Summit December 8, 2003 Michael P. Fahy.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Vintage Plaza City Council and Redevelopment Agency August 21, 2007 Agenda Item 9.01.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
Small Town Service ~ Community Stewardship ~ Future Focus ALBRIGHT OFFICE PARK Planned Development PD Architecture and Site S Environmental.
US Army Corps of Engineers BUILDING STRONG ® 2011 Flood Recovery The Benefits of Collaboration Maria de la Torre Chief, Emergency Management Baltimore.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
2012 Central Valley Salmon Sport Fishing Regulations California Department of Fish and Game California Fish and Game Commission March 7, 2012.
Downtown Marina and Promenade January 8, 2008 Agenda Items 6.05 & 6.09.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
بسم الله الرحمن الرحیم. Jet grouting.
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Why do people try to manage rivers?.
2011 CV Salmon Season.
Appeal: Time Extension for Variance # East Walnut Street
Construction Management & Inspection
Hydrologic Engineering
I Street Bridge Replacement Project
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
Presentation transcript:

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B

Consider approval of Res. No to:  Adopt the Mitigated Negative Declaration, Findings, and Mitigation, Monitoring and Reporting Plan for the R3A, L10, L7 and R7 Levee Improvement Projects;  Delegate authority to the Executive Officer to execute the Notice of Determinations;  Approve the R3A, L10, L7 and R7 Levee Improvement Projects 2

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B  Project Partners  Federal – US Army Corps of Engineers  State – Central Valley Flood Protection Board  Local – Sacramento Area Flood Control Agency 3

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B 4  Increasing American River’s capacity to 115,000cfs plus 3ft freeboard  Accommodates Folsom Dam Modifications Project

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B 5  All project cut-off walls will use Jet Grout method.  Jet Grout technique includes a drilling phase followed by withdrawal and rotation with simultaneous injection of fluids at high pressure to form columns.  Columns are overlapped to form a cut-off wall.

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Location of R3A Project  Off of Business I-80.  Across from the California Exposition Center. 6

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Description of R3A Project:  Levee improvements will be made in two locations on the American River South Levee.  Cutoff walls will be extended by approximately 75- feet on the upstream side of the Capital City Freeway and 67-feet downstream of the Freeway. 7

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Location of L10 Project:  Along the south side of the American River.  At Howe Ave Bridge. 8

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Description of L10 Project:  Levee improvements will be made on the American River levee on the south side.  A soil-cement cutoff wall will be installed under the Howe Avenue bridge.  A low permeability soil blanket will be installed connecting with the cutoff wall. 9

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Location of R7 and L7 Projects  Off H Street (Fair Oaks) Bridge.  Near Sacramento State University. 10

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Description of R7 Project:  Existing levee approximately 11 feet height and a crown width of approximately 10 to 15 feet, with an asphalt road on the levee crown on both sides of bridge.  Dirt ramps on both sides of the bridge connect the levee crown.  The gap between these 2 ramps is 151 feet and will be used for jet grouting. 11

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B 12 Description of L7 Project:  Existing levee approximately 12 feet height and a crown width of approximately 18 to 20 feet, with an asphalt road on the levee crown on both sides of the bridge.  Dirt ramps on both sides of the bridge connect the levee crown.  The gap between these 2 ramps is 325 feet and will be used for jet grouting.

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Board adopt Resolution No which constitutes the Board’s written findings and decision in the matter. The Resolution contains the following:  Adoption of the Mitigated Negative Declarations  Adoption of the Mitigation, Monitoring and Reporting Plans  Delegate authority to the Executive Officer to execute the Notice of Determinations  Approval of the American River Common Features Sites R3A, L10, L7 and R7 13

Central Valley Flood Protection Board Meeting – Agenda Item No. 13B Questions? 14