New Transmission Lines Update 1 Sandi Patty, PPRP September 27, 2010 Image or Graphic.

Slides:



Advertisements
Similar presentations
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Advertisements

Greater Crofton Council Educational Forum Solid Waste Management June 28, 2005.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Public Service Company of New Mexico
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
1 CPV Maryland, LLC St. Charles Facility – an Update Sandra S. Patty PPRP Manager PPRAC Meeting Country Inn & Suites, Annapolis, MD August 26, 2008.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Career and Technology Student Organizations An integral part of CTE success William Nottage, State Director DECA/FBLA Division of Career and College Readiness.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Despite Order No Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Electric and Gas Supplier Orientation Conference June 18, 2009 Laurie H. Duhan Director, Choice Programs Baltimore Gas and Electric Company.
Charles Hosken, General Manager Imperial Irrigation District
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
CBP BMP Verification Program Development: Progress to Date and Forthcoming Issues CBP Management Board Briefing May 9, 2012 Meeting.
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Transmission interconnect into the existing ‘Durbin-Monterey’ 69kV line 
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
Brio Rapid Transit System Update on Stations and Timetables July 10, 2012.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
University Information Technology 1 TAB Data Center Renovation Update 11/08/12.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
AESO Update to PCC March, AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
Work Related to Senate Bill 2202 (effective January 1, 2001)
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
Transition Plan Network Operations Model Change Requests 5/26/2010.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
Planning Conference on Maryland’s Energy Future Dan Ervin Ph. D., Director, ShoreENERGY™ The Energy, Economic and Sustainability Program of the Franklin.
PJM ©2007 NERC LTRA Workshop August 16, 2007 Paul McGlynn Manager, Transmission Planning Department.
PJM ©2007 Transmission Planning Maryland Public Service Commission Planning Conference Mike Kormos Senior Vice President Reliability Services.
1 PLANNING CONFERENCE ON MARYLAND’S ENERGY FUTURE WILLIAM GAUSMAN VICE PRESIDENT ASSET MANAGEMENT JULY 25 – 26, 2007.
Four Winds Condominium Association August 2, 2017
DICKINSON AVENUE RECONSTRUCTION
Extensive Experience in Electrical Utilities
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
SunZia Project Description
Appendix: 2017 RTEP Report Key Graphics and Information
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Dominion Investments in Virginia
25th Avenue Grade Separation
25th Avenue Grade Separation
NERC LTRA Workshop August 16, 2007
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
TxMAG presentation
Strategic Planning Timeline Overview
CBP Principals’ Staff Committee Briefing May 14, 2012 Meeting
Maryland Offshore Windfarm Project
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
2015 January February March April May June July August September
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

New Transmission Lines Update 1 Sandi Patty, PPRP September 27, 2010 Image or Graphic

New Transmission Lines Update 2 Overview of Proposed Transmission Line Projects

New Transmission Lines Update 3 PATH Project – Potomac Edison –275 miles of 765-kV transmission –Originating in WV, terminating at Kemptown, MD –New substation in Kemptown, MD and a mid-point substation in Welton Spring, WV to connect PATH and TrAIL lines

New Transmission Lines Update 4 PATH Project History and Status –Approved by PJM as a backbone transmission project in 2007 –In July 2010, PSC determined that Potomac Edison, an Allegheny Energy affiliate, was an appropriate applicant (Case No. 9223) –Preliminary PJM 2010 RTEP studies support the need for the PATH Project with June 1, 2015 in-service date –Potomac Edison filed Supplemental Direct Testimony on July 16 and Sept. 14, 2010 –PSC Pre-Hearing Conference scheduled on Sept. 28, 2010 –National Park Service leading NEPA process coordination

New Transmission Lines Update 5 MAPP Project – Pepco Holdings –78 miles of 500-kV HVAC and 87 miles of 640-kV HVDC transmission lines –AC/DC converter stations to be constructed in Calvert, Wicomico, and Sussex Counties –Crosses Potomac, Patuxent, and Nanticoke Rivers (overhead) and the Choptank River and the Chesapeake Bay (submarine)

New Transmission Lines Update 6 MAPP Project History and Status – Phased Applications –Southern Maryland & overall need (Case No. 9179) PPRP filed Direct Testimony in December 2009 Applicants requested suspension of procedural schedule in January 2010 –Eastern Shore (not yet filed) Pre-application studies in progress –Preliminary PJM 2010 RTEP studies support the need for the MAPP Project with June 1, 2015 in-service date MAPP Project – Choptank River and Dorchester County

New Transmission Lines Update 7 In-State Projects – Allegheny Power –Ringgold-Catoctin-Walkersville-Monocacy & Carroll-Catoctin (MRC) Project Rebuild of 40 miles of 138-kV to 230-kV CPCN Application filed late July 2010 –Doubs-Lime Kiln Allegheny’s MRC Transmission Line Project

New Transmission Lines Update 8 In-State Projects – BGE –Bagley-Graceton Rebuild of 14 miles of single-circuit 230-kV to double-circuit Plan of Study provided to PPRP in March 2010 –Graceton-Conastone Installing second 230-kV circuit on 8-mile stretch of existing towers Relocation of 1.5 miles of 115-kV line Plan of Study provided to PPRP in March 2010 –Raphael Road-Bagley Rebuild of 6 miles of single-circuit 230-kV to double-circuit Proposed in 2008, but application was withdrawn –Bagley Substation By-pass Line 230-kV CPCN Waiver Request denied by PSC in Sept 2010

New Transmission Lines Update 9 In-State Projects – Continued –Big Savage, LLC PA wind power 138-kV interconnection –Pepco Burches Hill-Palmer’s Corner Oak Grove-Ritchie- Benning Dickerson-Pleasant View Proposed Pepco Transmission Line Projects

New Transmission Lines Update 10 In-State Projects – Continued –Delmarva Power (Eastern Shore) Bishop-Indian River –12.3 miles (1.9 miles in MD), new 138- kV transmission line –CPCN application expected Nov 2010 Church-Townsend –12.4 miles, 138-kV rebuild –CPCN application expected mid-2011 Vienna-Steele –28 miles, 230-kV rebuild –CPCN application expected mid-2011 Church-Wye Mills –25.9 miles, 138-kV rebuild Loretto-Princess Anne –3.25 mile rebuild Vienna-Loretto –19.5 miles, 230-kV rebuild –On hold as of Aug 2010 Loretto-Piney Grove –9.5 miles, 230-kV rebuild –On hold as of Aug 2010 Proposed Delmarva Power Transmission Line Projects

New Transmission Lines Update 11 Questions?