CVEN 5838 Aug 28, 2008 Lecture 2 Reservoir Capacity Yield Analysis (how to size a reservoir and measure its performance)

Slides:



Advertisements
Similar presentations
RSLAB-NTU Lab for Remote Sensing Hydrology and Spatial Modeling 1 An Introduction to R Pseudo Random Number Generation (PRNG) Prof. Ke-Sheng Cheng Dept.
Advertisements

Storage Reservoirs for Urban Water Supply/Chapter 9 LowLift Intake Conduit Treatment High Lift ConveyanceConduit DISTRIBUTIONRESERVOIR Distribution Supply.
Efficiency and Productivity Measurement: Bootstrapping DEA Scores
April 2004NUCAD Northwestern University1 Minimal Period Retiming Under Process Variations Jia Wang and Hai Zhou Electrical & Computer Engineering Northwestern.
INTRODUCTION CHAPTER 1 Ercan Kahya Civil Eng. Dept., ITU
Decomposition Method.
Generating Random Numbers
Monte Carlo Methods and Statistical Physics
The NAM Model. Evaporation Overland flow The excess rainfall is divided between overland flow and infiltration.
Experimental Design, Response Surface Analysis, and Optimization
Department of Civil Engineering, I.T.U
Engineering Hydrology (ECIV 4323)
Water Resources Planning and Management Daene C. McKinney River Basin Modeling.
Planning under Uncertainty
Selection of Capacity Selection of capacity depends on: Physical characteristics Physical characteristics Inflow outflow characteristics Inflow outflow.
Chapter 9 Net Present Value and Other Investment Criteria
I. Reservoirs Reservoirs are natural basins. Reservoirs are natural basins. It is usually surrounded with mountains or high areas. It is usually surrounded.
Resampling techniques Why resampling? Jacknife Cross-validation Bootstrap Examples of application of bootstrap.
CHAPTER 13 Measurement of Interest-Rate Risk for ALM What is in this Chapter? INTRODUCTION RATE-SHIFT SCENARIOS SIMULATION METHODS.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reservoirs Balancing Supply and Demand Ashokan Kensico Hillview Croton Reservoir Spillway.
Lecture 5: Learning models using EM
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Reservoirs Balancing Supply and Demand Ashokan Kensico Hillview Croton Reservoir Spillway.
Chapter 9 Net Present Value and Other Investment Criteria
Colorado River Water Availability Assessment Under Climate Variability Annie Yarberry 1, Balaji Rajagopalan 2,3 and James Prairie 4 1. Humboldt State University,
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
Topic 9 Time Value of Money.
Analyses of Rainfall Hydrology and Water Resources RG744
Water Resources Planning and Management Daene C. McKinney Simulating System Performance.
Chapter 15 Forecasting Copyright © 2011 Pearson Addison-Wesley. All rights reserved. Slides by Niels-Hugo Blunch Washington and Lee University.
1 CE 530 Molecular Simulation Lecture 7 David A. Kofke Department of Chemical Engineering SUNY Buffalo
Economic Cooperation Organization Training Course on “Drought and Desertification” Alanya Facilities, Antalya, TURKEY presented by Ertan TURGU from Turkish.
Outline Terminology –Typical Expert System –Typical Decision Support System –Techniques Taken From Management Science and Artificial Intelligence Overall.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
HEC-HMS Runoff Computation.
1 Integrated Water Resource Planning Systems User Forum WRYM - New features 1 July 2004.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
CHAPTER 5 Inventory Control Subject to Uncertain Demand McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
MARE 250 Dr. Jason Turner Multiple Regression. y Linear Regression y = b 0 + b 1 x y = dependent variable b 0 + b 1 = are constants b 0 = y intercept.
Monté Carlo Simulation  Understand the concept of Monté Carlo Simulation  Learn how to use Monté Carlo Simulation to make good decisions  Learn how.
Approximate Three-Stage Model: Active Learning – Module 3 Dr. Cesar Malave Texas A & M University.
Multi-state System (MSS) Basic Concepts MSS is able to perform its task with partial performance “all or nothing” type of failure criterion cannot be.
Operational Research & ManagementOperations Scheduling Economic Lot Scheduling 1.Summary Machine Scheduling 2.ELSP (one item, multiple items) 3.Arbitrary.
Reservoir Operation Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L2 Simulation.
OASIS Basics Computer Aided Negotiations of Water Resources Disputes.
Stochastic Optimization
CE 3354 Engineering Hydrology
Water Resources Planning and Management
Multi-objective Optimization
Introduction and River Basin Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L1 Simulation.
CE 3354 ENGINEERING HYDROLOGY Lecture 6: Probability Estimation Modeling.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Linear Programming and Applications
ERT 246 Hydrology & Water Resources Eng.
Problem 1: Service System Capacity CustomersServed Customers Queue Server Problem: Can a server taking an average of x time units meet the demand? Solution.
MONTE CARLO SIMULATION MODEL. Monte carlo simulation model Computer based technique length frequency samples are used for the model. In addition randomly.
P4 Advanced Investment Appraisal. 2 2 Section C: Advanced Investment Appraisal C1. Discounted cash flow techniques and the use of free cash flows. C2.
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
HEC-ResSim 3.3 New Features to Support Complex Studies
Chapter 12: Kay and Edwards
Root Finding Methods Fish 559; Lecture 15 a.
Why Stochastic Hydrology ?
NATCOR Stochastic Modelling Course Inventory Control – Part 2
Reference: Mays and Tung 7.1, 7.2.1, 7.3, 7.4
Se-Yeun Lee1, Alan F. Hamlet 1,2, Carolyn J. Fitzgerald3, Stephen J
GCE PROFESSIONAL BUSINESS SERVICES AS 3
Lecture 2 – Monte Carlo method in finance
Network Screening & Diagnosis
Dynamic Programming and Applications
Computer Vision Lecture 19: Object Recognition III
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Presentation transcript:

CVEN 5838 Aug 28, 2008 Lecture 2 Reservoir Capacity Yield Analysis (how to size a reservoir and measure its performance)

CVEN 5838 Aug 28, 2008 Reservoir Yield: Controlled Release from a reservoir (or system of reservoirs). Often expressed as a ratio of % of mean annual flow. E.g., 70% yield means the reservoir can provide a regulated release of 70% of the mean annual flow. The Yield depends on the active storage capacity of the reservoir Reliability of Yield: probability that a reservoir will be able to meet the demand in any particular time interval (usually a year) Reliability = Ns/N Ns is number of intervals in which demand was met; N is the total number of intervals Firm Yield: can be met 100% of time

CVEN 5838 Aug 28, 2008 Estimating Active Storage Capacity Mass Balance Equation of Reservoirs S t-1 + Q t – R t – L t = S t S t-1 + Q t – R t – L t = S tWhere S t-1 is storage at end of previous time interval S t is storage at end of current time interval S t is storage at end of current time interval Q t is inflows at current time interval Q t is inflows at current time interval R t is release at current time interval R t is release at current time interval L t is loss (evap/seepage) at current time interval L t is loss (evap/seepage) at current time interval Reservoirs have a fixed storage capacity, K, so S t <= K for each interval

CVEN 5838 Aug 28, 2008 Mass Diagram Analysis (Rippl) Method 1. Plot cumulatives 2. Add demand line 3. Find max deficit Find the maximum positive cumulative difference between a sequence of pre- specified (desired) reservoir releases R t and known inflows Q t. Record of historical inflows is used, typically Example: Nine period-of-record flows: [1, 3, 3, 5, 8, 6, 7, 2, 1] R t =4

CVEN 5838 Aug 28, 2008 Mass Diagram Analysis (Rippl) Method Repeat the hydrologic sequence in case critical period is at end Start demand line at full reservoir R t =4 Calculate Active Storage K a as max accumulated storage over 2 successive periods of record

CVEN 5838 Aug 28, 2008 Mass Diagram Analysis (Rippl) Method The maximum capacity is determined by the Critical Period Critical Drawdown Period: Longest period from full reservoir condition to emptiness Longest period from full reservoir condition to emptiness Critical Period: Longest period from full condition, through emptiness and to a full condition again

CVEN 5838 Aug 28, 2008 Problems with Mass Diagram Method  Reservoir release needs to be constant (this is not accurate for monthly interval as demands are often seasonal)  Assumes that future hydrology is like the past  Cannot compute storage size for a given reliability  Evaporation and other losses that depend on level in reservoir cannot be factored into analysis

CVEN 5838 Aug 28, 2008 Reservoir Planning by Simulation  Simulation models are based on mass balance equations and take into account all time-varying processes as well as elevation-based processes (losses) Simulation based techniques are called Behavior Analysis  Why is it difficult to use simulation for reservoir sizing?  Another type of “simulation” is based on deficit instead of storage. This solves some of the simulation problems.  Approach is called Sequent Peak Algorithm

CVEN 5838 Aug 28, 2008 Sequent Peak Analysis Let K t be the maximum total storage requirements needed; Set K 0 = 0 Example: Nine period-of-record flows: [1, 3, 3, 5, 8, 6, 7, 2, 1] Apply the equation consecutively for up to 2x the total length of the record. The maximum of all K t is the required storage capacity for the specified releases R t and inflows Q t

CVEN 5838 Aug 28, 2008 Accounting for Losses Evaporation and Rainfall (net losses) depend on Surface Area Surface area depends on storage non linearly: But can be approximated linearly:

CVEN 5838 Aug 28, 2008 Accounting for losses  Losses can alter the critical period and change the storage capacity  Net evap (equations) can be included in storage based simulations directly  Lele and Montaseri developed methods for including evap in SPA in an interative approach (See McMahon et al., Sequent Peak Algorithm paper on class website)  An alternative evap model can be used directly with SPA

CVEN 5838 Aug 28, 2008 Reliability Reliability (time-based) - Ns/N Resiliance – Speed of recovery Vulnerability – severity of failure (volumetric reliability) (Tradeoffs on these 3 lead to very tricky design; several authors have developed indices that attempt to combine these (Loucks, 1997; Zongxue, 1998) Reliability and Vulnerability can be integrated into SPA: Determine number of failure periods permitted (from reliability) Determine number of failure periods permitted (from reliability) Determine reduced maximum reduced capacity permitted (from vulnerability) Determine reduced maximum reduced capacity permitted (from vulnerability) See example in McMahon See example in McMahon

CVEN 5838 Aug 28, 2008 Classification of S-Y-P Procedures (Storage – Yield – Performance)

CVEN 5838 Aug 28, 2008 Behavior Analysis – storage based simulation (detailed simulations of processes) Case 1: Estimate System Performance Active capacity of reservoir is known. Series of demands is given (could be stochastic). Starting condition is known or assumed. Historical or synthetic inflows are used (could be many traces) (index sequential or monte carlo) Case 2: Find size of reservoir under consideration Series of demands is known (could be stochastic) series of inflows is given (historical or generated stochastic) Performance criterion is specified Estimate reservoir capacity; do simulations; adjust until get performance desired Case 3: Estimate Yield of an existing reservoir Specify performance criteria (reliability, vulnerability, maybe resiliance) Use historic or stochastic hydrology Estimate demand (yield) and iterate until meet performance criteria Need to know and model detailed operating procedures

CVEN 5838 Aug 28, 2008 Additional important topics  Optimization techniques simple ones can give identical results to SPA more complex methods can include cost functions  Multiple reservoir systems single-reservoir techniques can be extended to multi- reservoir systems determine size at each site specify operating policies for releases and demands (heuristic policies have been developed) typical objective is to keep reservoirs balanced