Conventional Magnets Technology Discussion Summary At the LCFOA meeting, 1May at SLAC Cherrill Spencer, ILC at SLAC 2nd May 2006.

Slides:



Advertisements
Similar presentations
DT Coursework By D. Henwood.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Facilities and Aggregate Planning. A digression I am not an advocate of gambling, but use an example here that you might draw on later. Say I have a coin.
Oct 24, 2007 C.Spencer Magnet EDR Planning 1 GDE Generating Magnet Work Packages: Planning for the Engineering Design Phase Cherrill Spencer, SLAC with.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Introduction to the ILC’s Conventional Magnets For the LCFOA meeting at SLAC Cherrill Spencer, ILC at SLAC 1 st May 2006.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
M. White – June 28, 2004 LCLS Requirements Meeting In a project, we live or die by the schedule. After we’re “baselined” it is our plan for what we will.
ATF2 Power Supply Availability Comparison February 5, ATF2 Power Supply Availability C0mparison Paul Bellomo and Briant lam.
ROLE OF MARKETING IB BUSINESS & MANAGEMENT A COURSE COMPANION P
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Oct 11, 2007 C.Spencer Magnet RDR Completeness 1 BDS KOM Conventional DC Magnets in the Beam Delivery System: their completeness in the RDR Cherrill Spencer,
Mathematical Methods Wallands Community Primary School
CS 111 – Nov. 19 Enterprise databases, continued –Review tables, joins, queries –Restricting one’s view of entire database –Design considerations –Concurrency.
Fermilab July 19, 2006 J. Tompkins -1- RDR Magnet Systems Group Vancouver GDE Meeting Overview J. Tompkins, FNAL.
© New Zealand Ministry of Education copying restricted to use by New Zealand education sector. Page 1 Consider the Evidence Evidence-driven.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Dr. Catherine Turner Assembly drawings.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Approaching the design of ILC conventional magnets for the RDR Cherrill Spencer, ILC 25 th April 2006.
May, 2005(c) 2005, US Civilian R&D Foundation1 The U.S. Civilian Research and Development Foundation (CRDF) Industry Partner Development Program (PDP)
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Documentation.
Some Value Engineering Proposals For LBNE Beamline.
11/15/11 - L16 Professional TalksCopyright Joanne DeGroat, ECE, OSU1 Professional Talks.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
PROJECT TITLE Your name | Your teacher’s name | John W. Dodd Middle School.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
S-BPM Support Issues to be discussed with LAPP and KNU
ILC RTML Meeting EDR Planning for Magnet Power Systems
Availsim runs and questions
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
CHEN, Fusan KANG, Wen November 5, 2017
Points To Consider While Buying Data Center Services In 2018.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Page Headline Splitters.
Series of Paragraphs Expressing an Opinion
Brief Status Report on Fabrication of ATF2 Quads
J. Seeman Assistant Director for PPA/LCLS
Reading and effective note-making
Series of Paragraphs.
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

Conventional Magnets Technology Discussion Summary At the LCFOA meeting, 1May at SLAC Cherrill Spencer, ILC at SLAC 2nd May 2006

Cherrill Spencer, SLAC Conv Magnets Technology Discussion 2 Overview of Conventional Magnets Discussions, held jointly with “Electronics” group  Two magnet manufacturing companies represented plus one that specializes in power cables & non- magnetic materials  ILC asked “what else do you need to know?”  Industry answered: “how can we actually help you?” Summary on following slides, but first, as the huge quantity of conventional magnets needed for the ILC, colors the situation:  Here is the INAUGURAL table of ILC MAGNET QUANTITIES

2nd May 2006Cherrill Spencer, SLAC Conv Magnets Technology Discussion 3 The LCFOA is the first entity, worldwide, to see the inaugural ILC Magnet Count : quantities are PRELIMINARY and WILL change! ILC MAGNET COUNT: Inaugural Publication Magnet Type Grand TotalsSourcesDamping Rings 2 RTML2 Linacs2 BeamDel e-e+ e-DR2e+DR StylesQuantityStylQty StyleQty StyleQty Styl eQtyStylQty Dipole Quad Sextupole Solenoid Corrector Pulsed/Kickers/Sept a Wiggler Octupole/Undulator Totals Totals w/o correctors ILC Magnet count for 250Gev on 250Gev beams with baseline configuration Compiled by Cherrill Spencer, ILC Magnet Systems Group, Inaugural Publication: 1May 2006 Preliminary Magnet Count

2nd May 2006Cherrill Spencer, SLAC Conv Magnets Technology Discussion 4 Summary of discussions, page 1/3  Putting aside the 10,160 correctors leaves 10,840 conventional magnets of 146 different styles to be designed and fabricated in 5-7 year – focus on the required high availability of the magnet system (= magnets + power supplies)  We have a 2-3 year window now during which ILC magnet engineers are allowed to work with magnet vendors on improving the reliability of conventional magnets and designing them for easier manufacture ILC says: To meet these production challenges we will : Have uniform standards for common materials such as ferrite, steel, conductor, cooling hoses Have a restricted list of approved off-the-shelf parts: water fittings, insulation, epoxies

2nd May 2006Cherrill Spencer, SLAC Conv Magnets Technology Discussion 5 Summary of discussions, page 2/3  Magnet vendors can deal with “edicts” about materials to be used- as long as ILC has done its homework and the material (e.g. potting epoxy) really works, and it has been optimized for large quantities. Cost savings possible if the magnet engineering has been done with bulk production in mind.  Concern expressed by industry: will the ILC management not say “Magnets and power supplies are mature technologies and so don’t need a lot of R&D money spent on them”?  Spencer’s opinion: our management already appreciates the importance of the need for significantly improved reliability of magnets and PS and I expect to be able to secure some R&D funding to carry out some tests and design & build some prototype magnets.

2nd May 2006Cherrill Spencer, SLAC Conv Magnets Technology Discussion 6 Summary of discussions, page 3/3  Discussed : how can the LCFOA and US magnet companies help us with our present cost estimating exercise? If ILC sends them drawing packages of magnets similar to ILC ones they can provide ILC with cost estimates.  Conclusion: ILC magnet engineers and interested US magnet companies will get together regularly to have roundtable (i.e. not too many formal presentations) discussions about detailed magnet engineering with the goals of improving conventional magnets’ manufacturability, reliability, repairability and minimizing cost (without ruining companies’ profitability!).  Spencer will take these conclusions back to the ILC Magnet Systems group and make sure we arrange some meeting in the next few months.

2nd May 2006Cherrill Spencer, SLAC Conv Magnets Technology Discussion 7 A CHALLENGING ASPECT OF ALL ILC COMPONENTS IS MAKING THEM RELIABLE ENOUGH  Some examples of scaling of availability using actual SLAC magnet power supply’s MTBF (~100,000 hours) and MTTR (~1.5 hours) Availability of one PS = A of 400 PS = = or 99.4% A of 4000 PS = = 94.2 % A of 10,000 PS = = 86.1 % Most recent availability model of the ILC demands 97.1% availability of all the power supplies – clearly not met if PS system not modified. Note to ILC Availability Group: need to re-run the model with the latest magnet and PS counts!