POWER MARKETS HOPES & CONCERNS OPCOM Romanian market operator.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

- GDP 2011 versus 2010 – increase by 5.5%
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
EuroPEX position on Market Transparency and practical example from Nordic Market Baltic Electricity Mini-Forum, Riga, 24th April Pasi Kuokkanen Nord Pool.
Guidelines for Good Practice on Information Management and Transparency EuroPEX Comments and Suggestions Brussels, 6 th of July 2006.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Transelectrica - The Romanian TSO: Chalenges and Perspectives Bogdan Popescu-Vifor Director Strategy, Planning, Marketing & Sales Transelectrica SA Conferinta.
Draft document – Work in progress
APPLICATION OF THE ERES SUPPORT MECHANISM IN ROMANIA Primary and Secondary Legislation 1.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
1 Meeting the Regional Electricity Market Opportunities South East Europe Energy Week “Athens Forum” Meeting Rome, March 2003.
JP “Elektromreža Srbije” security reliability sustainability.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE Challenges in transitioning to a liberalised, competitive market – Romanian experience.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
Update on electricity market Baltic Mini Forum 1 October, 2010.
Is there a need for a change?
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
DRAFT Discussion Paper on the Options for the Transition Phase of the ECSEE Regional Energy Market Donors meeting Vienna, 13 July 2004.
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
SESSION 1 - PART 1: EUROPEAN MARKETS SITUATION “MARKET TRANSPARENCY SITUATION IN EUROPE” Maria luisa Huidobro President & CEO of OMEL 2006 APEX Conference.
SESSION 1. Part 4 IMPORTANCE OF INTRADAY AND ADJUSTMENT MARKETS José Javier González Market Operations Director OMEL 2008 APEX Conference Sydney, October.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Balancing electricity market and future of the organized market in BiH
2nd Mini-Forum for Central West Electricity REM
Market Coupling and Ways Forward Lene Sonne Vice President, Market
The 3rd package for the internal energy market
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Electricity Wholesale Markets: Designs for a low-carbon future
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
Presentation transcript:

POWER MARKETS HOPES & CONCERNS OPCOM Romanian market operator

Turning now the Face to the Future 2000 – 2005 FIVE YEARS ACTING AS A DRIVING FORCE IN THE NATIONAL FRAMEWORK

Stages of the liberalization process: - -Unbundling, big generation companies splitted or forced to divest; distribution splitting - - Privatization; - -Consolidation, vertical integration through mergers and acquisitions; Spot Market launch before privatization Impact on participants’ number, liquidity, competition, price Romanian Way After 1990, the consumption declined in Romania: excess of capacity was encouraging the competition realistic vision about “after unbundling” Increasing opening degree Unbundling: generation, transmission, distribution, retailers, operators: transmission&system, distribution, metering,market,

This was OPCOM until now: Since June, 2005 OPCOM is dealing with Main Roles of a Power Exchange : - -To provide a reliable reference price for other physical and financial markets; - -To support the reliable generation schedule making. For a marketplace to face the challenges of the liberalization process is a “never ending story”: Each stage is rising different problems. The Marketplace has to prospect these challenges, correctly appraise the impact, cooperate with and ask for support of the regulator. Forecast, scheduling, ancillary services, Long term contracted Electricity passing daily through the market …. developing markets Participants number

Different Markets and Related Products for Different Time Delivery negotiation / auctionauction day ahead bidding, ( D-1) years, months day ahead ( D-1) real time (D) Balancing market, Imbalances, Ancillary Services Market voluntary markets voluntary market mandatory market Bilateral Contracts’ Market: OTCs PX traded DAM OPCOM’s Additional Products and Services Settlement Agent Green Certificate Market Operator to protect against to limit the imbalances to correctly recompensate the real price liquidity to undertake the opportunities time balance contribution, to penalize imbalances Power Market: The Multi-Market Concept Administrated by OPCOM Administrated by Transelectrica

First Eight Months New DAM Operation in OPCOM By the end of 2005 two new other products: BCCM, GCCV 30 June – 28 February LIQUIDITY and ELECTRICITY PRICING

ELECTRICITY PRICING In present, OPCOM is operating three centralized electricity markets, therefore establishing related prices through specific mechanisms. Winners: the market price is better than the offered one Losers: Something has to be changed Efficiency? Bid Strategy? DAY AHEAD MARKET 30 June 2005 GREEN CERTIFICATE MARKET 16 November 2005 CLOSEDAUCTIONS BILATERAL CONTRACTS MARKET 8 December 2005 Sell Offer Buy Offer 1 Buy Offer 2 Buy Offer n selected as winner Buy Offer n+1 If equal, together selected for a new round PUBLIC AUCTION Buy Offer i Sponsored by EC, WB, Transelectrica Sponsored by EC, Co-financing OPCOM Inside development

Question: HOW MUCH IS INTERESTING THE DAM ? Conclusion: Active participants’ number in bidding increased every month. Number of the registered participants Active participants’ number Number of participants concluding transactions

TRADED VOLUMES EVOLUTION July August September October November 281, MWh 288, MWh

September October November 281, MWh 288, MWh Sellers Buyers Question: WHAT ABOUT CONCENTRATION ? Variable volumes as monthly trend and daily/hourly fluctuation, demonstrating the undertaking of random opportunities, depending on early contracted volumes facing less predictable demand or unexpected outages. Reasonable concentration during normal periods. January JulyAugustSeptemberOctober NovemberDecember February

PRICE EVOLUTION Less depending on gas prices, not so high as Dutch, English, Spanish or Italian prices, not all time so low as Nordic or East European prices, influenced more by the balance between demand and generation, by the plenty presence or lack of water. Average Market Clearing Price Question: THE PRICE: HOW MUCH VOLATILE, WHAT ABOUT TRAND OR CYCLIC BEHAVIOUR?

After the First Eight Months New DAM Operation 30 June – 28 February EUROPEAN POSITION OMEL EEX PowerNext GME NORDPOOL APX-Group Borzen EXXA OPCOM PPX OTE

NOVEMBER (5) Note: To calculate spot trades share, the hourly avg. consumption registered in 2004 was taken into consideration. Consequently, if the consumption increased in 2005, the real quotas are less than presented ones. Conclusion: OPCOM fifth place as quota and volume, after Nord Pool, EEX, APX and Powernext, sixth place as price, in February Average traded volumes Spot market quota Question: How much liquid? In Europe placed where?

European spot prices July 2005 – February 2006

6.21% Opcom, a permanent presence in European Press

After Five Years in the Center of the Wholesale Market and Eight Months New Mechanisms for National and Regional Spot Trading Focusing on regional trading interest collecting REGIONAL TARGETS

What European Commission is expecting from the power exchanges? “Power Exchanges are also likely to have a key role in developing the Single European Electricity market by providing transparent, non-discriminatory access to electricity trading in the European Union, insuring the proper functioning of electricity markets.” “It is expected that Power Exchanges will harmonize trading arrangements so as to facilitate the final single electricity market objective.” Bruxelles, , DG TREN Strategy Paper Medium Term Vision for the Internal Energy Market

“ Power exchanges in the region together with Europex will work on introducing bilateral trading clearing for the whole region (action Borzen, OPCOM and EuroPex).” “SEE: Power exchanges in the region together with Europex will work on establishing a spot market for all zones in the region (action Borzen, OPCOM and EuroPex).” “Power exchanges will study organizing an intra-day market on a regional basis (action Borzen, OPCOM together with EuroPex).” Bruxelles, 05 December 2005, DG TREN/C2/MS South East Electricity Market options paper,v.4 Document presented in the framework of the seventh Athens forum (Belgrade, nov.2005), by undertaking the conclusions of the first Athens mini forum (Athens, 6-7 oct.2005) What European Commission and Athens Forum are expecting from OPCOM?

Regional targets: World Bank proposal: “ support a phased approach to market opening, starting with trading based on bilateral contracts and TPA, moving to a more sophisticated model only after the institutional framework is sufficiently developed; power markets across the borders The bilateral contract market needs: - - Reliable interconnection capacity market-based allocated (long, medium term): explicit auctions (SETSO TF dry run project) - -Transparent price signal and short term efficient allocation (spot markets providing implicit auctions: Borzen, OPCOM proposals). Spot market: Only a piece in a puzzle. But to fix the margins is essential.

71 DAM participants, signatories of the Agreement, registered at OPCOM in February 28th, 2006, with average daily participation of more than 30 of them. The DAM market first period (1 July 2005– 28 February 2006) results: 6.55% market share (av.394 MWh/h) Average price: Euro/MWh The Romanian Power Market, since July 1th, 2005: 16.5 % Regulated 83.5 % Competitive Current OPCOM voluntary markets: zonal based spot trading system, financial market system being implemented, settlement services, organization in place. - Supported by national stakeholders. - Encouraged by existing and potential market participants. - Sponsored by regional donors. - Advised by experienced international consultants. - Best suppliers IT trading platforms based. Who are we? How is the country? / Oil Regional targets:

Basis - -World Bank Athens process’ approach: phased development - - Nord Pool historical evolution as extending trading area from pair of countries to all Scandinavian area - - ECSEE real framework: different stages of liberalization, PXs & TSOs ongoing projects as implicit and explicit capacity auction development - - Congestion management mechanisms as joint ETSO – EuroPEX development and documents issued by EuroPEX dedicated SEE - - European mini fora conclusions - - European PX’s experience in making steps towards IEM - - Firm liquidity brought by large Romanian electricity market and important DAM share succeeded in present Regional targets: Where are we intending to go?

Main Issues Phased development from national PX to cluster (sub-regional), passing from neighboring countries approach stage. Market splitting in cluster as reliable congestion management method. Similar evolution of Borzen will support envisaged sub- regions market coupling. Borzen and OPCOM can equally but specifically focus on SEE market connection with the SEE neighboring countries’ markets (Austria, Italy and Greece, Hungary, Moldova, Turkey or Ukraine). An open ownership structure intending to bring trust, neutrality and transparency. The incipient national market operators inside TSO’s can play a further role within internal structure of a regional spot power exchange commonly owned, based on a decentralized organization. Regional stakeholders can participate in spot market design performance based on trading simulator. Started as bilateral market, the emerging SEE regional market will initially introduce the explicit auctions as bilateral trading support. The phased approach will enable a soft landing of implicit auctions, based on agreement with TSOs to share the cross-border capacity between explicit and implicit auctions increasing in time the implicit auctions dedicated one. Regional targets: Where are we intending to go?

1. 1.The Romanian stakeholders involved in Athens Forum process (MEC, ANRE, Transelectrica, OPCOM) have to proceed towards ECSEE Treaty provisions implementation Needed changes in primary and secondary legislation shall be analyzed in order to allow the regional regulatory framework harmonization Once completed by OPCOM under the international consultancy and agreed by stakeholders, the Romanian strategy to support the regional spot market development by involving national power exchange will become the road map of activities to be initiated, fulfilled and … finalized The stakeholders representatives will coherently sustain the OPCOM initiative related development and promotion actions The process of financing, contracting and implementing for the specific project dedicated regional power exchange implementation will be correlated with predictable events and ECSEE treaty milestones Needed decisions will be taken in order to settle the regional power exchange ownership structure aimed to ensure the ECSEE treaty signatory countries’ trust. OPCOM initiative: The Project. Regional targets: Luna SimulatorTOR, contractingSimulator development and implementation Simulation period2006 Regional trading platformRegional trading platform development and implementation SimulatorTechnical specification to update the trade system according regional inputs Changes’ implementation Regional trade promotion by simulator using 2007 Regional trading platformRegional trade market trial.

There is enough room for two cooperating PXs in the region. Successful, established spot marketplaces as Borzen and OPCOM: the most powerful driving force for markets development in SEE region, to provide transparently reference price for wholesale trade in the region. Lack of evident benefits (discovery of trade opportunities and electricity prices) will not be replaced by political decisions. Lack of political decision in ensuring the liberalization and market rules harmonization will jeopardize the process’ pace. Lack of cooperation and agreements of the power exchanges with the TSOs and between each country TSO and the Regulatory Authority will transform the projects into a “simple computer game”. OPCOM initiative: Conclusions Regional targets:

Thank You for Your Attention ! OPCOM