DTC AOP 2010 - GSI October 1, 2009. FY09 Funding Resource/Tasks AFWA (February 2009 - January 2010): – 3.3.1 GSI code management and support (1.1FTE)

Slides:



Advertisements
Similar presentations
Professional Development for School Leaders Technical Assistance Phase 3 Implementation and Documentation.
Advertisements

Code Management, testing and support Xiang-Yu (Hans) Huang 1 Hui Shao 1, Ming Hu 2, Don Stark 1 Kathryn Newman 1, Chunhua Zhou Community GSI Workshop,
Products being integrated to create Home Base OpenClass Collaboration Schoolnet Instructional Tools and Assessment PowerSchool Student Information Core.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair March 25, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WRF Modeling System V2.0 Overview
Adaptation of the Gridpoint Statistical Interpolation (GSI) for hourly cycled application within the Rapid Refresh Ming Hu 1,2, Stan Benjamin 1, Steve.
Hui Shao Developmental Testbed Center GSI: Code Management and Transitions between Research and Operations 2011 Summer Community GSI Tutorial, June 29-July.
Data Assimilation Cycling with GSI and AIRS Sixth Meeting of the Science Advisory Committee 28 February – 1 March, 2012 National Space Science and Technology.
Who does what and when? Mary Rowlatt MDR Partners.
CS 501 : An Introduction to SCM & GForge An Introduction to SCM & GForge Lin Guo
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Mission-Based Management March 2007 Electronic CV System Users Group.
Using virtual learning environments to support learners in virtual worlds Kerri McCusker, Michael Callaghan, Daniel Livingstone, Anna Peachey, Peter Bloomfield,
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
EMC’s Offsite Computing Update HPC RAC 05 January 2012.
Jordan G. Powers Mesoscale and Microscale Meteorology Division NCAR Earth System Laboratory National Center for Atmospheric Research Space Weather Workshop.
Esri UC2013. Technical Workshop. Technical Workshop 2013 Esri International User Conference July 8–12, 2013 | San Diego, California ArcGIS for Local Government.
The Collaborative Imaging Grid (CIG) Edward Marsh, Kurtis Heimerl, Andrew Urhausen, Paul Javid, Aneesa Awaludin, Austin Cargol.
Donald Stark National Center for Atmospheric Research (NCAR) The Developmental Testbed Center (DTC) Wednesday 29 June, 2011 GSI Fundamentals (1): Setup.
Bill Kuo DTC: Overview and AOP Outlines The DTC Management Structure The expected outcome of the DTC Management Board (MB) meeting DTC 2009 budget.
Donald Stark National Center for Atmospheric Research (NCAR) The Developmental Testbed Center (DTC) Thursday 13 August, 2015 Downloading and Building EnKF.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Bill Kuo Developmental Testbed Center: Overview, Status and Future Direction.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Future support of EGI services Tiziana Ferrari/EGI.eu Future support of EGI.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
I.Boulder Community GSI Code Repository II.GSI Regression Test Suite III.GSI Code Release IV.GSI Community Support V.Collaborative Efforts.
3SAQS Technical Committee Workshop Overview of updated schedule / deliverables related to ongoing 3SAQS technical work October 31, 2013 Tom Moore.
Ed Tollerud, Tara Jensen, Barb Brown ( also Yuejian Zhu, Zoltan Toth, Tony Eckel, Curtis Alexander, Huiling Yuan,…) Module 6 Objective: Provide a portable,
Bill Kuo DTC Management Board Meeting 17 th March 2011.
Proposed 2014 RTF Work Plan and 3-year Look Back October 21,
1 The WRF Developmental Testbed Center (DTC) Bob Gall A facility where the NWP research and operational communities interact to accelerate testing and.
Barbara Brown 1, Ed Tollerud 2, and Tara Jensen 1 1 NCAR/RAL, Boulder, CO and DTC 2 NOAA/GSD, Boulder, CO and DTC DET: Testing and Evaluation Plan Wally.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Software Quality Assurance
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
DTC HWRF Task AOP2009 & AOP /01/2009 Ligia Bernardet.
Ming Hu Developmental Testbed Center Introduction to Practice Session 2011 GSI Community Tutorial June 29-July 1, 2011, Boulder, CO.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
© GEO Secretariat Overall Concept What? B08FDP Forecast Demonstration Project (Nowcasting) B08RDP Research & Development Project (Ensemble Prediction Systems)
Summary of EMC-DTC Meeting June 18, DTC AOP 2010 Tasks to be continued from 2009: – WRF-NMM + WPP community support (Jamie Wolff) – Reference configurations.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
Community Codes Free and shared resource Ongoing distributed development by both research and operational communities – Maintained under version control.
1 Program Release 2008 Update to the Administrative Council August 9, 2007.
Task 2.1: Software Specifications Markus Kissler-Patig.
Toward GSI Community Code Louisa Nance, Ming Hu, Hui Shao, Laurie Carson, Hans Huang.
Evaluation Assistant Research Projects EAs are required to lead an evaluation research project for the academic year.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
DET Module 1 Ensemble Configuration Linda Wharton 1, Paula McCaslin 1, Tara Jensen 2 1 NOAA/GSD, Boulder, CO 2 NCAR/RAL, Boulder, CO 3/8/2016.
UNSD – DFID project: Country Directors’ Meeting 15 – 17 October 2014 Improving the collation, availability and dissemination of development indicators.
Presented by Mary Barton SATIF CFN 204 Principals’ Conference September 16, 2011.
Communication, monitoring and recruitment targets.
Bill Kuo 1, Steve Koch 2, Barb Brown 1, Louisa Nance 1 Developmental Testbed Center 1. National Center for Atmospheric Research 2. Earth System Research.
Developmental Testbed Center: Overview
Developmental Testbed Center: Governance highlights
CEOS Response to GEOSS Water Strategy
NDMC NASA –JPL Project Activities Update: Objectives and Deliverables
GMAO Seasonal Forecast
The Use of AMET and Automated Scripts for Model Evaluation
Impact of Traditional and Non-traditional Observation Sources using the Grid-point Statistical Interpolation Data Assimilation System for Regional Applications.
Presentation transcript:

DTC AOP GSI October 1, 2009

FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE) Deliverable: » Code management plan » Community (and AFWA) support » Maryland collaboration (in-house DTC staff) – Testing and evaluation of GSI DA system in AFWA regional applications (1.4FTE) Deliverable: Baseline testing » NODA vs WRF-ARW plus GSI » Cycling schemes: full vs limited cycling NOAA (October September 2009): – General GSI community support (0.5FTE) Deliverable: GSI release in September 2009

Task Team Members (October 2008 – September 2009) / /0.01

FY09 Accomplishments Collaborations and coordination with NCEP/EMC, NOAA/GSD, AFWA and NCAR. Built Boulder Community Repository – Community access – Subversion code management – Carry latest EMC GSI code capability plus community contributed features – Increased GSI portability – Compilation/configuration tools – Integrated Regression Test Suite GSI community support and management – Boulder Community Code Management Plan (under review) – Gave GSI instructional session (June 2009 WRF Workshop) and lecture (July 2009 WRFDA Tutorial) – GSI helpdesk: – GSI website: – Users’ Guide (v1.0) – GSI 2010 Tutorial planning (ongoing) GSI community release – GSI Beta release (June 2009) – GSI community code release v1.0 (Sep 2009) AFWA GSI Testbed – Set up an end-to-end WRF-ARW and GSI suite – Baseline monthly runs (ongoing)

Code Release Release Branch Release is done on this tag Code release Release Branch Boulder GSI Code Repository July Sep AugDec NovFeb Mar Commits from EMC EMC operational implementation (global) Apr EMC Trunk Boulder trunk branch Commits from Boulder developers branch r12: Merged global operational version Q1FY09 r14: Beta release r18: Merged with the current EMC GSI trunk r… : Weekly sync with EMC GSI repository

GSI v1.0 was released on September 25, 2009: GSI code (based on NOAA/NCEP Q1FY09) Compilation/configuration tool GSI required libraries Updated GSI User’s Guide Tested on IBM Supercomputer, Linux workstation, Linux Clusters Community Release

FY10 Plan Continue collaborations and coordination with NCEP/EMC, NOAA/GSD, AFWA and NCAR. – Maryland staff – EMC visit Boulder Maintain Boulder Community Repository – Update, port and enhance Regression Test Suite – Improve the portability of the code – Carry out weekly regression tests – Sync with EMC GSI repository (EMC->Boulder) – Plan for Boulder->EMC syncing – Develop community tools: PrepBUFR converter GSI community support and management – GSI Community code release v2.0: April, 2010 (Tentative) – GSI Tutorial in June 28 – 30, 2010 in Boulder, CO – Form a Boulder GSI committee, which provides guidance to the GSI support, testing and evaluation – Maintain and update the Boulder Community GSI Code Management Plan – Setup administrative (?) structure for GSI management – Coordinate T&E activities – Update GSI User’s Guide v2.0 – Provide support to the community including GSI-help, GSI webpage, online documentation and online tutorial – Present Boulder GSI work at national and international conferences

FY10 Plan GSI T & E DTC will  Set up the FY2010 AFWA GSI Testbed, based on the recommendation from the DTC FY2009 GSI T&E report;  Carry out a baseline experiment without GSI (NODA run) using the latest WPS and ARW, available in Spring 2010, as a reference for evaluating GSI experiments;  Test and evaluate the latest GSI, available in Spring 2010, using the testbed;  Conduct impact studies to assess impact from certain data types;  Check and test QC procedures;  Deliver a report to AFWA summarizing the test results and recommendations.  Further develop the end-to-end scripts;  Develop utilities to read and display outputs from GSI, WRF and MET

FY10 Plan Milestones (Deliverable): – GSI Community code release v2.0: April, 2010 (Tentative) – GSI Tutorial in June 28 – 30, 2010 in Boulder, CO – Updated GSI User’s Guide – GSI committees – T&E activities report

FY10 Plan Budget (AFWA+NOAA) Salary: Huang0.1 FTE AFWA FTE NOAA Shao 1.0 FTE AFWA Crosby 1.0 FTE AFWA Park 0.4 FTE AFWA Hu0.50 FTE NOAA Stark0.50 FTE NOAA Carson?? Total2.5 FTE AFWA1.15+?? FTE NOAA Travels: – 4 x DC-Denver – 2 x Omaha – 2 x AMS conference

FY10 Plan Extra tasks ( FTE) Development community tools (samples) to read GSI and display outputs (e.g., GSI’s binary outputs). DTC GSI Testbed – Expand the AFWA GSI Testbed:  Compute a new (ARW) BE from NODA, carry out singe ob experiments and perform initial BE tuning, in collaboration with MMM colleagues;  Test and evaluate the ARW BE (and its tuning) using the testbed, in collaboration with MMM colleagues;  Develop utilities to read and display outputs from GSI, WRF and MET;  provide documentation of the utilities to AFWA.  Set up a GSD GSI Testbed:  test GSI capability/configuration for RR also using WRF-ARW  initial capability – impact for cloud analysis using GOES and METAR observations  extendable to observation impact for other platforms by DTC community