Raport o stanie projektu FAIR – przedstawiony w oparciu o folie prof.W. Henninga, dyrektora GSI, oraz H. Wenningera kierującego pracami STI i H.-F Wagnera.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
University of Surrey Nuclear Physics Research Group Nuclear theory group (2 Professors (Al-Khalili & Tostevin) ; 2 Senior Lecturers (Stevenson & Barbieri),
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project TRD workshop, Romania, September 24-28, 2005.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
HISPEC/DESPEC meeting GSI, 21/02/ Introduction: what happened recently (B.Rubio) 2. Beam quality: energy buncher (C.Brandau) 3. Layout.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Research Areas at FAIR Structure and Dynamics of Nuclei - Radioactive Beams Nucleonic matter Nuclear astrophysics Fundamental symmetries Hadron Structure.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
Heavy Ion Accelerator for RIB KoRIA in International Science & Business Belt S. W. Hong Sungkyunkwan University S. W. Hong Sungkyunkwan University Nov.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
th session of JINR SC 1 JOINT INSTITUTE FOR NUCLEAR RESEARCH Recommendations of the JINR Directorate for the financing of projects and themes.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
FAIR International Facility for Antiproton and Ion Research Key features and organization Plans for realization Experiments and LOIs Technical challenges.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke,
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Monday, Nov. 8, 2010PHYS 3446, Fall 2010 Andrew Brandt 1 PHYS 3446 – Lecture #17 Monday, Nov. 8, 2010 Dr. Andrew Brandt Particle Detection Calorimeter.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
International Conference on Science and Technology for FAIR in Europe 2014 APPA Cave Instrumentation for Plasma Physics Vincent Bagnoud, GSI and Helmholtz.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
for the EURISOL Steering Committee
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
FAIR – the Universe in the labororatory
Presentation transcript:

Raport o stanie projektu FAIR – przedstawiony w oparciu o folie prof.W. Henninga, dyrektora GSI, oraz H. Wenningera kierującego pracami STI i H.-F Wagnera kierującego pracami AFI Reinhard Kulessa – UJ Warszawa 11 stycznia 2006 r.

The International Committee Structure for FAIR PAC QCD E.Chiavassa PAC NUSTAR R.Casten PAC APPA D.Schwalm TAC Yanglai Cho Observers: FAIR Project Cost Review Groups Core-E D.Plane Core-A W. Bartels Full Cost Structure Group B. Brandt AFI Working Group Administrative and Funding Issues H.F.Wagner Legal Working Group U.B. Jahn STI Working Group Scientific + Technical Issues Horst Wenninger ISC International. Steering Committee H.Schunck

FAIR Technical & Scientific Status – November 2005 Initial scientific programme defined (based on CDR, LoI's (June 04), and Technical Proposals submitted January 2005 and evaluated by PAC's / TAC and STI): ~70 international workshops (post CDR) 2100 international scientists as authors of the proposals ~ 8,4 M€ (national) & ~ 12,6 M€ (internationa l) effort 2005 ~ 80 FTE (national) und ~ 120 FTE (international) STI & PAC/TAC reviews performed (60 international members) STI Recommendations completed  see presentation by STI Chair H. Wenninger Accelerator development underway (R&D and proto-typing)– Draft Technical Reports / Draft Cost Book available & under evaluation (TAC/miniTAC's und STI); project definition and T(D)R by mid-March 2006); cost reviews by CORE-E & A and mini-TAC's 3(6) consortia (& bilateral MoUs) for R&D and construction of the accelerators ~ 18,9 M€ (national) and ~ 0,8 M€ (international) effort 2005 ~ 100 FTE (national) und ~ 20 FTE (international)  see presentation by STI Chair H. Wenninger Comprehensive civil construction and building pre-planing performed (Eng.-Co. BUNG) 'Offenlegung & Bürgerversammlung' of Civil Construction Plan (Nov.3, 2005) Final version T(D)R underway, based on new layout (and staging) Regulatory and legal processes initiated, environmental impact study completed: 20 regulatory procedures (of these 9 concluded in the meantime) 8 environmental impact studies (UVS) radiation safety study completed and preliminary approval received Development of organisational, cost and management structure  see presentation by AFI CHAIR H-F. Wagner T(D)R in March 2006, with cost, schedule and overall project definition

24 November 2005FAIR STI - ISC Berlin4 FAIR Scientific and Technical Issues working group Mandate Accompany preparations of FAIR Technical Design Reports Evaluate the advancement of prototyping of critical components Present the three phases of FAIR project realisation scientific goals and costs of each realisation step Explore cost of construction and operation of the facility Cost-book: material / personnel /risk budget… Resource loaded schedule with milestone/critical path/… AFI complements for legal - financial issues, procedures, contracts,..

PAC on Nuclear Structure and Nuclear Astrophysics (NUSTAR-PAC): 667 users 1.) Low Energy Branch (LEB) High-resolution In-Flight Spectroscopy (HISPEC)/ Zs.Podolyak/ Surrey Decay Spectroscopy with Implanted Ion Beams (DESPEC)+ B. Rubio Valencia Precision Measurements of very short-lived Nuclei using an Advanced Trapping System for highly-charged Ions (MATS)K.Blaum Mainz LASER Spectroscopy for the Study of Nuclear Properties (LASPEC)P. Campbell Manchester Neutron Capture Measurements (NCAP)M.Heil FZK Antiprotonic Radioactive Nuclides (Exo+pbar)M. Wada Riken 2.) High Energy Branch (R3B) A Universal Setup for Kinematical Complete Measurements of Reactions with Relativistic Radioactive Beams (R3B)T. Aumann GSI 3.) Ring Branch (STORIB) Study of Isomeric Beams, Lifetimes and Masses (ILIMA)Y.Novikov SPNPI Exotic Nuclei Studied in Light-Ion Induced Reactions at the NESR Storage Ring (EXL)M. Chartier Liverpool Electron-Ion Scattering in a Storage Ring (e-A Collider) (ELISe)H. Simon GSI Antiproton-Ion Collider: A Tool for the Measurement of Neutron and Proton rms radii of Stable and Radioactive Nuclei (AIC)R. Krücken TUM Technical Proposals

PAC on Quantum Chromo Dynamics (QCD-PAC): 909 users ASSIA Study of Spin-dependent Interactions with AntiprotonsR.Bertini Torino (90) CBM Compressed Baryonic Matter ExperimentP.SengerGSI (294) PANDA Strong Interaction Studies with AntiprotonsU.WiednerTSL Uppsala (348) PAX Antiproton-Proton Scattering Experiments with PolarizationF.RathmannFZJ (177) PAC on Atomic Physics, Plasma Physics and Applications (APPA-PAC) 578 users Laser Cooling of Highly Charged Ions at SIS 100/300U. SchrammLMU FLAIR - A Facility for Low-energy Antiproton and Ion ResearchE. Wiedman Tokyo SPARC Stored Particles in Atomic physics ResearchR. SchuchStockholm HEDGEHOB: High Energy Density matter Generated by Heavy-iOn Beams( LAPLAS, HIHEX)D. Varentsov Darmstadt BIOMAT Applications of Relativistic Ions in Radiobiology M. Durante Napoli and Space Research/ Materials Research with Relativistic Heavy Ion Beams S. KlaumünzerHMI WDM Radiative Properties of Warm Dense MatterF. B. RosmejMarseille Technical Proposals

FAIR layout summer 2005

FAIR – Facility for Antiproton and Ion Research: New Layout 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR GSI today Future Facility ESR

SIS100/300 Underground Tunnel 5 m -24 m Tunnel in Open-Pit Construction Tunnel Drilling Machine

Contract(s) Development Contract(s) Negotiations Closing PAC's Technical Committees: PAC's & TAC Signing of MoU Phase I – Governed by MoU Phase II Governed by Contracts The ISC-FAIR International Working Groups MoU Proposals / TR's LoI's (2100 authors) T(D)R (March 06) Evaluation by Advisory Committees (March 05) Cost Review by CORE group (Fall 05) Project Definition in 2005

Path of Evaluation ( both Investment and Operation cost ) Experiments: LoI PAC i TP PAC i TDRs CORE E Accelerator + Infrastructure Projects:

Core Groupe “E” for Experiments CORE ‘E’ Members: Wulfrin Bartel, chair (ex DESY) large experiments H.G. Ritter LBLdetector systems, electronics J.Simpson CCLRCgamma ray Detection A.Vacchi INFN Triestesilicon detectors I.Lazarus CCLRCdetectors, exp.systems H.J.Hilke ex-CERNexperiments, detectors P.Lazeyras ex-CERNgeneral detector systems First Meeting scheduled May 30/31, job to be finished by September 15, 2005

E-CORE Evaluation

EXAMPLE E-CORE evaluation of PANDA

PANDA Cost according to E-CORE

E- CORE cost table for all reviewed major FAIR experiments Experiment Cost [k€]UncertaintyRemarks MATS % Low risk LASPEC % Low risk SPARC Low risk Laser %Manpower NESR %Manpower R3B Manpower!! Phase I %R & D Phase II %R & D PANDA %Add 8818 k€ (risk) low prices, R&D Manpower? CBM %55950k€ down grade Manpower!!, R&D ILIMA %Manpower HISPEC/ DESPEC %Manpower

Three stages according to fields of science: Three stages according to fields of science: Stage 1: Radioactive beam physics Nuclear structure and nuclear astrophysics Atomic physics studies with highly charged/radioactive ions & plasma physics Stage 2: Proton-antiproton physics QCD studies with protons and antiprotons Precision studies with antiproton beams addressing fundamental symmetries and interactions Stage 3 Full facility capability & all research programs Full parallel operation of up to four research programs Full energy and luminosity for nuclear collisions program at CBM Precision QCD Studies at PANDA up to 15 GeV/c Plasma research (full gain factor in power density: ~400) Atomic reaction studies with fast beams

Next Steps: from today until March Follow up on the ideas on lowering the cost for the machine facilities -Get Draft of Technical Report by end of the year -Get FAIR Cost Book validated by AFI - Open new FAIR Project Division at GSI ( FAIR Technical Director ) - Form further FAIR-Consortia with countries and laboratories now: - On the way: HESR Sweden+FZJ+GSI, - NESR Spain+GSI, - CR China+GSI, - LEB KVI+GSI - In preparation: France+GSI, Italy+GSI, UK+GSI, Russia+GSI, CERN+GSI, India+GSI, Publish final FAIR Technical+Administrative Report for Spring 2006

Strengthening the FAIR work force Personnel: Total GSI working for FAIR FTE 72 New recruits 2005 for FAIR FTE 43

Administrative Issues Legal Structure Basic legal structure of a future FAIR Limited Liability Company: –Convention –Articles of Association –By Laws Organs: Shareholder’s Assembly, Supervisory Board, Managing Directors

Administrative Issues: Convention Convention was discussed in detail three times Open at this moment: –Germany has to clarify how VAT for external contributions will be handled. F definitely will not pay VAT. –Handling of decommissioning. –Details of In-kind contributions: Paper by GSI very narrow to XFEL-paper. –Transfer of shares: seeking for joint position of D, F, I. Reaction of F, I is missing so far. –Transition from present GSI to FAIR: Paper with details of GSI for next meeting. Things will be cleared at next meeting January 16 Convention will then be ready on the level of AFI to be submitted to ISC in spring

Administrative Issues: AoA Articles of Association discussed once in full length. Not ready for submission to ISC Points of interest for ISC: –Voting rights Shares for construction and operation different. Calculation of mix? Voting separated according to special topics? Amount of majorities for voting on specific subjects –Final catalogue of responsibilities for shareholders assembly and supervisory board

Administrative Issues: By-laws –By-laws were not discussed yet –They will regulate the day by day business of the company –Will be tackled not before spring

Bonn, The International Facility for Antiproton and Ion Research (FAIR) - Key points of the German position - Germany strongly affirms its commitment to FAIR as an international research facility in Darmstadt with a great long-term scientific impact, in particular for Europe. FAIR will provide the European and international science community with a worldwide unique and innovative accelerator system to perform forefront research in different areas especially concerned with the basic structure of matter. The establishment of the international Facility for Antiproton and Ion Research represents an important element of the European Research Area. Germany greatly appreciates the high interest and engagement of the international partners in the preparation of FAIR. Due to this, significant progress in the scientific, technical and administrative preparation of the project following the signing of the Memorandum of Understanding on the preparatory phase in 2004/05 has been reached. For Germany some key points are essential in the further negotiations with its partners. 1) We should maintain the already reached momentum to start the construction of FAIR swiftly to ensure the completion of the facility in ) This requires the creation of an efficient scientific, technical and organisational unit, which will be supported by Germany and its international partners in fair partnership. 3) Departing from the position Germany has put forward in the past, we are now seeking to establish an independent FAIR Company for constructing and operating the facility alongside the GSI for legal and general science policy reasons. This will not affect the rights and obligations of the international partners as discussed in AFI and ISC. We are just in discussion with our Finance Ministry on that matter.