H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December.2003 1 GSI UHV System Upgrade The GSIThe GSI Future Accelerator Facility for Beams.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

FAIR Synchrotrons SIS100/300
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
H. Reich-Sprenger, GSI Vacuum group, EU construction Kick-Off meeting, dec 1st – 2nd GSI Vacuum group GSI Vacuum group: 5 physicists (Bellachioma,
Holger Kollmus - VBE-UHV 1 SIS100_1 ERDA Measurements ERDA – Measurements: Understanding of Ion Beam-Loss Induced Desorption.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
20-21 January 2009, RAL Joint DL-RAL Accelerator Workshop 1 INVESTIGATION OF NON- EVAPORABLE GETTER FILMS O. B. Malyshev, K.J. Middleman, A. Hannah and.
YONG WANG, BO ZHAN, GJIE WANG National Synchrotron Radiation Laboratory University of Science and Technology of China Key vacuum technologies.
Lecture on Targets A. Introduction scattering exp., gas target, storage ring B. Basics on Vacuum, Gas Flow etc pumps, molecular flow & tubes, T-shaped.
Peter Spiller, Heavy Ion Fusion Symposium Princeton June 7-11, 2004 Accelerator Plans at GSI for Plasma Physics Applications.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
I. Strasik et al. ● Halo Collimation of Proton and Ion Beams in FAIR Synchrotron SIS 100 ● CERN Halo Collimation of Proton and Ion Beams in.
Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Status of the FAIR pbar Source K. Knie May 3, 2011.
ICFA Workshop, December 9-12, 2003 Andreas Krämer - GSI Darmstadt1 Ion Beam Induced Desorption Yield Measurements at GSI The 13th ICFA Beam Dynamics Mini-Workshop.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Oliver Boine-Frankenheim, High-Current Beam Physics Accelerator Facility for Energetic Ion Beams of High Intensity and Quality Inter’l Accelerator Project.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
F. Le Pimpec 1 How DID they make light bulb work ? Bulb Installed in 1901 at the Livermore’s (CA) Fire station. C filament - 4 W ♦ Since 1800 the electric.
Plans for in-situ coating with a robotic mole at BNL Ady Hershcovitch 1, Michael Blaskiewicz 1, Wolfram Fischer 1, H. Joseph Poole 2, Mark Erickson 2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.
GSI vacuum group Who we are:
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
A. Kraemer, OLAVIII, July 11th, Gas Loads into SIS100 Cryogenic Vacuum Sections A. Kraemer, Calculations and Transparencies courtesy of St. Wilfert.
THIN FILM GETTER COATING FOR THE SIS 18 UPGRADE M.C.Bellachioma GSI- Vacuum Group Beschleunigerpalaver 14 September 2006.
Halo Collimation of Protons and Heavy Ions in SIS-100.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
INVESTIGATION OF NON-EVAPORABLE GETTER FILMS
Status of HESR 18th March Gießen Dieter Prasuhn.
Induced-activity experiment:
Collimation Concept for Beam Halo Losses in SIS 100
Emergency dumping of proton and ion beams in SIS100 F
Challenges of vacuum chambers with adjustable gap for SC undulators
G.Bregliozzi - VSC-LBV Section Collimation working group 08/07/02013
Electron cloud & vacuum pressure observations: 2011 proton run
Accelerator System - Vacuum
CEPC Vacuum System Dong Haiyi 2017/11/5.
Vacuum and electron cloud issues at the GSI present and future facilities Giovanni Rumolo, O. Boine-Frankenheim, I. Hofmann, E. Mustafin Overview on the.
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Presentation transcript:

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December GSI UHV System Upgrade The GSIThe GSI Future Accelerator Facility for Beams of Ions and Antiprotons SIS18 UHV Status SIS18 UHV Upgrade Ion Induced Desorption SIS100 / SIS300 : Cryogenic UHV see also: O. Boine-Frankenheim: "The international Accelerator Project at GSI" A. Krämer: "Ion Induced Desorption Yield Measurements at GSI" E. Mustafin: "Theory of Dynamic Vacuum Instability Induced by Lost Heavy Ions in Accelerator Rings"

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December The GSI The GSI Future Accelerator Facility for Beams of Ions and Antiprotons Acceleration I IIIII Experiments 100m n From protons to uranium n In future also antiprotons n 1 MeV/u to 2 GeV/u n In future up to 30 GeV/u n 10 9 to particles/cycle n In future particles/cycle n 0.1 Hz to 1 Hz Repetition rate n In future up to 3 Hz  Multi-user operation: pulse to pulse 3ion species, full energy range n Nuclear and Hadron Physics n Nuclear Chemistry n Atomic Physics n Material Science n Plasma Physics n Biophysics see: O. Boine-Frankenheim: "The international Accelerator Project at GSI"

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December The GSI The GSI Future Accelerator Facility for Beams of Ions and Antiprotons

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December GSI International Accelerator Facility UHV system requirements Due to ion beam lifetime requirements (e.g.: U 28+ in SIS18): SIS18: warm p≈5· mbar ESR: warm p≈5· mbar SIS100: cold arcs T=7-20K warm straight sections T=300K p≈5· mbar SIS300: cold arcs T=4.2K warm straight sections T=300K p≈5· mbar NESR: p≈5· mbar HESR: p≤ mbar RESR: p≤ mbar CR: p≤ mbar HEBL: length 2.5 km, 70% cold *all pressures: N 2 equivalent SIS100/300 HESR NESR CR RESR from SIS18

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December The heavy ion synchrotron SIS present status n 12 sectors each: n 18 m long n  200 mm n 4 TSP n 3 Ion pumps (triode type) n 1-2 extractor gauge n 7 vacuum sectors n One pumping station with turbo molecular pump (rough pumping + bake- out) n 1 RGA

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December SIS18 residual gas composition (10/2003) RGA spectra examples Ar CxHy S03 total pressure: 3* mbarS08 total pressure: 6.8* mbar  existing "micro-leaks"and contaminations

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Static conditions: SIS18 UHV Status, october 2003 (no ion beam operation) injection extraction Contamination of Ar, Hydrocarbons

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Dynamic Vacuum and Beam Lifetime Desorption processes degenerate the residual gas pressure ( U 28+ case ) Initiated by :  Systematic beam losses on acceptance limiting devices (septa) ( 8MeV/u < E <100MeV/u )  Stripped beam ions ( 8MeV/u < E <100MeV/u )  Ionized and accelerated residual gas ( E < keV) : minor effect  losses increase with number of injected ions ( shorter beam life time due to stronger pressure bumps )  Even at “zero current” ion beam lifetime is to short P. Spiller, December MeV/u U 28+

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December U 28+ ion beam operation: total ion beam loss inside first dipole S01  local pressure rises do not strongly influence neighbouring UHV sections  Easy measurement at other maschines could help to get high energy data for desorption processes

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December U 73+ ion beam operation

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December U 28+ / U 73+ operation, RGA diagnostic S01 [CO] U28+, detecated ion beam loss in S01MU1 U73+ maschine exp., H.Damerau, failure of dipoles at no ion beam, service ion source U73+, H. Damerau, machine experiments no ion-beam in SIS (4:00 to 8:00pm) U73+, U.Blell, machine experiments. Maschinenexperimente Ion: U73+, U28+ Energien : 11,17 MeV/u (73+) ; 8,7MeV/u (28+) Messort: Prisma RGA in S01VK4 Messzeit: :00 bis :00Uhr Bemerkungen: in der Zeitskala bis ca sec wurde U28+ mit 8,7MeV/u gezielt in S01MU1 verloren: Puls 48muA, 200mus, Zykluszeit:ca. 1,8s in der Zeitskala von bis fanden Maschinenexperiment e (Damerau,Blell) mit U73+ statt nachfolgend sind die aufgenommen Langzeitspektren dargestellt nur für die Masse 28 (CO, N2) ist ein signifikanter Anstieg des Partialdrucks korreliert mit dem Strahlbetrieb zu beobachten

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December U 28+ ion beam operation of SIS18 (up to injected ions)

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Lifetime of U 28+ ions in SIS18 at low ion beam intensities (~ 10 8 ions per cycle) R. Olson et al., GSI Annual Report 2002, 97 (2003)

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Vacuum Requirements for SIS18 Beam lifetime has to be significantly larger than cycling time of the SIS18 (Lifetime of at least 10 seconds for all kinds of operation) Total pressure in low 1∙ mbar with a small fraction of high Z gases even for highest beam intensities optimized dynamic conditions: efficient ion beam loss control, low desorption at localized ion beam losses, maximized local pumping speed at locations of ion beam loss, No beam scrubbing possible due to multi-user operation of SIS18 optimized static conditions: minimized outgassing rate through material and production control, cleaning, bakeout, removal of contaminations and "micro- leaks" efficient and distributed pumping.

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Optimized Static Conditions: Detection and removal of micro-leaks (  Ar !) Exchange of contaminated insertions (  CxHy) Replacement of all 24 dipole chambers (  bakeout to 300°C, coating?) [existing new spare chambers] Replacement of all 12 quadrupole chambers (  bakeout to 300°C, coating?) [prototype and new chambers to be designed and built] Ion Pumps: optimized IP regeneration, if necessary: replacement by noble diodes, optimized sublimation cycles (  improved pumping speed)

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Optimized Dynamic Conditions:  collimators at locations of known ion beam loss: injection section / septum extraction / septum  with integrated high pumping speed: - cryopump  low desorption materials: - experiments at test bench with ion beam  distributed pumping speed: - NEG ? May/June 2003 since April 2003 beginning of 2004 final decision depends on desorption experiment results

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Cryogenic Systems: Nuclotron Dipole for SIS100 elliptical, 130x65mm indirectly cooled with pipes and LHe, T=7-20K  p=1bar => 0.8mm stainless steel wall dB/dt=4T/s => 0.5mm stainless steel wall (eddy current) Alternative: conventional warm magnets with warm beam pipe In the straight sections of SIS100 (6x60m) the vacuum chambers are at room temperature.

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Cryogenic systems: RHIC Dipole for SIS300 round, diameter=100mm directly cooled in LHe-bath, T=4.2K for quench protection  p=30bar dB/dt=1T/s

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Requirements for warm (T=300K) vacuum beam pipes in SIS100/300 UHV compatible (outgassing rate: mbarl/(s cm 2 )) low desorption rate under ion bombardment high electric conductivity (image current guidance, impedance) non-magnetic, non-magnetizable good weldability or other UHV compatible joining techniques, good machinability moderate costs good thermal conductivity high mechanical stability at high temperature [bake for stainless steel] low thermal expansion Some (in principle) possible materials: Stainless steel, aluminum and aluminum alloys (?), copper and copper alloys (Al-Cu), titanium and titanium alloys, beryllium(???)

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Comparison cold and warm vacuum chambers Cold Vacuum ChambersWarm Vacuum Chambers Ion Induced Desorption  H 2 + ->H 2  ≈ keV no high energy ion induced desorption data available!! But no pressure increase observed in cold sections of RHIC! (?) H 2 + ->H 2  0.5keV (impact of secondary residual gas ions)  ≈ MeV/u-10 GeV/u (primary high energy ions) Pumping speed corresponds to sticking coefficient Sticking T= 5-20K H 2 : < 0.5 CO: ~ 1 CO 2 : ~ 1 CH 4 : ~ 1 NEG H 2 : CO/CO 2 : 0.5 no pumping speed for chemical inert gases (Ar, CH 4,...)

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Open Questions Warm Vacuum Sections:  Ion induced desorption yield at high energies? (experimental program under way at the test bench and at SIS18 directly) Next step: Measurements at UNILAC, ERDA analysis of targets  Electron cloud effects? Cold Vacuum Sections:  Ion induced desorption yields at 4K for different materials? (experimental program under way)  Required wall thickness and material for cold chambers in fast ramped magnets? (image current, eddy current, additional supports, heat load, impedance, field quality...) (first studies at University of Magdeburg). Next steps: construction / manufacturing / testing of vacuum chamber samples  prototyping

H. Reich-Sprenger, 13th ICFA Beam Dynamics Mini-workshop 9-12 December Possible UHV collaboration inputs NEG coating of vacuum chambers (SIS-dipole, 4-pole,... ?) experiments on low desorption yield materials design work on cryogenic vacuum chambers (SIS100,SIS300) Material/surface physics input to understand the desorption physics GSI UHV group: M. Bender, M. Bevcic, P. Gaj, P. Horn, R. Kaminski, H. Kollmus, A. Krämer, J. Kurdal, H. Reich-Sprenger, H. Rittelmeyer, G. Savino, K. Welzel