TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest 26.09.2005.

Slides:



Advertisements
Similar presentations
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Advertisements

Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
9 Jan Irradiation Tests Module 3B Many tests, see last slide for overview Irradiate small area: 2x2 cm 2, with 2 mCu 90 Sr, 2 cm distance (~200.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production NIPNE Completely finished and tested: L1C sent to GSI L2C sent to GSI L2C sent to GSI L3C Total: 36 =
1 Alhussein Abuhoza, S. Biswas, U. Frankenfeld, J. Hehner, Ch. Schmidt GSI, Darmstadt, Germany and H.R. Schmidt University of Tübingen, Germany Study of.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
This study has been performed with an apparatus consisting of two identical standard MWPCs, a clean gas system, an outgasing box, a Copper X-ray generator.
1 Results on glass timing RPC aging P. Fonte LIP/ISEC Coimbra, Portugal. 15 October 2002 GSI Darmstadt/Germany.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Status report on studying and preventing ageing in the LHCb OT S.Bachmann (on behalf of the LHCb OT group) Physikalisches Institut Heidelberg Many thanks.
31 May 2006Update ageing measurements at NIKHEF - LHCb week - Niels Tuning 1/37 Update ageing measurements at NIKHEF 31 May 2006 Niels Tuning, Gras van.
E.A. Mathez, 2009, Climate Change: The Science of Global Warming and Our Energy Future, Columbia University Press. Source: Solomon et al., 2007 Chapter.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
Physical and Chemical Properties. Properties Every piece of matter we come in contact with has unique characteristics that make that matter the way it.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
1 Nov 2007IEEE NSS (N48-3) - Ageing in the LHCb Outer Tracker - N. Tuning1/16 Ageing Phenomena in the LHCb Outer Tracker 1 November 2007 IEEE2007 Niels.
Chapter 11 Heating the Atmosphere. Weather versus Climate  Weather  Atmospheric conditions over a short period of time  Constantly changing  Climate.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
Surface hardening.
12 July 2006Update ageing measurements at NIKHEF - Ageing Workshop - Niels Tuning 1/25 Update ageing measurements at NIKHEF 12 July 2006 Niels Tuning,
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Global Warming. 30 year average as baseline over the period from 1870 to 2005 (Washington Post)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Quality-evaluation of Cesium Iodide photocathodes for the ALICE/High Momentum Particle Identification detector by means of a VUV-Scanner system Herbert.
Study of glass properties as electrod for RPC
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Intensive Physical Properties Obj: students will know the difference between intensive and extensive physical properties.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Outgassing of Outer Tracker Glue Maarten Buffing (VU) June
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
Weather.
The Electric Field Due to continuous Charges
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Long irradiation at the side
Electrical Stopping Power Electrical Resistance
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
Weather.
Presentation transcript:

TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest

Overview Joerg Hehner TRD Collaboration Meeting Bucharest Status L5C1/L4C1 - Glue System - Testing the Properties - Summary

30 Radiators Frames glued 21 Radiator Frames wired 23 Padplanes glued 2 Padplanes bad Joerg Hehner TRD Collaboration Meeting Bucharest Production Status L5C1

19 Moduls tested with Fe55 Source Closed with Tape Gas ArCO 2 70/30 HV-Anode 1620 V, HV-Drift V O 2 Concentration below 30ppm, Flush 40l/h, 8h up to know Dark Current < 1nA Joerg Hehner TRD Collaboration Meeting Bucharest Testing Status L5C1

Finally glued Chamber 2 Modul tested with Roentgen Source Gas ArCO 2 70/30 HV-Anode 1620 V, HV-Drift V O 2 Concentration below 10ppm, Flush 40l/h, 8h up to know Dark Current < 1nA Joerg Hehner TRD Collaboration Meeting Bucharest Testing Status L5C1

11 Radiators Frames glued 5 Radiator Frames wired 5 Padplanes glued Joerg Hehner TRD Collaboration Meeting Bucharest Production Status L4C1

1 Moduls tested with Fe55 Source Closed with Tape Gas ArCO 2 70/30 HV-Anode 1620 V, HV-Drift V O 2 Concentration below 30ppm, Flush 40l/h, 8h up to know Dark Current < 1nA Joerg Hehner TRD Collaboration Meeting Bucharest Testing Status L4C1

Problem with Glue System Joerg Hehner TRD Collaboration Meeting Bucharest Used Araldit AW 106/AW116 with Hardener HV953U - Sticky surface after curing time - Problem in Producing Hardener HV 953 U since 2004

Decision Joerg Hehner TRD Collaboration Meeting Bucharest Stop the TRD Production Mechanical and electrical Properties Chemical Composition was changed - Get a Charge of an modifcated Hardener to test the mech. and electr. Properties

Test mechanical Properties Joerg Hehner TRD Collaboration Meeting Bucharest cured Glue min. 24h under different climatic Conditions Shore Hardness is 60 - Observed Different Surface Quality, it depends on the Huminidity and the retention time in Air Humidity rel. 2% - 50% Temperature 23 º C – 40 º C one Sample cured in Nitrogen Atmosphere

Test Electrical Properties Joerg Hehner TRD Collaboration Meeting Bucharest under different Climatic Conditions Volume Resistivity 300 G – 8 T Ohm cm Humidity rel. 2% - 50% Temperature 23 º C – 40 º C one Sample has cured in Nitrogen Atmosphere

CONCLUSION Joerg Hehner TRD Collaboration Meeting Bucharest Orderd and distributed Hardener to finished the TRD Production - Additional Ageing Test

SUMMARY Joerg Hehner TRD Collaboration Meeting Bucharest Delay of 6 weeks in the Production Scale - 4 L5C1and 4 L4C1 finished to shipped to HD End of October - Production Mode to build 2 TRD Chambers / 7 Working Days

Joerg Hehner TRD Collaboration Meeting Bucharest Thank you Sandra Schwab, Anja B. Steffen Gert Augustinski, Andre Radu, Heinz W. Daues and all the Students