TCA LOG FILES. WHAT ARE THEY? Text files produced by TCA Programs They provide useful easy to read information They are proof of work completed by a survey.

Slides:



Advertisements
Similar presentations
(GET FAMILIAR WITH EQUIPMENT)
Advertisements

Construction Surveys
Culvert Inventory and Assessment Protocol 2015 Field Season.
Culvert Inventory and Assessment Protocol 2012 Field Season.
1 SETX30R/X10 Stakeout by Coordinate. sokkia 2 Stakeout by Coordinate During this brief presentation we will discuss the utilization of the on- board.
GEOPAK Road For Bridge Chapter 5.7 COGO Bridge Deck Elevation Commands.
Surveying Chain Surveying
Site and Highway Staking with Trimble SCS900
Types of angles A Z MLN – Horizontal angle ALM – Vertical angle
Chapter 6 Electronic Distance Measurement EDM
Chapter 13 Site Plan Layout.
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
Electronic Distance Measurement (EDM)
NIKON NPL-332 TOTAL STATION
EZNEC Tutorial – Part II NPARC Presentation David Berkley, K2MUN And Barry Cohen, K2JV October 13, 2014.
Setup “Do’s & Don’ts Presented By:
TERRESTRIAL SURVEYING
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Profile and Differential Leveling
Surveying I. Lecture 13. Tacheometry.
Word Problems for Right Triangle Trig. Angle of Elevation: The angle above the horizontal that an observer must look at to see an object that is higher.
Seiler Instrument January 7, 2013
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
Victoria Forms Enterprise Forms Server Assisted Claims.
Python File Handling. In all the programs you have made so far when program is closed all the data is lost, but what if you want to keep the data to use.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
MODERN SURVEY (FAMILARISATION WITH EQUIPMENTS). Modern equipments EDM – Electronic distance measurement eqp. EDM – Electronic distance measurement eqp.
Surveying Chain Surveying
Forging new generations of engineers. A Process for Road Layout Road Design.
For the Field Surveyor. LISCAD TCA1800 Programs Tools Available.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
ERT247/4 GEOMATICS ENGINEERING
How to build a web site in 37 easy steps. Step One – Turn your page orientation to landscape and create a table to provide a framework for your page In.
Presented by C & S Survey Solutions Tel : Setting up the Ohmex Sonarlight to the Leica 1200 GPS System.
TOPCON Network RTK Recommended Hardware Configuration for rovers.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
Version Control with SVN Images from TortoiseSVN documentation
SITECH (WA) PTY LTD Site Positioning Systems RTK GPS Sub Station Demo Guide.
TcpTunnel – Setting Out and Surveying for Tunnels TcpTunnel.
Sage 50 – What’s New (Formely Simply Accounting) Presented by:Bob Green.
ArcPad with Laser Depth Finder Capabilities Technology Review October 25, 2007 Allan Adair, James Brand, & Olivia Carey.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
Objective To use angles of elevation and depression to solve problems.
Measurement Counting yields exact numbers Measuring yields inexact values Always some error Your job is to minimize it.
B. S. Schmeing 23-September-2009 Automated measurement of local ties and antenna parameters Benno Schmeing University of Bonn, IGG Benno Schmeing University.
Introducing the FOCUS ® 4 Total Station October 2007.
1 You can create a report of points to stakeout with angle and distance from the occupied point. Points can be created for such items as end of embankment,
Dagnabbit, this is good stuff !!! SURVEYING ENGINEERING SURVEYS USDA - NRCS Construction Inspection for Field Office Activities 1.
Law of Sines Apps.. Question 1: Find the area of the triangle having the indicated angle and sides. A = 27° b= 5 c = 8.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Wrong Presentation Put In
Station Metadata: What do I Need?
Get a Crown Sapulpa FFA Tim Boeder Millie Cummins.
FCC Underground Network Simulations
Detail Surveys, Tacheometry, Total Stations
V8.3 New Features v8.3 Release Note. v8.3 New Features v8.3 Release Note.
الدكتور المهندس معن حبيب
Engineering Surveying
Angle of Elevation & Angle of Depression
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Leveling.
Leveling.
Leveling.
Revise No. 1.
Surveying I. Lecture 13. Tacheometry.
Revise No. 1.
Surveying With Construction Applications, 7th Edition
support a power pole that is 15 meters
Stream Crossing Bootcamp
Presentation transcript:

TCA LOG FILES

WHAT ARE THEY? Text files produced by TCA Programs They provide useful easy to read information They are proof of work completed by a survey crew

GEOMETRONICS Record a log file each time a program is used Log file is part of the field notes Log file is part of the documentation Log file can be proof of a staked position: –If a position is questioned by a contractor –Can potentially save money in a claim –Gives our people confidence in staked positions

PROGRAMS WITH LOG FILES

STAKEOUT LOG FILE SHORT VERSION

STAKEOUT LOG FILE LONG VERSION

SETS OF ANGLES LOG FILE

ROAD PLUS STAKEOUT LOG

ORI. HEIGHT TRANS LOG Leica VIP Orientation + Ht. Transfer V 2.22 Instrument : TCA1800, Serial , 98-TS11 User Templ. : METERS Meas. File : FILE01.GSI Program Start : 27/02/2001 at 03:02 Station : 201 E= m N= m Elev.= m hi= 1.680m Using Least-Squares Solution Station Ht. : m Ori.Corr. : 000'39" Std.Dev. Ht. : 0.000m Std.Dev. Ori. : 000'00" 1 point(s) measured : ## Point Id. Delta Hz Delta Ht Delta Sd '00" m 0.000m

TIE DISTANCE LOG Leica VIP Tie Distance V 2.22 Instrument : TCA1800, Serial , 98-TS11 User Templ. : METERS Meas. File : FILE01.GSI Program Start : 27/02/2001 at 02:59 Station : 201 E= m N= m Elev.= m hi= 1.680m Point No. 1 : 103 E= m N= m Elev.= m Hr= 1.503m Point No. 2 : 102 E= m N= m Elev.= m Hr= 1.503m Point No. 1 : 103 Point No. 2 : 102 Hori. Dist. : m Azimuth : 31005'30" ëHeight : 0.317m Slope Dist. : m

ROAD PLUS SLOPE STAKE LOG Point No. : 537 Chainage : , Offset= 0.000m HghtOffset= 0.000m Staked : E= m, N= m Elev.= m Deltas : dCL Offset= m dXS HgtDiff= m dChainage= 0.000m Point No. : 538 Chainage : , Offset= 0.000m HghtOffset= 0.000m Staked : E= m, N= m Elev.= m Deltas : dCL Offset= m dCL HgtDiff= m dChainage= 0.008m dCatch Offs= m dCatch HgtD= 0.081m dHinge Offs= m dHinge HgtD= 5.529m