Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA Risk-Informed GSI-191 Slide 1 South Texas Project Elements of Risk.

Slides:



Advertisements
Similar presentations
Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
Advertisements

Design of Experiments Lecture I
Design of the fast-pick area Based on Bartholdi & Hackman, Chpt. 7.
Original Figures for "Molecular Classification of Cancer: Class Discovery and Class Prediction by Gene Expression Monitoring"
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Uncertainty in Engineering The presence of uncertainty in engineering is unavoidable. Incomplete or insufficient data Design must rely on predictions or.
Summary of Draft NEI Guidance - November 6, GUIDELINES FOR PRIORITIZATION AND SCHEDULING IMPLEMENTATION Pre-Draft 1 – September 30,
Debris Effects in Long-Term Post-LOCA PWR Cooling
©GoldSim Technology Group LLC., 2004 Probabilistic Simulation “Uncertainty is a sign of humility, and humility is just the ability or the willingness to.
Error Propagation. Uncertainty Uncertainty reflects the knowledge that a measured value is related to the mean. Probable error is the range from the mean.
Evaluating Hypotheses
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Control Charts for Variables
CHAPTER 6 Statistical Analysis of Experimental Data
Statistics and Probability Theory Prof. Dr. Michael Havbro Faber
Lehrstuhl für Informatik 2 Gabriella Kókai: Maschine Learning 1 Evaluating Hypotheses.
The Bell Shaped Curve By the definition of the bell shaped curve, we expect to find certain percentages of the population between the standard deviations.
Basics of Fault Tree and Event Tree Analysis Supplement to Fire Hazard Assessment for Nuclear Engineering Professionals Icove and Ruggles (2011) Funded.
1 Prediction of Oil Production With Confidence Intervals* James Glimm 1,2, Shuling Hou 3, Yoon-ha Lee 1, David H. Sharp 3, Kenny Ye 1 1. SUNY at Stony.
Chapter 6 Random Error The Nature of Random Errors
Hypothesis Testing.
Determining Sample Size
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
PWR Owners Group Post-Accident Chemical Effects Work NEI Chemistry Meeting, January 26, 2012.
Reliability Analysis Procedures for Infrastructure Facilities Andrzej S. Nowak University of Nebraska - Lincoln Outline  Causes of Uncertainty  Load.
Risk Assessment and Probabilistic Risk Assessment (PRA) Mario. H. Fontana PhD.,PE Research Professor Arthur E. Ruggles PhD Professor The University of.
Westinghouse Perspective on New Reactor Sumps
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Chapter 7 Estimates and Sample Sizes
Lecture 12 Statistical Inference (Estimation) Point and Interval estimation By Aziza Munir.
Review of Chapters 1- 5 We review some important themes from the first 5 chapters 1.Introduction Statistics- Set of methods for collecting/analyzing data.
Theory of Probability Statistics for Business and Economics.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
Fundamentals of Data Analysis Lecture 10 Management of data sets and improving the precision of measurement pt. 2.
CHLE Update STP October Team Lead Meeting 11/29/2012 Janet Leavitt, Ph.D. 1.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Audit Sampling: An Overview and Application to Tests of Controls
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Pathogen Reduction Dialogue Panel 3 Microbial Testing for Control Verification Robert L. Buchanan U.S. Food and Drug Administration Center for Food Safety.
Project Portfolio Management Business Priorities Presentation.
Statistical Process Control
Issues concerning the interpretation of statistical significance tests.
Copyright © 2010, 2007, 2004 Pearson Education, Inc Lecture Slides Elementary Statistics Eleventh Edition and the Triola Statistics Series by.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
IMPORTANCE OF STATISTICS MR.CHITHRAVEL.V ASST.PROFESSOR ACN.
1 Optimizing Decisions over the Long-term in the Presence of Uncertain Response Edward Kambour.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
1 Project Quality Management QA and QC Tools & Techniques Lec#10 Ghazala Amin.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
ECCS Operability Determination Jim Andrachek Fellow Engineer Westinghouse Electric Company.
Option 2b Template Example Phillip Grissom – Southern Nuclear Based on Vogtle (more or less)
Aggregate margins in the context of level premium term life insurance Results of a study sponsored by the Kansas Insurance Department Slides prepared by.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
1 DATA ANALYSIS, ERROR ESTIMATION & TREATMENT Errors (or “uncertainty”) are the inevitable consequence of making measurements. They are divided into three.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Pressurized Water Reactor Owners Group
Chapter 10 - Monte Carlo Simulation and the Evaluation of Risk
Process Capability.
T305: Digital Communications
Pressurized Water Reactor Owners Group
PWR Sump Performance (GSI-191) Industry Workshop
Søren Vedel, Harry Nunns, Andrej Košmrlj, Szabolcs Semsey, Ala Trusina 
Risk-Informing In-Vessel Effects
Advanced Algebra Unit 1 Vocabulary
RESOLUTION OF GENERIC SAFETY ISSUE 191
Some Key Ingredients for Inferential Statistics
Presentation transcript:

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA Risk-Informed GSI-191 Slide 1 South Texas Project Elements of Risk Informed Resolution Bruce Letellier Los Alamos National Laboratory Los Alamos, NM NEI Chemical Effects Summit NRC Public Meeting January 26 and 27, 2012

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Goals of Risk-Informed Analysis Assess a full spectrum of accident scenarios considering both likelihood and outcome Retain deterministic assumptions like DEGB (where physically plausible), but balance by probability of occurrence Exercise phenomenologic models where possible to understand realistic time-dependent behavior Retain prudent conservatism where lack of knowledge limits predictive confidence Express alternative risk management strategies as differential impacts on Core Damage Frequency and Large Early Release Frequency (∆CDF and ∆LERF) Requires interface with existing plant PRA Initial STP quantification compares present plant to “perfect” plant with no debris or chemical induced recirculation failures Evaluate scenarios to identify any required actions to reduce and/or manage risk (RG guidelines) Slide 2

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Regulatory Guide STP initial quantification compares present plant to perfect plant with no debris or chemical induced recirculation failures: “Can something be done to obtain a significant risk benefit (figure on left)?” STP will quantify benefit of new strainers vs old to show decreasing marginal risk reduction Threshold criteria presently include ECCS NPSH and in- core fiber accumulation Approximate treatment of chemical effects based on strainer tests with WCAP products Slide 3

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Interface with PRA PWR PRAs include a top event for “sump strainer failure” under various plant states (conditions of equipment functionality, or recirculation success - ECCS) Typically, a new top event is required to accommodate evaluation of downstream blockage in the core CASA Grande supports PRA by quantifying failure probabilities at the strainer and at the core Thousands of break scenarios evaluated relative to thresholds of NPSH req, fiber mass/fuel assembly, etc. Chemical effects (at STP) are treated as time-dependent phenomena that do not pose immediate challenges to head loss or core blockage (≥24 hr delay) Slide 4

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Risk-Informed Resolution Path Chart 3 from Risk Informed Road Map Slide 5

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Key Attributes of Risk-Informed Process Initiating event frequencies Weld failure, RCP LOCA, PRT release Spatial description of plant geometry Time-dependent scenario development Debris and chemical challenges competing with equipment operation and operator action Uncertainty quantification for major phenomena Categorization of primary behavior Small, Medium, Large LOCA Spray vs no Spray phases High temp/pressure phase vs. atmospheric Active corrosion vs. passivation Surface deposition of chemical products vs. ppt in solution Slide 6

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Statistical Risk Evaluation Evaluate thousands of break scenarios over full spectrum of sizes, conditions and uncertain parameter values Robust sampling of all uncertain parameters ensures precision of extreme consequence tail (DEGB, min water levels, etc.) Weight the outcome of each random scenario by its respective likelihood to form probability distribution of any performance measure (NPSH, void fraction, etc) Compare Pr distribution to “threshold of concern” to determine “failure” probability Slide 7

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Containment Accident Stochastic Analysis (CASA) Grande Slide 8 Demo

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Risk Assessment Philosophy Slide 9 Threshold of Concern Probability of Exceeding Threshold Develop and understand the entire distribution of possible outcomes for a performance metric Quantify the proportion of scenarios that exceed some acceptable standard (failure) Prioritize and manage the risk of failure posed by this one issue among all other risk contributors Performance Level Probability Density (# per unit performance)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Competing Risk Determinants Blue distribution of all possible physical outcomes Red threshold of concern Steep decline indicates rapid improvement with increased tolerance Risk Reduction obtained by increasing tolerance and/or decreasing conservatism and/or impact Slide 10 Decreased Physical Conservatism Increased Tolerance

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 STP Prototypical Head Loss Histories Steep increase indicates arrival of coating debris (and chemical products) No cases found in parameter space that exceed limiting NPSH of 18 ft H 2 O Even with conservative head loss treatment shown (x5) there may be margin for chemicals Slide 11

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Risk-Informed Chemical Test Strategy Limited long-term tests establish trends for major sections of risk spectrum (Small, Med or small Large, Large LOCA) Thermodynamic equilibrium calculations guide supporting bench-scale tests to quantify likelihood of adverse effects cited by PIRT near each trend Utilize CASA debris distributions to support selection of test conditions Containment simulations to establish pool temperature histories Slide 12 Relate each test to a region of the risk spectrum Chemical findings alone are not useful for risk-informed resolution unless there is a corresponding understanding of likelihood

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Topics for Discussion Existing experience with uncertainty quantification and propagation to industrial water quality issues Importance of high-temp corrosion/spray above atmospheric pressure Existing evidence of surface precipitation (rather than ppt from bulk solution) Measures taken to reduce or mitigate chemical product formation or head loss Evidence that cyclic temp variations help/hinder issues Is Boron ppt considered a “chemical effect” for GSI-191 and/or is it an important debris source Assumptions Re fuel damage from pressure transient that would cause sprays to remain on Assumptions Re release of scale on fuel during thermal/pressure transient that represents additional particulate source Slide 13

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Tutorial Slides Slide 14

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Uncertainty in Decision Thresholds Slide 15 Question: Does the datum drawn from blue physical dist exceed the threshold drawn from green tolerance dist? Repeated answers to this question form basis for binomial failure probability.

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 Sampling a Probability Distribution Slide 16 Smaller of 2 bins spanning MLOCA range Difference between upper and lower exceedance prob = bin prob (weight) Parameter values chosen from each bin to obey dist

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA August 22, 2011, NRC PreLicensing Meeting Risk-Informed GSI-191 UQ “Rules of Thumb” Partition (bin) the entire range of each random variable and calculate the probability spanned by each bin. Can have different number of bins for each variable, but assignments are easier if all variables have the same #. Select a value to represent each bin using the probability distribution Carry the bin value AND the local probability weight hand-in-hand. Evaluate as many combinations of variables as practical using each bin of a variable an equal number of times. “Evaluate” means run the code/model with each random combination of variables The “answers” are assigned a weight equal to the product of bin weights for every variable involved in the calculation. The sum of multiplicative weights for all of the results is used as the denominator to calculate the relative proportion of each answer. Rank order the result values and form a cumlative sum of the relative weights to obtain a properly normalized distribution of results. Plot CumSum vs ordered values. Slide 17