Sylvan Theater Column Restoration Project 2007 - 2008.

Slides:



Advertisements
Similar presentations
Readyville Mill Restoring the Readyville Mill. March 2006 Forgotten and Neglected for 40 years.
Advertisements

LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
Building the Rankin Ridge Fire Tower 2006 marked the 50 th anniversary of the construction of the Rankin Ridge Fire Tower. Because of improved fire fighting.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Construction Laborer Carpenters Helper Rough Carpenter Construction Carpenter Cabinetmaker/Bench Carpenter.
Unit 2 The Building Trades
A-ABLE SEPTIC-SEWER SERVICE, INC. MOUND SYSTEM MOUND SYSTEM.
Intermediate SFFMA Objectives: – hrs received.
ADM – Mankato MN - Concrete Repair Remove Unsound Concrete.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Foundation Systems.
Floor maintenance is the procedure to maintaining the floor that should be doing by us as a housekeeping. We should knowing about this, because we will.
Montana Truss Rehabilitation Projects Lozeau Bridge over the Clark Fork Dearborn River High Bridge Van Buren Street over the Clark Fork.
MODULE THREE – ROOF DECK AWARENESS. The employer shall determine if the walking/working surface on which its employees are to work have the strength.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
Chapter 29 Landscaping.
Introduction to a pit installation
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Quality of Works 1.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Bing Kong Tong Building at the completion of Phase 1 Grants provided by CCHE and SHRA.
Original 3D model received. Modify model for pattern Pattern boards are added to the model for pattern production The file is directly imported into ArtCam.
Paints and Preservatives Surface Preparation Surface preparation to remove dust, oil, moisture and other loose material from the surface should.
Window Treatments and Accessories Study Guide Interior Design Contest.
Objective Distinguish between site preparation, placing, finishing, and curing.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting February 27, 2001.
1 Structural Soil “Olympia Style” Presented on December 3, 2001 Bellvue, WA By: Joe Roush, Urban Forester City of Olympia.
April 19 – Old carpet has been removed Color palette selections.
Installing a Backflow Cage. Verify the Backflow and Area.
Twin Spine Installation. Installation of a Twin Spine is very simple and easy. Before you begin, make sure you have a copy of the installation instructions,
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
Wooden Fences By TotalFence Inc Total Fence Inc is a top choice of customers for wooden fencing. We provide varieties of wooden fence designs for commercial.
DORS CS#15-24 Home Modification for Removal and carting away of Existing Aluminum Ramp and treated wood platform Demolition, removal and carting away of.
College of Innovative Eurasian University Specialty "Standardization, Metrology and certification"
Transform Your Old Floor into New One. Welcome to Love Marble Stone Care - We specialize in restoring marble and other natural stone surfaces - floors,
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.
HWQJ , ATTACHEMENT # 03 REV. 1, slide 1 BLDG. # 5101, GHEDI AF BASE Paint metal structure, sliding doors, gutters and downspouts.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Water Services Trust Fund
SX1 manipulation VERSION 1 Version
Assembly And Installation Of Ikea Kitchen Cabinets
(Refer to Chapter 2 of the textbook)
HOUSING & INTERIOR DESIGN
Click to add Text Professional Basketball Goal Installation and Maintaince Services in Maryland, Virginia and Washington DC. Basketball Installation.
Running moulding on a bench
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Ramar-Hall Addition: 2017.
INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION
In-Class Scheduling Exercise

The Refurbishing Process

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

Presentation transcript:

Sylvan Theater Column Restoration Project

Columns & Grove Before Restoration

Column Restoration Removal of columns Demolition of old wooden bases Cleaning and repair of columns Fabricate forms for new concrete bases Painting of columns Cleaning and rust proofing support columns Pouring and finishing of new concrete bases Repair and painting of capitals Re-installation of columns Patching of support attachments Painting of column bases

Bases Because the old bases were wood and rotted out it was determined to make the new bases out of concrete. Alterations carpenters using special materials were able to create an extraordinary re-usable curved concrete form. Outside masons then poured and finished the bases. These new bases will be painted white when totally cured. The new bases will last for the next 50 years

Fabricated Re-usable Curved Base Form

Completed Concrete Base

Bases Complete and Ready for Columns

Transporting Restored Column

Re-Installation of Column

Column Going Up

Careful Protection of Restored Column

Column prepared to be lifted into place

Column Install & protection of Grounds

2 nd Column Installed

Designed Lifting to Protect Columns

Exacting Installation

Grove Restored – Columns in need of Restoration

Columns and Grounds Restored