DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.

Slides:



Advertisements
Similar presentations
What is the ISOLDE cooler RFQ CB - ISCOOL H. Frånberg.
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
December 10, 2008 TJRParticle Refrigerator1 The Particle Refrigerator Tom Roberts Muons, Inc. A promising approach to using frictional cooling for reducing.
ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Grupo de Física Nuclear Experimental IEMIEM CSIC ISOL MAGISOL Meeting January 2009Mª José Gª Borge SPIRAL 2 Outline:
The low-energy facility at SPIRAL2 transport-energy (50 keV) exotic-nuclide beams for: For the DESIR Collaboration: D. Lunney, SPIRAL2 SAC, 29 January.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Possibility for the production and study of heavy neutron-rich nuclei formed in multi-nucleon transfer reactions proposal for a new project at FLNR V.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
SPEC(troscopy) -Trap Outline of talk Introduction – motivation for two cross continent traps Imperial College Group – areas of interest and expertise SPECTRAP/SPECTRAP’
Superheavy Element Studies Sub-task members: Paul GreenleesJyväskylä Rodi Herzberg, Peter Butler, RDPLiverpool Christophe TheisenCEA Saclay Fritz HessbergerGSI.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
On-line tests RFQ cooler ISCOOL A quick summary P. Delahaye, H. Frånberg, I. Podadera ISCOOL, COLLAPS, ISOLDE collaboration.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
CEA Bruyères-le-chatel, April 27, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
JINR PAC, Dubna, G. Gulbekian Status of the DRIBs III Project cyclotron DC280 new experimental hall (SHE factory) cyclotron U400R reconstruction.
Duncan J S Johnson.  Determine nuclear properties by observing HFS via collinear laser spectroscopy.  Currently in the process of studying manganese.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
Status of E391a Search for K L    decay G.Y.Lim IPNS, 32nd ICHEP 19 th August 2004 Beijing.
The DESIR facility at SPIRAL2  collaboration initiated during the first SPIRAL2 workshop, July 2005  to use SPIRAL2 and SPIRAL low energy (
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
 -capture measurements with the Recoil-Separator ERNA Frank Strieder Institut für Physik mit Ionenstrahlen Ruhr-Universität Bochum HRIBF Workshop – Nuclear.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
Fundamental Interactions Physics & Instrumentation Conclusions Conveners: P. Mueller, J. Clark G. Savard, N. Scielzo.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Physics at DESIR RFQ cooler SHIRaC HRS transfert beam lines DESIR building safety finances J.C. Thomas, GANIL July 2010.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
A new RFQ cooler: concept, simulations and status Trapped Radioactive Isotopes:  icro-laboratories for Fundamental Physics E. Traykov TRI  P project.
A mass-purification method for REX beams
Status of the Source of Polarized Ions project for the JINR accelerator complex (June 2013) V.V. Fimushkin, A.D. Kovalenko, L.V. Kutuzova, Yu.V. Prokofichev.
Laser Laboratory (-ies) Peter Müller. 2 Search for EDM of 225 Ra Transverse cooling Oven: 225 Ra (+Ba) Zeeman Slower Optical dipole trap EDM probe Advantages:
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
The DESIR low energy beam facility at SPIRAL2 DESRI Decay, Excitation and Storage of Radioactive Ions B. Blank, CENBG LEA.
Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April 20-24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ISNP2009, BARC, Mumbai, 8-12 december, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme.
Design and Development of a Trochoidal Mass Separator at the Berkeley Gas-filled Separator J.M. Gates, K.E. Gregorich, G.K. Pang, N.E. Esker and H. Nitsche.
TRI  P RFQ design, simulations and tests E. Traykov TRI  P project and facility RFQ tests and design Simulations Conclusion TRI  P Group: G.P. Berg,
Concept Preliminary Estimations A. Kolomiets Charge to mass ratio1/61/8 Input energy (MeV/u) Output energy (MeV/u)2.5(3.5) Beam.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
“MuCyc” Update Kevin Paul Tech-X Corporation Don Summers University of Mississippi 1 NFMCC Meeting - 27 Jan 2009.
CEA Saclay, April 24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety around DESIR.
CEA Saclay, April 24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety around DESIR.
Korea Atomic Energy Research Institute Byung-Hoon Oh, Sang-Ryul In, Kwang-Won Lee, Chang Seog Seo*, Jung-Tae Jin, Dae-Sik Chang, Seong Ho Jeong, Chul-Kew.
Laboratoire de Physique Corpusculaire de Caen
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
STATUS REPORT ON THE “MASHA” SET-UP A.M.Rodin, A.V.Belozerov, S.N.Dmitriev, Yu.Ts.Oganessian, R.N.Sagaidak, V.S.Salamatin, S.V.Stepantsov, D.V.Vanin PAC.
Precision Tests of Fundamental Interactions with Ion Trap Experiments
Proposal to the INTC, 21. May 2007
NICA injection complex status
The Medium and High resolution mass separators for SPES facility
A. Martynov on behalf of accelerator division.
Status of the MAX IV Short Pulse Facility
Have a chance to operate your own beam at CERN
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
JYFL ION COOLER AND BUNCHER.
SPES-RFQ review Introduction, general aspects
ELENA Extra Low ENergy Antiproton Ring
Advanced Research Electron Accelerator Laboratory
Physics Design on Injector I
Presentation transcript:

DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS room in production building first transmission tests of RFQ RF system successful tested detailed optical study of HRS S3 – DESIR beam line is established work on safety at DESIR started DESIR web pages online ( EURORIB meeting, 10 June 2008

Spiral and GANIL S3S3 DESIR Level -1 Level 0 15 m Production building Accelerator NFSNFS SRISRI SPIRAL2 layout

Production building F. Varenne

Spiral and GANIL S3S3 DESIR Level -1 Level 0 15 m Connections to DESIR

12m 8m HRS RFQ storage and maintenance Legend: Electronics Quadrupole Sextupole Multipole Dipole RFQ and HRS cave

The High Intensity RFQ Cooler SHIRaC Length = 70 cm Radius = 3mm

Test bench at LPC-Caen (Oct 07/ Jan 08) Current tests are done with ionization source –I max ~ 50 nA

Simulation First Part: Code developments including RF fields, microscopic approach for cooling, space charge Input beam : 133 Cs+ beam Emittance : 75π.mm.mrad Energy : 20keV Intensity : 1µA Cooling distance at 0.05mbar ~ 400mm Output emittance < 1π.mm.mrad Injection efficiency ~ 25 %  Acceptance ~ 35 π.mm.mrad Second Part: Two cooling sections with different r0-radius 5 mm and 3 mm + 4mm junction Same RF on the two sections Better injection efficiency (~ 100%)  Acceptance ~ 75 π.mm.mrad Same cooling effect Same emittance Better overall efficiency

RF breakdown (Jan 08/Mar 08) 2 electrodes face to face –RF amplitude –Helium pressure –Gap –Roughness Working pressure DN160 Flange Micrometric screw 2µm Electrodes Ø7 Insulator 2 SHV No RF breakdown : –For Etching polishing under 3600V pp and 15Pa –For Ra 1.6 under 3400V pp and 12.5Pa

Beam transmission (Jun 08) Cooler in RF-only : 10 % for 23 Na + and 133 Cs + Transmission vs RF voltage for 133 Cs + :

SHIRaC Modification (Sep 08) Additional pump  Low pressure at injection and extraction electrodes Gaz injection Emittance measurement  more details on the poster of F. Duval

Mass resolution: M/  M = x’s, 3 y’s, 3  ’s, 3  ’s, 1 mass, 1 energy 3  mm mrad, 50 keV

R = 22091

Initial and final beam envelops First and fifth order mass separation for 1/20000 mass difference

0.2 mm shift of multipole: significant loss in mass resolution  more details on the poster of T. Kurtukian Nieto

DESIR layout 17/04/08 Laser room (mezzanine) DAQ room Meeting room (on top of DAQ) Kitchen (on top of CR) Control room MLL trap Collinear Laser spectroscopy  -NMR RFQ bun- cher off-line source 1 off-line source 2 Penning trap + Decay setup Paul trap Beam from SPIRAL1 Beam from S3 Beam from Production building General purpose Electronics Desk Access 5 m Level -1 Level 0 TAS Neutron ditch Level -1 Crane access to basement Double MOT General purpose IS Identification station with tape LN2 Gas & waste storage LUMIERE BESTIOL

Supply Electri- city Work- shop Gray Room 2 Gray Room 1 Assembly Room 3 Control Racks Inter- faces HV supplies Crane access to basement Stor- age 1 Assembly Room 2 Assembly Room 1 Stor- age 2 free 5 m free Neutron ditch DESIR Level -1 Limits DESIR hall free