Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
401 Water Quality Certification South Carolina Department of Health and Environmental Control.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Department of Army Permitting Process: Dredging
ODOT – FHWA Environmental Performance Measures February 2012.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
US Army Corps of Engineers One Corps Serving The Army and the Nation U.S. Army Corps of Engineers Regulatory Program.
EPA’s Proposed Rule on Waters of the United States February 27, 2014.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
April  Side-by-side comparison of definitions: Justin Russell, OSU (HANDOUT)
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
US Army Corps of Engineers BUILDING STRONG ® Regulatory Program Glen Justis Chief, Policy & Administration Regulatory Division Alaska District 2010 Building.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Section 404 of the Clean Water Act 404(b)(1) Guidelines Field Exercise
NEFU Annual Convention Mike Mullen - Licensing and Compliance Coordinator Division of Land Resource Regulation MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Wetland Creation Why and How Char Ison and Caleb Asbury.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
ARE 309Ted Feitshans020-1 Unit 20 Regulation of Wetlands Section 404 of the Clean Water Act, Section 10, Rivers and Harbors Acts of 1890 and 1899.
August 2,  404 Assumption Review  Project Schedule Review  Summary of Stakeholder Outreach Meetings  Status of Assumption Effort  Statutory.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
U.S. Army Corps of Engineers REGULATORY PROGRAM WILMINGTON DISTRICT March 13, 2008.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
US Army Corps of Engineers BUILDING STRONG ® Carrie Bond Project Manager ODOT Liaison Portland, Oregon April 21, 2015 Understanding the Corps Permitting.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Regulatory Permits for Farm Bill Projects Jackie Charbonneau, Ecologist Natural Resources Conservation Service September 20, 2012.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District Nationwide Permit Overview Cindy House-Pearson Chief, Inland.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Department of Army Permitting Process: Dredging
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Impact Analysis. Impact Analysis (204) ODOT attempts to avoid, and minimize impacts to the natural environment throughout the PDP process Despite these.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Restoration and Regulation Discussion
Environmental Compliance & Bridge Maintenance
Programmatic Agreements
Barriers and Challenges to Developing Renewable Energy Projects
Storm Water Pollution Prevention Plan Development
Coal Mining Activities
THE CORPS REGULATORY AUTHORITY
BEST MANAGEMENT PRACTICES (BMP’S)
Coal Mining Activities
Michigan Dept. of Environmental Quality Water Resources Division
EPA Public Meeting Dallas, Texas May 10, 2005
Water Management in the U.S. Oil and Gas Industry
Waters of the U.S. Updates and Changes
An Introduction to the Corps of Engineers Regulatory Program
Pipeline Planning and Construction: Environmental Considerations
Restoration and Regulation Discussion
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT

Overview 1.The main actors: DSL and the Corps 2.A recommended decision sequence to navigate the permit process 3.Avoiding permit process potholes 4.Tools and references

State Removal-Fill Law Waters of the state Essential salmon habitat Non-essential salmon habitat Permit types General Authorizations General Permits (new) Removal-Fill Permits DSL Factoids Admin. rule timeframes to issue 50 cy permit threshold in non- essential habitat DSL

Section 404 Clean Water Act Section 10 Rivers and Harbors Act Waters of the U.S. 404 waters Section 10 waters Navigable waters Permit types Nationwide Regional General Individual Corps Factoids No hard timeframes to issue permits No permit volume thresholds ESA compliance critical Tribal consultation critical Corps of Engineers

Basic permit questions Do I need a permit for this project? If so, what are the requirements to obtain it? How long will it take to get?

A recommended decision sequence

1.Is the project area jurisdictional? 2.If yes, does an exemption apply? 3.If a permit is required, do we qualify for a “streamlined” permit? 4.Is mitigation required? A recommended decision sequence

1a. Jurisdiction (cartoon version) Removal-Fill Law Section 404 Tidal Waters Fresh Waters Removal-Fill Law & Section 404 Section 10 Uplands Tidelands Coastal Wetlands Streams, ponds, lakes, some ditches Freshwater Wetlands Section 10 if navigable Uplands OHWL Mean High Water High Tide Line Ground Water Line

1b. Jurisdiction example Coast Fork Bridge, I-5 Willamette River, Lane Co. High flow channel above OHW (not regulated) Upland (not regulated) OHWL Wetlands N Willamette R.

1c. Challenging jurisdictional features Roadside ditch Drainage ditch “Dry” Wetlands

2. Do exemptions apply? Culvert replacements –cleaning sediment from barrel –installing larger diameter barrel within the road prism –Not for: temporary road access fills stream realignment sand bag dams for temporary water management?

2. Do exemptions apply? Repair/maintenance of transportation structures –repair of road scour that had riprap –scour around structures that had riprap –Not for: relocating structures scour that was unprotected

3a. Do we fit a “streamlined” permit? DSL –General authorizations ~ mini individual permits –General Permits (new and untried) Corps –Nationwide Permits –Regional General Permits

3b. Permit application timing Permit target date JPA submittal time before target date (months) DSL/Corps Individual Permit GA & NWP ~ -3 wks Final JPA Items In NMFS BiOp DEQ 401 Cert DEQ SWMP SHPO OK Tribal OK

1.Avoid impacts 2.Minimize unavoidable impacts 3.Rectify temporary impacts 4.Compensate for permanent unavoidable impacts a.Mitigation banks – first priority b.Fee in lieu – second priority c.Physical mitigation site – last option unless a low cost, low risk option is available 4. Mitigation

Avoiding permit process potholes

Typical potholes Timing of wetland delineation/jurisdictional determinations Incomplete applications Negative public comments during app review Final completeness items missing before permit issuance Surprise permit conditions

Preventing violations Wetland Contract special provisions No equipment No driving No disturbance Prevent sediment discharge into NWZ No work zone Construction Fencing

For detailed info— ODOT Geo-Environmental E-guide – ONMENTAL/e_guide.shtmlhttp:// ONMENTAL/e_guide.shtml ODOT Geo-Environmental Wetlands and Permits Manual – AL/ AL/

End