1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.

Slides:



Advertisements
Similar presentations
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Advertisements

Roadway Intersection Design In GEOPAK Site
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Bentley Systems, Incorporated Chris Collins
Patrick Evans, P.E. Senior Advisory Pre-Sales Technical Support Rep Superelevation in the Roadway Designer.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
Wisconsin DOT Facilities Development Manual (FDM)
Section Cross Slope District 1 Your logo here.
Road Design Basic Road Design
Geometric Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
CDOT MicroStation and InRoads Transition NH SH 119 & SH 52
Site and Highway Staking with Trimble SCS900
© 2009 Bentley Systems, Incorporated Chuck Lawson GEOPAK Product Engineer Abutment Design with Roadway Designer.
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
Moving to Civil V8i Select Series 3 Robert Garrett.
Earthwork Training Introduction Good Morning I am ____
Presented By: Chuck Lawson, PE Paving the Way for Roadway Designer in GEOPAK V8 i (SELECTseries 1)
Layout a Project. OVERVIEW Familiarize you with techniques and procedures in staking / laying out a project using an Trimble S6 and R8 GPS – Controlled.
Chapter 13 Site Plan Layout.
Floodplain Boundary Standard A Coastal Perspective May 23, 2012 Mark Zito, GISP, CFM CDM Smith Alex Sirotek, CFM CDM Smith RSC 1 Lead.
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Data Input How do I transfer the paper map data and attribute data to a format that is usable by the GIS software? Data input involves both locational.
Working with 3D Models in Design & Construction Panel Discussion 1.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Horizontal Alignment See: (Chapter 5 from FHWA’s Flexibility in Highway Design)
“We Bring Engineering to Life” 3-D Stream Restoration Design, Monitoring and Beyond David Bidelspach, PE - Stantec Consulting Greg Jennings, PE – NCSU.
LandXML.org 2006 Nathan Crews Principal Schema Architect, LandXML.org Software Researcher, Autodesk.
EVA Magician for Injection Molding of EVA Shoe Soles.
Revisions There is a column with dates that the plans were revised in the bottom right corner of the title sheet.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Roadway Conference 13 April, 2010.
Wes Marshall, P.E. University of Connecticut March 2007
Part II – Applications 3D Engineered Models for Construction Part II - Applications September
Planning for Earthwork Construction
© 2009 Bentley Systems, Incorporated Corey Johnson-Bentley Intersection Design with Roadway Designer.
Horizontal Alignment CE 453 Lecture 16.
Horizontal Curves Chapter 24.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
DigitalTerrainModelling: 1 Digital Terrain Model also known as –digital ground model (DGM) & –digital height model (DHM) a method of representing the.
National Research Council Mapping Science Committee Floodplain Mapping – Sensitivity and Errors Scott K. Edelman, PE Watershed Concepts and Karen Schuckman,
Highway Route Surveys And Location
1 Bringing Machine Control to California DOT (Caltrans) Construction Projects Kevin Akin, LS Office of Land Surveys.
E4014 Construction Surveying Road Construction Plans.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
CE303: Introduction to Construction Blueprint Lab.
© 2012 Bentley Systems, Incorporated Moving to Civil V8i Select Series 3 Robert Garrett, Bentley Systems Inc. Product Manager.
Presented by: Chuck Lawson, PE Roadway Designer and Machine Control – What You Need to Know.
GEOPAK Corridor Modeling Derricke Gray, GEOPAK Product Manager.
MC3D V1.1 - Match-Cast 3D Geometry Control Software
Resident Engineer/Survey Collaboration Maximize the Value of Both Services.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
© 2009 Bentley Systems, Incorporated Derricke Gray GEOPAK Product Manager Roadway Designer - Completing Your Project.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
GEOMETRIC DESIGN: HORIZONTAL ALIGNMENT
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
Trimble GCS900 Grade Control System. Definition: Construction The act or result of – Conceptualizing (we need a airstrip) – Interpreting and planning.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
How are Highway Designs Actually Represented in Surface Models for Automated Machine Guidance and How Should We Control Them? Alan Vonderohe Construction.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
What is 3DM (DTM)? – Collection of intelligent computer objects that represent an original surface – The objects know their position in space and in what.
Chapter 1 Introduction to AutoCAD Civil 3D 2009 Learning Objectives: Understand basic features of AutoCAD Civil 3D Start AutoCAD Civil 3D Understand.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Highway Alignment And Geometric Design
Site Grading Site Grading Civil Engineering and Architecture
Working Drawings Chapter 12.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Presentation transcript:

1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor

2 Cross-Sections vs. Surfaces We traditionally design and build accurately at each cross-section We now have the capability to design and build accurately everywhere However, construction can only be as accurate as the survey data and controls Construction control tolerance is not any more precise than the design 3D surface model

3 Design Today: Cross Section- Based 3D Design Modeling

3D Design Surface Layers Finished surface (top of pavement) Aggregate base (bottom of pavement) to foreslope Aggregate subbase layers (if any) Subgrade surface from slope stake to slope stake Subexcavation or wall foundations (undercut) 4

3D Design Model Work Flow Develop the geometric design information Prepare cross sections for design model Generate 3D design surface model (TIN) Check the 3D surface tolerances Verify the 3D surface path Spot check xyz of the TIN Clip the existing terrain and merge the design and terrain surface models Export the combined 3D surface models –Generate file formats for the Contractor 5

6 Electronic File Formats ASCII (generic software) Land XML (Topcon software) Trimble (Trimble Terramodel and Sitevision software) –Trimble.TTM format

7 Pattern Lines for 3D Design Model

Pattern Lines for 3D Model Interval spacing is dependent on the radius of curvature Add sections at the beginning and end of superelevation transitions At begin and end of widening transitions, including for traffic barrier terminals At begin and end of road approach intersections Changes in ditch configuration and inlets 8

9 Chords Between Sections

10 3D Design Model Tolerances Design Element Horizontal (X and Y coordinates) Vertical (Z coordinate) Roadway template points ±0.04 ft±0.01 ft Roadside ditch and other slope points ±0.1 ft±0.05 ft

11 Rec’d Pattern Line Spacing Pattern Line Spacing* Horizontal Curve Radius Vertical K Value 10 ft≥ 300 ft and tangents≥ 13 and tangents 5 ft75 ft < 300 ft6 < 13 2 ft< 75 ft< 6 *Also at centerline points (PC, PT etc.) and at superelevation and widening transitions for final design

12 Cross-Sections for 3D Design Model

13 Template Surface Points Subgrade Layer

14 Connect Similar Cross-Section Point Labels Using Breaklines

15 Transitions (Cut to Fill)

16 Cut to Fill Breaklines

An Ideal World The Design engineer provides the Contractor a complete 3D model that fits site conditions Contractor easily loads 3D surface model directly into the machine guidance system The Contractor builds project accurately to the plans, specifications, and tolerances Any changes or revisions are updated in the 3D surface model by the project engineer As-built 3D surface model is given back to the owner (State DOT) 17

The Real World Existing ground data does not match to site conditions or with 3D design surface model Missing data, information and details about exceptions to the model –Lack of detail at intersections and culvert inlets and outlets requires manual adjustments and warping –Ditch profiles do not match with culvert inlets or site conditions –Special ditch information is shown in the plans profile but is not in the 3D design surface model Specifications do not fully address the work 18

19 Design Changes for 3D/AMG Cross section pattern lines at closer intervals (typically 10-feet instead of 50-feet) to achieve the required accuracy in the 3D surface Proficiency with special applications of the design software to generate the 3D surface Time-intensive activities associated with these new applications are: –Hand–editing any cross-sections that cannot be drawn with standard criteria (modify text search) –QC checks of the 3D surface between pattern lines

Changes for 3D/AMG cont’d Contract special provisions –How to resolve discrepancies between the electronic data and the contract plans –Responsibility for changes to electronic data Achieving a common understanding of the concepts and limitations in the design model –Exceptions (what is not modeled) –Degree of accuracy and precision –Discontinuities (linear changes and transitions) 20

Construction Changes for AMG Understanding the concepts and limitations of the electronic 3D design model (exceptions, degree of accuracy) Understanding the AMG accuracy limitations Performing the necessary layout, inspection activities with less “wood in the ground” Using suitable survey equipment and methods for layout, inspection activities, and for independent QA of the Contractor’s AMG methods 21

22

Challenges for 3D Design Modeling guidance and training is needed Standards for the 3D model deliverables –Design data files that are provided –Electronic data formats Professional liability/Engineer of record Consistency, uniformity, quality control Quantities calculation and documentation QA/QC of 3D data (DTM, design data files) Field verification and changes to design data Documentation of as-built project features 23

RRR Projects: Challenges for 3D Design Modeling Procedures and specifications for using design models derived from resource-grade survey and mapping technologies Develop end-result, performance based methods and specifications for control, rather than strict line and grade position Allow flexibility and foster innovation Expedite production and reduce costs 24

25 Standards and Procedures When to develop 3D design models for AMG? How to develop the model? –What features to include? –How many layers? –What level of detail? What format to provide the model for others to use? How to manage changes to the as-built design model? How to document and retain electronic records?

26 Caution: Automated Computer Design Plus Machine Guidance