Prepared for City of Palm Coast, Florida April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan
Singhofen & Associates, Inc.April 28, 2015 To anticipate the need for additional services and infrastructure to provide opportunities for mixed use development with goods, services, and employment. Goal 1 Expansion
Singhofen & Associates, Inc.April 28, 2015 Section Numbers Sections Already Modeled Sections Being Modeled City of Palm Coast Modeling Status
Singhofen & Associates, Inc.April 28, 2015 City of Palm Coast Modeling Status
Singhofen & Associates, Inc.April 28, 2015 Section 35 High water levels due to Constrictions at London Drive, US 1 (to Hulett Branch) I-95 (to Mulberry Creek) Home flooding predicted in < 1 % of homes (all in Bird of Paradise area) Number of homes below City standard for 100-year event = 11 % Secondary drainage deficiencies - 10 year event = 2 Modeling Results
Singhofen & Associates, Inc.April 28, 2015 Section 35 (“B” Section) – Level of Service Deficient secondary roads = 2 Secondary drainage deficiencies
“B” Section (Section 35) Improvements Ditch and Pipe Modifications (Bunker Hill Drive to Burnaby Lane) 2014 Program Results
Singhofen & Associates, Inc.April 28, 2015 Section 37 High water levels due to Constrictions at London Drive, US 1 (to Hulett Branch) I-95 (to Mulberry Creek) No home flooding predicted Number of homes below City standard for 100-year event = 9 % Secondary drainage deficiencies - 10 year event = 6 Modeling Results
Singhofen & Associates, Inc.April 28, 2015 Section 37 (“L” Section) – Level of Service Deficient secondary roads = 6 Secondary drainage deficiencies
“L” Section (Section 37) Improvements Ditch and Pipe Modifications (Lindsay Drive to Lancelot Drive) 2015 Program Results
Singhofen & Associates, Inc.April 28, 2015 Sections 35 & 37 – Recommended Capital Improvements Possible Detention Storage Locations ~100-acft required in total
Singhofen & Associates, Inc. April 28, 2015 System Performance Evaluation For Homes: Home flooding evaluated relative to base flood (i.e., 100-year storm) City has required 1 foot of freeboard above 100-year elevation Level of Service Evaluations Freeboard
Singhofen & Associates, Inc. April 28, 2015 Model Results Level of Service Improvement : Homes below 100-year City standard reduced by 63 % Homes remaining below 100-year City standard = 4 % All secondary deficiencies eliminated
Singhofen & Associates, Inc. April 28, 2015 Recommended Improvement Plans based on Modeling Results for Section 35 and Section 37 Section 35 Improvements: Ditch and Pipe Improvements Design Completed Construction Completed Section 37 Improvements: Ditch and Pipe Improvements Design Completed Construction is 50% Complete Floodplain Storage Creation Proposed areas include three general locations along the Belleaire canal waterway in Section 37. Design, Permitting, and Construction Services proposed.
Singhofen & Associates, Inc. April 28, 2015 Next Step for Implementation Section 37 Floodplain Storage Permitting and Design Services Scope of Services is in two Phases: Phase 1: Initial survey, environmental, and geotechnical services Provide preliminary layout of proposed design (30% Plans) Phase 2: Finalizing proposed design Prepare construction plans and permitting Staff recommends approving a work order for Section 37 Floodplain Storage Permitting and Design
Singhofen & Associates, Inc. April 28, 2015 QUESTIONS?