 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.

Slides:



Advertisements
Similar presentations
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Advertisements

2009 City of Bozeman Storm Water Update
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Edward Yousif February 2013 DRAINAGE DESIGN MANUAL REVISION HIGHLIGHTS 1.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Volusia County Public Works
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
CIVIL ENGINEERING.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
Community Development Department COBBLESTONE VILLAGE FIRST AMENDED AND RESTATED MASTER PLANNED DEVELOPMENT AGREEMENT Application #2241.
Community Development Department Neoga Lakes – Development of Regional Impact (DRI) Master Planned Development (MPD) Rezoning Application.
 Prepared for  City of Palm Coast, Florida  June 24, 2014 Drummond Property Acquisition in Connection With The Land Donation of 70 Laramie Drive From.
2015 Annual Strategic Action Plan Evaluation. Background & Overview January 2015: Citizen Survey Results March 2015: 2014 Annual Progress Report Delivered.
Bringing It In House. IndianTrailsSportsComplexexpansion.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Community Development Department Community Development Department Shoppes of Palm Coast Nonresidential Controlling Master Site Development – Tier 2 Application.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Evaluation and Appraisal Comprehensive Plan Amendments City Council Workshop December 9, 2014.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Bringing It In House. IndianTrailsSportsComplexexpansion.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Pre-Disaster Mitigation Grants 2012 Presented to Palm Coast City Council December 20, 2011.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Ordinance No XX Application LU-MIN Small-Scale Future Land Use Map Amendment Twenty Fingers Property June 5, 2007 City Council Meeting.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
PORT OF TACOMA. Request authorization to expand the scope and increase the authorized amount of Contract No , for work associated with the WUT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
CITY COUNCIL WORKSHOP – APRIL 12, Strategic Action Plan Evaluation Results.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Community Development Department Ryan’s Landing Planned Unit Development Application No
Storm Water Management A report to City Council March 2006.
Replacing the Stormwater Fee City Council Business Meeting May 15, 2012.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Welcome to the Libertyville Stormwater Master Plan Open House
Jefferson County SA Red Rocks Site Approval
Delivering Water Reuse Solutions
Project Status & Right-of-Way Acquisition
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
City of Appleton Stormwater Management Update Presented to the
WEST & EAST DISTRICT PROJECTS PRESENTATION
Bay Ridge & Gum Bayou P.E.R.
Capital Improvement Program
Measure A Financial Oversight Committee August 7, 2013
Tulsa's Risk MAP Program Goals
Regulation Amendment AM April 3, 2018.
Water Quality Protection Zones
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
GALVESTON COUNTY WCID NO BOND PROGRAM
Environmental Protection Division
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan

Singhofen & Associates, Inc.April 28, 2015  To anticipate the need for additional services and infrastructure to provide opportunities for mixed use development with goods, services, and employment. Goal 1 Expansion

Singhofen & Associates, Inc.April 28, 2015  Section Numbers  Sections Already Modeled  Sections Being Modeled City of Palm Coast Modeling Status

Singhofen & Associates, Inc.April 28, 2015 City of Palm Coast Modeling Status

Singhofen & Associates, Inc.April 28, 2015  Section 35  High water levels due to  Constrictions at London Drive, US 1 (to Hulett Branch)  I-95 (to Mulberry Creek)  Home flooding predicted in < 1 % of homes (all in Bird of Paradise area)  Number of homes below City standard for 100-year event = 11 %  Secondary drainage deficiencies - 10 year event = 2 Modeling Results

Singhofen & Associates, Inc.April 28, 2015 Section 35 (“B” Section) – Level of Service Deficient secondary roads = 2 Secondary drainage deficiencies

 “B” Section (Section 35) Improvements  Ditch and Pipe Modifications  (Bunker Hill Drive to Burnaby Lane) 2014 Program Results

Singhofen & Associates, Inc.April 28, 2015  Section 37  High water levels due to  Constrictions at London Drive, US 1 (to Hulett Branch)  I-95 (to Mulberry Creek)  No home flooding predicted  Number of homes below City standard for 100-year event = 9 %  Secondary drainage deficiencies - 10 year event = 6 Modeling Results

Singhofen & Associates, Inc.April 28, 2015 Section 37 (“L” Section) – Level of Service Deficient secondary roads = 6 Secondary drainage deficiencies

 “L” Section (Section 37) Improvements  Ditch and Pipe Modifications  (Lindsay Drive to Lancelot Drive) 2015 Program Results

Singhofen & Associates, Inc.April 28, 2015 Sections 35 & 37 – Recommended Capital Improvements Possible Detention Storage Locations ~100-acft required in total

Singhofen & Associates, Inc. April 28, 2015  System Performance Evaluation For Homes:  Home flooding evaluated relative to base flood (i.e., 100-year storm)  City has required 1 foot of freeboard above 100-year elevation Level of Service Evaluations Freeboard

Singhofen & Associates, Inc. April 28, 2015 Model Results  Level of Service Improvement :  Homes below 100-year City standard reduced by 63 %  Homes remaining below 100-year City standard = 4 %  All secondary deficiencies eliminated

Singhofen & Associates, Inc. April 28, 2015 Recommended Improvement Plans based on Modeling Results for Section 35 and Section 37  Section 35 Improvements:  Ditch and Pipe Improvements  Design Completed  Construction Completed  Section 37 Improvements:  Ditch and Pipe Improvements  Design Completed  Construction is 50% Complete  Floodplain Storage Creation  Proposed areas include three general locations along the Belleaire canal waterway in Section 37.  Design, Permitting, and Construction Services proposed.

Singhofen & Associates, Inc. April 28, 2015 Next Step for Implementation Section 37 Floodplain Storage Permitting and Design Services  Scope of Services is in two Phases:  Phase 1:  Initial survey, environmental, and geotechnical services  Provide preliminary layout of proposed design (30% Plans)  Phase 2:  Finalizing proposed design  Prepare construction plans and permitting Staff recommends approving a work order for Section 37 Floodplain Storage Permitting and Design

Singhofen & Associates, Inc. April 28, 2015 QUESTIONS?