Shoreline Alteration/Dredge & Fill Permit Taylor Morrison of Florida, Inc. District 1 March 10, 2015 Environmental Protection Division Environmental Protection Division
Location Map Signature Lakes Parcel 1D, Phase II
Aerial Project Area SADF SADF
Current Proposal On October 16, 2014, the Environmental Protection Division (EPD) received a request that includes the following components: Re-initiate the maintenance dredging of the rim ditch identified in Permits SADF and SADF No changes to the permitted design are proposed. Remove Specific Condition No. 6 in SADF , which requires any boat docks be located within the ditch. After reviewing its practicality and application, this requirement actually promotes new dredging and boat dock configurations that result in greater environmental harm; and, Transfer SADF to Taylor Morrison of Florida, Inc. On October 16, 2014, the Environmental Protection Division (EPD) received a request that includes the following components: Re-initiate the maintenance dredging of the rim ditch identified in Permits SADF and SADF No changes to the permitted design are proposed. Remove Specific Condition No. 6 in SADF , which requires any boat docks be located within the ditch. After reviewing its practicality and application, this requirement actually promotes new dredging and boat dock configurations that result in greater environmental harm; and, Transfer SADF to Taylor Morrison of Florida, Inc.
Site Plan – SADF
Site Plan – SADF
Photographs
Action Requested Approval of the Shoreline Alteration/Dredge and Fill Permit (SADF ), subject to the conditions listed in the staff report. District 1